{"id":2305704,"date":"2026-10-12T00:46:52","date_gmt":"2026-10-11T22:46:52","guid":{"rendered":"https:\/\/kohenavocats.com\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\/"},"modified":"2026-10-12T00:46:52","modified_gmt":"2026-10-11T22:46:52","slug":"american-french-contractor-walked-off-deposit-defects-guarantees-recover","status":"publish","type":"post","link":"https:\/\/kohenavocats.com\/en\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\/","title":{"rendered":"My French Contractor Walked Off With My Deposit: How Americans Recover the Money, Finish the Work, and Trigger the French Building Guarantees"},"content":{"rendered":"<p>You bought the stone house in the Dordogne over FaceTime, wired a 30 percent deposit from your American bank account, and flew home feeling like the renovation would take four months. Six months later the contractor stops answering his phone, the scaffolding is still up, the bathroom is a concrete shell, and a neighbor tells you he has started another job two villages over. If you are an American owner managing French works from across the Atlantic, this is the moment where French construction law actually protects you better than you think, provided you follow its sequence to the letter.<\/p>\n<p>French law treats you as the <em>ma\u00eetre de l&#8217;ouvrage<\/em>, the project owner who commissions the work, and the builder as the <em>entrepreneur<\/em>, bound by a <em>march\u00e9<\/em>, a works contract that can be a fixed-price deal, known as a <em>march\u00e9 \u00e0 forfait<\/em>. The system gives you three levers Americans rarely expect: a unilateral right to end a fixed-price contract, a fast-track judge who can freeze the evidence and order emergency money before any full trial, and a ladder of three guarantees that runs one year, two years, and ten years from formal acceptance, called <em>r\u00e9ception<\/em>. This guide walks through each lever in order: first how to stop the bleeding, recover an overpaid deposit, and finish the job with someone else, then how to make the guarantees pay for defects once the dust settles.<\/p>\n<p>One warning about distance: everything below assumes you act in writing, by registered letter with return receipt, called a <em>lettre recommand\u00e9e avec accus\u00e9 de r\u00e9ception<\/em>, or by bailiff-equivalent service through a <em>commissaire de justice<\/em>, the officer formerly called a <em>huissier<\/em>. Phone calls, texts, and emails from the United States do not stop French limitation clocks. And if a hidden-defect fight with the seller is mixed into your story, read our companion piece on <a href=\"https:\/\/kohenavocats.com\/en\/american-old-french-house-hidden-defects-price-cut-cancellation\/\">hidden defects in old French houses<\/a> alongside this one, because seller liability and builder liability run on separate tracks.<\/p>\n<h2>I. Your Contractor Stopped Showing Up: How Americans End the Contract, Recover the Deposit, and Finish the Work<\/h2>\n<h3>A. How do you end a French building contract and get your deposit back from America?<\/h3>\n<p>Start with the contract paper itself. French renovation deals take many forms: a detailed quote you signed, called a <em>devis<\/em>, which becomes the contract once accepted; a fixed-price contract, the <em>march\u00e9 \u00e0 forfait<\/em>; or a cost-plus arrangement. The fixed-price form is the most common for a defined renovation, and it carries a striking owner-friendly rule. <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006443583\">Article 1794 of the Civil Code<\/a> provides: &#8220;Le ma\u00eetre peut r\u00e9silier, par sa seule volont\u00e9, le march\u00e9 \u00e0 forfait, quoique l&#8217;ouvrage soit d\u00e9j\u00e0 commenc\u00e9, en d\u00e9dommageant l&#8217;entrepreneur de toutes ses d\u00e9penses, de tous ses travaux, et de tout ce qu&#8217;il aurait pu gagner dans cette entreprise.&#8221; In plain terms, you as project owner may end a fixed-price job at any time by your will alone, even after work has started, but you owe the contractor his costs, his performed work, and the profit he would have earned. That last element surprises Americans: walking away cleanly means paying the lost profit, not just the bricks already laid.<\/p>\n<p>That rule does not leave you helpless when the contractor is the one at fault. The Court of Cassation confirmed on June 25, 2026, in <a href=\"https:\/\/www.courdecassation.fr\/decision\/6a3cc05ecdc6046d479d9103\">Third Civil Chamber, appeal no. 24-18.064<\/a>, that the owner&#8217;s unilateral termination power under Article 1794 does not take away the ordinary-law route: &#8220;Il r\u00e9sulte de la combinaison de ces textes que la facult\u00e9 de r\u00e9siliation unilat\u00e9rale d&#8217;un march\u00e9 \u00e0 forfait par le ma\u00eetre de l&#8217;ouvrage, pr\u00e9vue \u00e0 l&#8217;article 1794 du code civil, ne prive pas celui-ci de la possibilit\u00e9 de r\u00e9silier le march\u00e9 dans les conditions du droit commun.&#8221; In that case the trial court had wrongly treated every owner-led ending as an Article 1794 termination with automatic lost-profit compensation, even though the owner alleged delays, defective and missing work, and site abandonment. The high court quashed that reasoning and sent the case back, holding the lower court should have asked whether the contractor&#8217;s own breaches justified ending the contract at the contractor&#8217;s risk, with no lost-profit reward. For you, the lesson is binary: if you simply change your mind, expect to pay costs plus lost profit under Article 1794; if the contractor abandoned the site, botched the work, or missed every deadline, terminate for his breach under ordinary contract law and claim, not pay.