{"id":2555057,"date":"2026-11-28T18:08:14","date_gmt":"2026-11-28T17:08:14","guid":{"rendered":"https:\/\/kohenavocats.com\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\/"},"modified":"2026-11-28T18:08:14","modified_gmt":"2026-11-28T17:08:14","slug":"foreign-subcontractor-unpaid-france-claim-project-owner-directly","status":"publish","type":"post","link":"https:\/\/kohenavocats.com\/en\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\/","title":{"rendered":"Unpaid by the main contractor on a French project: can a foreign subcontractor claim directly from the project owner?"},"content":{"rendered":"<p>Your company carried out part of a project in France: fitting out a factory, installing equipment, building a section of a warehouse, or delivering made-to-measure components for a building. You were hired not by the French client but by the main contractor (<em>entrepreneur principal<\/em>), and that contractor has stopped paying, is disputing your invoices or has gone into insolvency proceedings. French law may let you turn to the client that commissioned the works, called the project owner (<em>ma\u00eetre de l&#8217;ouvrage<\/em>). Article 12 of Act No. 75-1334 of 31 December 1975 on subcontracting (<em>loi relative \u00e0 la sous-traitance<\/em>) gives a subcontractor a direct claim (<em>action directe<\/em>) against the project owner when the main contractor has not paid one month after a formal notice (<em>mise en demeure<\/em>), a copy of which must be sent to the project owner (<a href=\"https:\/\/www.legifrance.gouv.fr\/loda\/article_lc\/LEGIARTI000006467152\">article 12 of the 1975 Act<\/a>).<\/p>\n<p>Two points make this route urgent rather than theoretical. First, the project owner owes you at most what it still owes the main contractor on the day it receives the copy of your notice (<a href=\"https:\/\/www.legifrance.gouv.fr\/loda\/article_lc\/LEGIARTI000006467153\">article 13 of the 1975 Act<\/a>): every payment it makes to the main contractor before that day reduces what you can recover. Second, if the main contractor is already in liquidation, a letter to the contractor no longer works; the Cour de cassation requires a copy of the proof of claim (<em>d\u00e9claration de cr\u00e9ance<\/em>) filed in the insolvency to be sent to the project owner (<a href=\"https:\/\/www.courdecassation.fr\/decision\/64af96df049d5c05db172f2a\">Cass. 3e civ., 13 July 2023, No. 21-23.747<\/a>). This article explains, for a subcontractor based in the United Kingdom, Ireland, the United States or India, when the French Act applies despite a foreign-law clause, what acceptance by the project owner means in practice, and how to claim payment on a private or a public project. It describes the rules in general terms and does not assess any particular project or company.<\/p>\n<h2>I. Does French subcontracting law protect a subcontractor based abroad?<\/h2>\n<h3>A. Can a clause choosing English or another foreign law exclude the 1975 Act?<\/h3>\n<p>Start with the definition, because everything else depends on it. Under article 1 of the Act, subcontracting is \u00ab l&#8217;op\u00e9ration par laquelle un entrepreneur confie par un sous-trait\u00e9, et sous sa responsabilit\u00e9, \u00e0 une autre personne appel\u00e9e sous-traitant l&#8217;ex\u00e9cution de tout ou partie du contrat d&#8217;entreprise ou d&#8217;une partie du march\u00e9 public conclu avec le ma\u00eetre de l&#8217;ouvrage \u00bb (the operation by which a contractor entrusts, by a subcontract and under its own responsibility, to another person called the subcontractor the performance of all or part of the works contract or of part of the public contract concluded with the project owner) (<a href=\"https:\/\/www.legifrance.gouv.fr\/loda\/article_lc\/LEGIARTI000023053343\">article 1 of the 1975 Act<\/a>). Three parties are involved: the project owner, the main contractor and you. Your contract, the subcontract (<em>sous-trait\u00e9<\/em>), is with the main contractor only. Without the Act, you would have no claim against a company with which you signed nothing.<\/p>\n<p>Subcontracts drafted outside France often contain a clause choosing English law, the law of a US state or the law of the main contractor&#8217;s home country. The 1975 Act anticipates attempts to contract out of it. Its article 15 provides: \u00ab Sont nuls et de nul effet, quelle qu&#8217;en soit la forme, les clauses, stipulations et arrangements qui auraient pour effet de faire \u00e9chec aux dispositions de la pr\u00e9sente loi \u00bb (clauses, stipulations and arrangements which would have the effect of defeating the provisions of this Act are null and void, whatever their form) (<a href=\"https:\/\/www.legifrance.gouv.fr\/loda\/article_lc\/LEGIARTI000006467160\">article 15 of the 1975 Act<\/a>). Article 12 adds that \u00ab Toute renonciation \u00e0 l&#8217;action directe est r\u00e9put\u00e9e non \u00e9crite \u00bb (any waiver of the direct claim is deemed unwritten) (<a href=\"https:\/\/www.legifrance.gouv.fr\/loda\/article_lc\/LEGIARTI000006467152\">article 12 of the 1975 Act<\/a>). These provisions only help, however, if French law applies to your situation in the first place, and that question divided the courts for years.<\/p>\n<p>In