<\/p>\n<p>In practice, from the United States, run this sequence before you declare anything ended. First, send a formal demand, a <em>mise en demeure<\/em>, by registered letter with return receipt to the contractor&#8217;s French business address, listing each missing or defective item, setting a firm final deadline of typically eight to fifteen days, and stating that you will have the work finished by another company at his expense. Keep the receipt slips and the tracking proof; French judges count deadlines from presentation, not from when you clicked send. Second, hire a <em>commissaire de justice<\/em> near the property to draw up a <em>constat<\/em>, a dated official report with photographs describing exactly what is done, what is half-done, and what is untouched, plus materials stored on site. That report, taken before anyone else touches the site, becomes the baseline for every later computation of overpayment. Third, freeze the money trail: gather the signed quote, every invoice, every wire confirmation showing what you paid and when, and a simple spreadsheet comparing the percentage paid against the percentage of work actually performed as shown in the report. If you paid 30,000 dollars on a 60,000 dollar job and the report shows one week of demolition worth perhaps 8,000, the gap is your recovery target.<\/p>\n<p>Do not let the contractor collect the balance while you argue. If unpaid invoices remain, pay nothing further until the accounting is set, and tell him in the same formal letter that any further payment is suspended pending the contradictory assessment. If he threatens to keep your materials or lock the site, remind him in writing that the site is your property and that you will change the locks through the proper channel after the official report. Never authorize a replacement contractor to demolish or cover the disputed work before the report and, ideally, before a court-ordered expert has seen it, because covering defective work destroys the proof you just paid to preserve.<\/p>\n<p>The fastest American-friendly tool at this stage is the emergency judge, the <em>juge des r\u00e9f\u00e9r\u00e9s<\/em> of the local <em>tribunal judiciaire<\/em>, the general civil court. <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000042597284\">Article 835 of the Code of Civil Procedure<\/a> states: &#8220;Le pr\u00e9sident du tribunal judiciaire ou le juge des contentieux de la protection dans les limites de sa comp\u00e9tence peuvent toujours, m\u00eame en pr\u00e9sence d&#8217;une contestation s\u00e9rieuse, prescrire en r\u00e9f\u00e9r\u00e9 les mesures conservatoires ou de remise en \u00e9tat qui s&#8217;imposent, soit pour pr\u00e9venir un dommage imminent, soit pour faire cesser un trouble manifestement illicite. Dans les cas o\u00f9 l&#8217;existence de l&#8217;obligation n&#8217;est pas s\u00e9rieusement contestable, ils peuvent accorder une provision au cr\u00e9ancier, ou ordonner l&#8217;ex\u00e9cution de l&#8217;obligation m\u00eame s&#8217;il s&#8217;agit d&#8217;une obligation de faire.&#8221; Concretely, that judge can authorize you within weeks to finish the work with a new company at the old contractor&#8217;s risk, order the return of an undisputed overpayment as a <em>provision<\/em>, an advance payment, and appoint an expert. You do not need to fly over for this; a French lawyer with a written power of attorney, a <em>pouvoir<\/em>, represents you, and your exhibits arrive as certified copies with translations where needed.<\/p>\n<p>Evidence before trial has its own doorway. <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000051869339\">Article 145 of the Code of Civil Procedure<\/a> provides: &#8220;S&#8217;il existe un motif l\u00e9gitime de conserver ou d&#8217;\u00e9tablir avant tout proc\u00e8s la preuve de faits dont pourrait d\u00e9pendre la solution d&#8217;un litige, les mesures d&#8217;instruction l\u00e9galement admissibles peuvent \u00eatre ordonn\u00e9es \u00e0 la demande de tout int\u00e9ress\u00e9, sur requ\u00eate ou en r\u00e9f\u00e9r\u00e9.&#8221; That is the legal basis for a pre-trial expert inspection, an <em>expertise<\/em> ordered in <em>r\u00e9f\u00e9r\u00e9<\/em>, where a court-appointed expert visits with both sides present, records the state of the site, and later opines on causes and costs. For work inside a building, the court of the property&#8217;s location has exclusive jurisdiction, so file where the house sits, not where the contractor&#8217;s office is. Ask for the expert mission to cover completion percentage, conformity with the quote and with French technical standards, the cost to complete, and the cost to redo defective items. That report typically drives settlement, because both sides can finally price the ending instead of shouting across the ocean.<\/p>\n<h3>B. Who pays to finish the job, and how do you prove the extra cost from abroad?<\/h3>\n<p>Once the contract is ended at the defaulting contractor&#8217;s risk, the completion surcharge shifts to him, within the limits a judge will accept. French courts compare two figures: what you had agreed to pay the first contractor for the whole job, and what you reasonably had to pay the replacement to reach the same result, plus the proven cost of redoing defective work. Suppose the original fixed price was 55,000 euros, you had paid 20,000, and finishing with a new company costs 42,000 because prices rose and the new crew must first undo bad waterproofing. Your damage claim is the 7,000 euro overrun plus the redo costs, supported by the new signed quote, paid invoices, and the expert&#8217;s finding that the extra work was necessary. Keep every replacement bid in writing, pick a mid-range documented bid rather than the gold-plated one, and make the new contract reference the expert&#8217;s list so the chain of causation is visible on paper.<\/p>\n<p>Deposits deserve special attention because Americans often wire them before any work begins. French consumer-protection rules cap what a professional can demand in certain standard-form contracts, and an excessive upfront payment without any work performed can be reclaimed with interest once the contract is ended for the contractor&#8217;s breach. Even outside those special regimes, the accounting principle is the same: the contractor keeps only the value of work actually performed in conformity with the contract, plus materials verifiably delivered to your site and usable for completion. He does not keep a deposit as a penalty unless the contract contains a lawful forfeit clause, a <em>clause p\u00e9nale<\/em>, proportionate to the harm, which a judge can reduce if it is manifestly excessive. Challenge any invoice for work never done by matching each line against the bailiff&#8217;s report photographs, and ask the expert to value each room separately so phantom percentages cannot hide.<\/p>\n<p>Distance creates three traps you should close early. First, the mailbox trap: French termination and demand letters run from proper delivery to the contractor&#8217;s last known professional address, so confirm his registered address on the quote and on the national business register extract, the <em>extrait Kbis<\/em>, before mailing, and send a parallel email for speed that explicitly refers to the registered letter. Second, the insurance trap: before hiring the replacement, demand proof of his ten-year liability insurance, the <em>assurance responsabilit\u00e9 civile d\u00e9cennale<\/em>, and his general liability certificate, then call the insurer to confirm the policy covers the year and the type of work. An uninsured replacement trades one dispute for another. Third, the payment-trail trap: always wire to the company&#8217;s French business account named in the contract, never in cash and never to a personal account revealed mid-job, and label each wire with the invoice number. French judges and experts trust bank traces; they discount envelopes of cash an American owner can never prove.<\/p>\n<p>If the contractor has truly vanished or gone insolvent, adjust the target. A court judgment against an empty shell collects nothing, so check solvency early through the business register for insolvency filings, called a <em>proc\u00e9dure collective<\/em>, and through the insurer, who often remains solvent when the builder is not. Where the contractor was required to carry ten-year liability coverage, claims for covered damage can be directed at the insurer directly. Where no insurance exists and the company is judgment-proof, your best recovery may be stopping further payments, mitigating by finishing efficiently, and preserving the loss for setoff rather than throwing good money after bad on enforcement. A candid early solvency check saves more than a heroic late lawsuit.<\/p>\n<h2>II. The Work Is Done but Defective: How Americans Trigger the One-Year, Two-Year, and Ten-Year French Guarantees<\/h2>\n<h3>A. Which French guarantee covers your defect, and when does each clock start?<\/h3>\n<p>French construction liability pivots on a single event: <em>r\u00e9ception<\/em>, the formal acceptance of the work. <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006443552\">Article 1792-6 of the Civil Code<\/a> defines it in one sentence: &#8220;La r\u00e9ception est l&#8217;acte par lequel le ma\u00eetre de l&#8217;ouvrage d\u00e9clare accepter l&#8217;ouvrage avec ou sans r\u00e9serves.&#8221; It comes in three flavors: express acceptance signed with or without a punch list of <em>r\u00e9serves<\/em>, implied acceptance inferred from conduct, or court-ordered acceptance, called <em>r\u00e9ception judiciaire<\/em>, when one side wrongly refuses to participate. From that date run three different guarantees, and mislabeling your defect is the most common way Americans lose.<\/p>\n<p>The first rung is the one-year perfect-completion guarantee, the <em>garantie de parfait ach\u00e8vement<\/em>. The same <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006443552\">Article 1792-6<\/a> continues: &#8220;La garantie de parfait ach\u00e8vement, \u00e0 laquelle l&#8217;entrepreneur est tenu pendant un d\u00e9lai d&#8217;un an, \u00e0 compter de la r\u00e9ception, s&#8217;\u00e9tend \u00e0 la r\u00e9paration de tous les d\u00e9sordres signal\u00e9s par le ma\u00eetre de l&#8217;ouvrage, soit au moyen de r\u00e9serves mentionn\u00e9es au proc\u00e8s-verbal de r\u00e9ception, soit par voie de notification \u00e9crite pour ceux r\u00e9v\u00e9l\u00e9s post\u00e9rieurement \u00e0 la r\u00e9ception.&#8221; Every defect you note at acceptance or notify in writing during the following year must be repaired in kind, and if the contractor defaults after formal demand, the work can proceed at his expense and risk. The statute adds that repair deadlines are set by mutual agreement, and failing agreement or performance after an unheeded formal demand, completion moves forward chargeable to the defaulter. For an American owner, this means the acceptance walkthrough, the <em>visite de r\u00e9ception<\/em>, is the most valuable hour of the whole project: bring an independent inspector, test every window, tap, switch, and drain, photograph everything, and write every flaw into the signed minutes, the <em>proc\u00e8s-verbal de r\u00e9ception<\/em>, because unwritten complaints evaporate.<\/p>\n<p>The second rung is the two-year proper-functioning guarantee for equipment, the <em>garantie biennale<\/em>. <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006443534\">Article 1792-3 of the Civil Code<\/a> states: &#8220;Les autres \u00e9l\u00e9ments d&#8217;\u00e9quipement de l&#8217;ouvrage font l&#8217;objet d&#8217;une garantie de bon fonctionnement d&#8217;une dur\u00e9e minimale de deux ans \u00e0 compter de sa r\u00e9ception.&#8221; This covers separable equipment that does not merge into the structure: a boiler that can be swapped without cutting into walls, shutters, faucets, or a heat pump unit that lifts out cleanly. If the item stops working properly within two years of acceptance, the builder must repair or replace it. Keep the acceptance date proof and the equipment notices, because the fight is usually about the calendar, not the breakdown.<\/p>\n<p>The third rung is the famous ten-year guarantee, the <em>garantie d\u00e9cennale<\/em>, and it is strict. <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006443502\">Article 1792 of the Civil Code<\/a> provides: &#8220;Tout constructeur d&#8217;un ouvrage est responsable de plein droit, envers le ma\u00eetre ou l&#8217;acqu\u00e9reur de l&#8217;ouvrage, des dommages, m\u00eame r\u00e9sultant d&#8217;un vice du sol, qui compromettent la solidit\u00e9 de l&#8217;ouvrage ou qui, l&#8217;affectant dans l&#8217;un de ses \u00e9l\u00e9ments constitutifs ou l&#8217;un de ses \u00e9l\u00e9ments d&#8217;\u00e9quipement, le rendent impropre \u00e0 sa destination. Une telle responsabilit\u00e9 n&#8217;a point lieu si le constructeur prouve que les dommages proviennent d&#8217;une cause \u00e9trang\u00e8re.&#8221; No proof of negligence is needed; if the damage threatens structural soundness or makes the building unfit for its purpose, the builder is liable unless he proves an outside cause. Who counts as a builder is deliberately wide: <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006443512\">Article 1792-1<\/a> states: &#8220;Est r\u00e9put\u00e9 constructeur de l&#8217;ouvrage : 1\u00b0 Tout architecte, entrepreneur, technicien ou autre personne li\u00e9e au ma\u00eetre de l&#8217;ouvrage par un contrat de louage d&#8217;ouvrage ; 2\u00b0 Toute personne qui vend, apr\u00e8s ach\u00e8vement, un ouvrage qu&#8217;elle a construit ou fait construire ; 3\u00b0 Toute personne qui, bien qu&#8217;agissant en qualit\u00e9 de mandataire du propri\u00e9taire de l&#8217;ouvrage, accomplit une mission assimilable \u00e0 celle d&#8217;un locateur d&#8217;ouvrage.&#8221; Architects, general contractors, and even a developer-seller after completion all sit inside that circle.<\/p>\n<p>Two refinements decide most American renovation disputes. First, equipment permanently fused into the structure joins the ten-year regime: <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006443524\">Article 1792-2<\/a> explains: &#8220;La pr\u00e9somption de responsabilit\u00e9 \u00e9tablie par l&#8217;article 1792 s&#8217;\u00e9tend \u00e9galement aux dommages qui affectent la solidit\u00e9 des \u00e9l\u00e9ments d&#8217;\u00e9quipement d&#8217;un ouvrage, mais seulement lorsque ceux-ci font indissociablement corps avec les ouvrages de viabilit\u00e9, de fondation, d&#8217;ossature, de clos ou de couvert. Un \u00e9l\u00e9ment d&#8217;\u00e9quipement est consid\u00e9r\u00e9 comme formant indissociablement corps avec l&#8217;un des ouvrages de viabilit\u00e9, de fondation, d&#8217;ossature, de clos ou de couvert lorsque sa d\u00e9pose, son d\u00e9montage ou son remplacement ne peut s&#8217;effectuer sans d\u00e9t\u00e9rioration ou enl\u00e8vement de mati\u00e8re de cet ouvrage.&#8221; Underfloor heating embedded in the slab, waterproof membranes under tile, or built-in drainage tearing the wall on removal belong to the ten-year track; a freestanding appliance does not. Second, no contract clause can shrink these protections: <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006443652\">Article 1792-5<\/a> declares: &#8220;Toute clause d&#8217;un contrat qui a pour objet, soit d&#8217;exclure ou de limiter la responsabilit\u00e9 pr\u00e9vue aux articles 1792 , 1792-1 et 1792-2 , soit d&#8217;exclure les garanties pr\u00e9vues aux articles 1792-3 et 1792-6 ou d&#8217;en limiter la port\u00e9e, soit d&#8217;\u00e9carter ou de limiter la solidarit\u00e9 pr\u00e9vue \u00e0 l&#8217;article 1792-4 , est r\u00e9put\u00e9e non \u00e9crite.&#8221; Any line in your quote purporting to waive the ten-year, two-year, or one-year guarantees is treated as unwritten. And the outer boundary is fixed by <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000019017055\">Article 1792-4-1<\/a>: &#8220;Toute personne physique ou morale dont la responsabilit\u00e9 peut \u00eatre engag\u00e9e en vertu des articles 1792 \u00e0 1792-4 du pr\u00e9sent code est d\u00e9charg\u00e9e des responsabilit\u00e9s et garanties pesant sur elle, en application des articles 1792 \u00e0 1792-2, apr\u00e8s dix ans \u00e0 compter de la r\u00e9ception des travaux ou, en application de l&#8217;article 1792-3 , \u00e0 l&#8217;expiration du d\u00e9lai vis\u00e9 \u00e0 cet article.&#8221; Ten years from acceptance for structural and fitness defects, two years for separable equipment, full stop.<\/p>\n<h3>B. How do you force repair or payment when the builder hides behind insurance or silence?<\/h3>\n<p>The acceptance date is where many absentee owners stumble, and the Court of Cassation has given you a clear counting rule. In <a href=\"https:\/\/www.courdecassation.fr\/decision\/5fca28ccc8c4b77eec00da3c\">Third Civil Chamber, November 12, 2020, appeal no. 19-18.213<\/a>, a hotel owner took possession of a renovated building and put its new climate system into service in September 2005 but paid the final invoice only on May 26, 2006. The contractor argued the ten-year clock should have started at first use; the owner argued for the later payment date. The high court approved the appeal court&#8217;s finding that &#8220;elle a pu en d\u00e9duire que la r\u00e9ception tacite r\u00e9sultait de la prise de possession jointe au paiement int\u00e9gral, de sorte que la date \u00e0 retenir pour le point de d\u00e9part de l&#8217;action en garantie d\u00e9cennale \u00e9tait le 26 mai 2006.&#8221; Implied acceptance, called <em>r\u00e9ception tacite<\/em>, arose from the combination of taking possession and paying in full, and the later of the two events set the starting line. The same ruling confirmed that a complete supply-and-installation of a building&#8217;s climate system with compressors, units, ducts, and piping through the walls counts as construction of a structure, an <em>ouvrage<\/em>, and that an underpowered installation failing whenever temperatures turned extreme supported ten-year liability because repeated breakdowns showed the system could not operate normally or last. For your renovation, the message is practical: move into the house and pay the balance without written reservations and a court may treat that pair of acts as acceptance; refuse acceptance in writing, list the defects, and hold back a documented portion, and the clock does not start against you.<\/p>\n<p>Insurance is the second front, and France requires it on both sides before the first hammer falls. Every builder with ten-year exposure must carry ten-year liability cover, and you as project owner must take out a first-party policy called <em>assurance dommages-ouvrage<\/em>, commonly shortened to DO. <a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000019265425\">Article L.242-1 of the Insurance Code<\/a> commands: &#8220;Toute personne physique ou morale qui, agissant en qualit\u00e9 de propri\u00e9taire de l&#8217;ouvrage, de vendeur ou de mandataire du propri\u00e9taire de l&#8217;ouvrage, fait r\u00e9aliser des travaux de construction, doit souscrire avant l&#8217;ouverture du chantier, pour son compte ou pour celui des propri\u00e9taires successifs, une assurance garantissant, en dehors de toute recherche des responsabilit\u00e9s, le paiement de la totalit\u00e9 des travaux de r\u00e9paration des dommages de la nature de ceux dont sont responsables les constructeurs au sens de l&#8217;article 1792-1&#8243;&#8221; That policy pays for covered repairs without waiting for the blame debate, then chases the responsible parties itself. Americans who skip it to save a few thousand euros discover the cost at the worst moment: without DO coverage you fund the repairs during years of litigation and recover later, while with it the insurer prefunds and litigates. Before any renovation touching structure, envelope, waterproofing, heating embedded in floors, or anything affecting fitness for use, buy the DO policy, disclose the project value honestly, and keep the certificate with the acceptance minutes. Lenders and future buyers will ask for it, and a missing certificate depresses resale.<\/p>\n<p>When defects appear, notify in the order the guarantees demand. During year one, write to the contractor invoking the perfect-completion guarantee, listing each disorder with photographs, and set a repair deadline by mutual agreement, confirming everything in writing. For equipment failures in years one and two, invoke the two-year proper-functioning guarantee against the installer, attaching the acceptance date and the failure log. For structural or fitness threats within ten years, notify both the contractor and his ten-year insurer, plus your DO insurer if you hold one, describing how the damage affects soundness or use: cracked load-bearing walls, collapsed drains, pervasive water entry, a heating system incapable of heating, a roof that will not stay watertight. Describe effects, not legal labels; the expert and the judge will classify. Never let the contractor&#8217;s team perform destructive investigation alone; insist on a joint visit with your own inspector present, or better, wait for the court-appointed expert, because an unsupervised opening of walls lets the other side claim you aggravated the damage.<\/p>\n<p>The court-appointed expert procedure remains your most persuasive spend. Filed at the property&#8217;s court under Article 145, it produces a neutral technical record of causes, responsibility shares, and repair figures that insurers actually pay against. Give the expert a clean file: the signed quote and any amendments, the acceptance minutes with reservations, dated photographs before and after, the bailiff&#8217;s report, all invoices and wires, the DO certificate, and the ten-year policy numbers. Ask that the expert distinguish disorders by guarantee track, price repair versus replacement, and state whether each defect compromises soundness or fitness for use. Most French construction cases settle on the draft report, long before a full trial, because the numbers become undeniable. If settlement fails, the same file feeds the emergency judge for an interim payment under Article 835 or the full court for final judgment, and your American residence changes nothing about admissibility as long as documents arrive translated and certified where required.<\/p>\n<p>Two final cautions protect the value of everything above. First, limitation discipline: the ten-year action must be brought within ten years of acceptance, the two-year action within two years, and ordinary contract claims for non-covered disorders generally within five years of discovering them, so diary every deadline from the acceptance date and file early rather than negotiating past midnight. Second, the resale shadow: when you later sell the French house, the buyer inherits the benefit of the guarantees running from your acceptance, and French sale files require disclosure of construction work and insurance certificates. A well-kept folder with acceptance minutes, DO policy, ten-year certificates, expert reports, and paid completion invoices converts directly into sale price, while a shoebox of untranslated wires and unsigned quotes invites the buyer&#8217;s notary, the <em>notaire<\/em>, to discount or delay closing.<\/p>\n<h2>Conclusion<\/h2>\n<p>An abandoned French building site feels like a disaster from three thousand miles away, but French law gives the distant American owner a defined path. End the right contract the right way, choosing ordinary-law termination for breach over compensated withdrawal when the contractor failed first, as the June 2026 Cassation ruling pr\u00e9serves. Freeze proof through a bailiff&#8217;s report and a court-ordered expert under Article 145, unlock emergency completion and interim money through the fast-track judge under Article 835, and price the overpayment against documented replacement costs. Then sort every later defect onto its proper rung: year-one perfect completion under Article 1792-6, years-one-to-two equipment cover under Article 1792-3, and the strict ten-year shield of Article 1792 for anything threatening soundness or fitness, with fused equipment pulled into that decade by Article 1792-2, waiver clauses erased by Article 1792-5, and the whole architecture closed by Article 1792-4-1. Pin the starting date with the acceptance rule the November 2020 Cassation decision confirms, taking possession plus full payment together, and prefund covered repairs through the owner-side policy Article L.242-1 demands. Run that sequence in writing, from America if needed, and the renovation that stalled in the Dordogne can still end as the house you came for.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Your French builder stopped coming but kept the deposit. How Americans end the contract, prove overpayment from abroad, and use the one, two, and ten-year French guarantees.<\/p>\n","protected":false},"author":232070755,"featured_media":3893,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_kj_source_type":"","_kj_official_id":"","_kj_official_url":"","_kj_judilibre_id":"","_kj_jur":"","_kj_lieu":"","_kj_chambre":"","_kj_rg":"","_kj_date":"","footnotes":""},"categories":[301653,301720],"tags":[],"class_list":["post-2305704","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-american-desk","category-decryptage"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.1 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>My French Contractor Walked Off With My Deposit: How Americans Recover the Money, Finish the Work, and Trigger the French Building Guarantees<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/kohenavocats.com\/en\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"My French Contractor Walked Off With My Deposit: How Americans Recover the Money, Finish the Work, and Trigger the French Building Guarantees\" \/>\n<meta property=\"og:description\" content=\"Your French builder stopped coming but kept the deposit. How Americans end the contract, prove overpayment from abroad, and use the one, two, and ten-year French guarantees.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/kohenavocats.com\/en\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\/\" \/>\n<meta property=\"og:site_name\" content=\"Hassan KOHEN\" \/>\n<meta property=\"article:published_time\" content=\"2026-10-11T22:46:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/kohenavocats.com\/wp-content\/uploads\/2026\/11\/kohen-avocats-partage.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Kohen\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Kohen\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"21 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\\\/\"},\"author\":{\"name\":\"Kohen\",\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/#\\\/schema\\\/person\\\/761c9ba54fa1ca84d405cef0831ff751\"},\"headline\":\"My French Contractor Walked Off With My Deposit: How Americans Recover the Money, Finish the Work, and Trigger the French Building Guarantees\",\"datePublished\":\"2026-10-11T22:46:52+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\\\/\"},\"wordCount\":4318,\"publisher\":{\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/kohenavocats.com\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/chris-karidis-F77D9r-qIqU-unsplash.webp\",\"articleSection\":[\"American Desk\",\"D\u00e9cryptage\"],\"inLanguage\":\"en-US\",\"citation\":\"My French Contractor Walked Off With My Deposit: How Americans Recover the Money, Finish the Work, and Trigger the French Building Guarantees\",\"about\":[{\"@type\":\"Thing\",\"name\":\"American Desk\"},{\"@type\":\"Thing\",\"name\":\"D\u00e9cryptage\"}],\"dateModified\":\"2026-10-11T22:46:52+00:00\",\"speakable\":{\"@type\":\"SpeakableSpecification\",\"cssSelector\":[\".article-content > p:first-of-type\"]}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\\\/\",\"url\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\\\/\",\"name\":\"My French Contractor Walked Off With My Deposit: How Americans Recover the Money, Finish the Work, and Trigger the French Building Guarantees\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/kohenavocats.com\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/chris-karidis-F77D9r-qIqU-unsplash.webp\",\"datePublished\":\"2026-10-11T22:46:52+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/kohenavocats.com\\\/en\\\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\\\/#primaryimage\",\"url\":\"https:\\\/\\\/kohenavocats.com\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/chris-karidis-F77D9r-qIqU-unsplash.webp\",\"contentUrl\":\"https:\\\/\\\/kohenavocats.com\\\/wp-content\\\/uploads\\\/2024\\\/07\\\/chris-karidis-F77D9r-qIqU-unsplash.webp\",\"width\":6016,\"height\":4000},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"My French Contractor Walked Off With My Deposit: How Americans Recover the Money, Finish the Work, and Trigger the French Building Guarantees\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/\",\"name\":\"Hassan KOHEN\",\"description\":\"Ma\u00eetre Hassan Kohen, avocat p\u00e9naliste \u00e0 Paris, intervient exclusivement en droit p\u00e9nal pour la d\u00e9fense des particuliers, notamment en mati\u00e8re d\u2019accusations de viol. Il assure un accompagnement rigoureux d\u00e8s la garde \u00e0 vue jusqu\u2019\u00e0 la Cour d\u2019assises, veillant au strict respect des garanties proc\u00e9durales.\",\"publisher\":{\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/#organization\",\"name\":\"Hassan KOHEN\",\"url\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/kohenavocats.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/Logo-2-1.webp\",\"contentUrl\":\"https:\\\/\\\/kohenavocats.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/Logo-2-1.webp\",\"width\":2114,\"height\":1253,\"caption\":\"Hassan KOHEN\"},\"image\":{\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"}},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/#\\\/schema\\\/person\\\/761c9ba54fa1ca84d405cef0831ff751\",\"name\":\"Kohen\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1c5e76ef76bbbfdd2b4da984e2bf2fa4056fd51a27d25ce2c332047f1dfd6e00?s=96&d=identicon&r=g\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1c5e76ef76bbbfdd2b4da984e2bf2fa4056fd51a27d25ce2c332047f1dfd6e00?s=96&d=identicon&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1c5e76ef76bbbfdd2b4da984e2bf2fa4056fd51a27d25ce2c332047f1dfd6e00?s=96&d=identicon&r=g\",\"caption\":\"Kohen\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/in\\\/hassan-kohen-448548192\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@Kohen-Avocats\"],\"url\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/author\\\/kohenmlk\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"My French Contractor Walked Off With My Deposit: How Americans Recover the Money, Finish the Work, and Trigger the French Building Guarantees","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/kohenavocats.com\/en\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\/","og_locale":"en_US","og_type":"article","og_title":"My French Contractor Walked Off With My Deposit: How Americans Recover the Money, Finish the Work, and Trigger the French Building Guarantees","og_description":"Your French builder stopped coming but kept the deposit. How Americans end the contract, prove overpayment from abroad, and use the one, two, and ten-year French guarantees.","og_url":"https:\/\/kohenavocats.com\/en\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\/","og_site_name":"Hassan KOHEN","article_published_time":"2026-10-11T22:46:52+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/kohenavocats.com\/wp-content\/uploads\/2026\/11\/kohen-avocats-partage.jpg","type":"image\/jpeg"}],"author":"Kohen","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Kohen","Est. reading time":"21 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/kohenavocats.com\/en\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\/#article","isPartOf":{"@id":"https:\/\/kohenavocats.com\/en\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\/"},"author":{"name":"Kohen","@id":"https:\/\/kohenavocats.com\/en\/#\/schema\/person\/761c9ba54fa1ca84d405cef0831ff751"},"headline":"My French Contractor Walked Off With My Deposit: How Americans Recover the Money, Finish the Work, and Trigger the French Building Guarantees","datePublished":"2026-10-11T22:46:52+00:00","mainEntityOfPage":{"@id":"https:\/\/kohenavocats.com\/en\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\/"},"wordCount":4318,"publisher":{"@id":"https:\/\/kohenavocats.com\/en\/#organization"},"image":{"@id":"https:\/\/kohenavocats.com\/en\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\/#primaryimage"},"thumbnailUrl":"https:\/\/kohenavocats.com\/wp-content\/uploads\/2024\/07\/chris-karidis-F77D9r-qIqU-unsplash.webp","articleSection":["American Desk","D\u00e9cryptage"],"inLanguage":"en-US","citation":"My French Contractor Walked Off With My Deposit: How Americans Recover the Money, Finish the Work, and Trigger the French Building Guarantees","about":[{"@type":"Thing","name":"American Desk"},{"@type":"Thing","name":"D\u00e9cryptage"}],"dateModified":"2026-10-11T22:46:52+00:00","speakable":{"@type":"SpeakableSpecification","cssSelector":[".article-content > p:first-of-type"]}},{"@type":"WebPage","@id":"https:\/\/kohenavocats.com\/en\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\/","url":"https:\/\/kohenavocats.com\/en\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\/","name":"My French Contractor Walked Off With My Deposit: How Americans Recover the Money, Finish the Work, and Trigger the French Building Guarantees","isPartOf":{"@id":"https:\/\/kohenavocats.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/kohenavocats.com\/en\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\/#primaryimage"},"image":{"@id":"https:\/\/kohenavocats.com\/en\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\/#primaryimage"},"thumbnailUrl":"https:\/\/kohenavocats.com\/wp-content\/uploads\/2024\/07\/chris-karidis-F77D9r-qIqU-unsplash.webp","datePublished":"2026-10-11T22:46:52+00:00","breadcrumb":{"@id":"https:\/\/kohenavocats.com\/en\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/kohenavocats.com\/en\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/kohenavocats.com\/en\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\/#primaryimage","url":"https:\/\/kohenavocats.com\/wp-content\/uploads\/2024\/07\/chris-karidis-F77D9r-qIqU-unsplash.webp","contentUrl":"https:\/\/kohenavocats.com\/wp-content\/uploads\/2024\/07\/chris-karidis-F77D9r-qIqU-unsplash.webp","width":6016,"height":4000},{"@type":"BreadcrumbList","@id":"https:\/\/kohenavocats.com\/en\/american-french-contractor-walked-off-deposit-defects-guarantees-recover\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/kohenavocats.com\/en\/"},{"@type":"ListItem","position":2,"name":"My French Contractor Walked Off With My Deposit: How Americans Recover the Money, Finish the Work, and Trigger the French Building Guarantees"}]},{"@type":"WebSite","@id":"https:\/\/kohenavocats.com\/en\/#website","url":"https:\/\/kohenavocats.com\/en\/","name":"Hassan KOHEN","description":"Ma\u00eetre Hassan Kohen, avocat p\u00e9naliste \u00e0 Paris, intervient exclusivement en droit p\u00e9nal pour la d\u00e9fense des particuliers, notamment en mati\u00e8re d\u2019accusations de viol. Il assure un accompagnement rigoureux d\u00e8s la garde \u00e0 vue jusqu\u2019\u00e0 la Cour d\u2019assises, veillant au strict respect des garanties proc\u00e9durales.","publisher":{"@id":"https:\/\/kohenavocats.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/kohenavocats.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/kohenavocats.com\/en\/#organization","name":"Hassan KOHEN","url":"https:\/\/kohenavocats.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/kohenavocats.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/kohenavocats.com\/wp-content\/uploads\/2026\/01\/Logo-2-1.webp","contentUrl":"https:\/\/kohenavocats.com\/wp-content\/uploads\/2026\/01\/Logo-2-1.webp","width":2114,"height":1253,"caption":"Hassan KOHEN"},"image":{"@id":"https:\/\/kohenavocats.com\/en\/#\/schema\/logo\/image\/"}},{"@type":"Person","@id":"https:\/\/kohenavocats.com\/en\/#\/schema\/person\/761c9ba54fa1ca84d405cef0831ff751","name":"Kohen","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/1c5e76ef76bbbfdd2b4da984e2bf2fa4056fd51a27d25ce2c332047f1dfd6e00?s=96&d=identicon&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/1c5e76ef76bbbfdd2b4da984e2bf2fa4056fd51a27d25ce2c332047f1dfd6e00?s=96&d=identicon&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/1c5e76ef76bbbfdd2b4da984e2bf2fa4056fd51a27d25ce2c332047f1dfd6e00?s=96&d=identicon&r=g","caption":"Kohen"},"sameAs":["https:\/\/www.linkedin.com\/in\/hassan-kohen-448548192\/","https:\/\/www.youtube.com\/@Kohen-Avocats"],"url":"https:\/\/kohenavocats.com\/en\/author\/kohenmlk\/"}]}},"_links":{"self":[{"href":"https:\/\/kohenavocats.com\/en\/wp-json\/wp\/v2\/posts\/2305704","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kohenavocats.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kohenavocats.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kohenavocats.com\/en\/wp-json\/wp\/v2\/users\/232070755"}],"replies":[{"embeddable":true,"href":"https:\/\/kohenavocats.com\/en\/wp-json\/wp\/v2\/comments?post=2305704"}],"version-history":[{"count":0,"href":"https:\/\/kohenavocats.com\/en\/wp-json\/wp\/v2\/posts\/2305704\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kohenavocats.com\/en\/wp-json\/wp\/v2\/media\/3893"}],"wp:attachment":[{"href":"https:\/\/kohenavocats.com\/en\/wp-json\/wp\/v2\/media?parent=2305704"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kohenavocats.com\/en\/wp-json\/wp\/v2\/categories?post=2305704"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kohenavocats.com\/en\/wp-json\/wp\/v2\/tags?post=2305704"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}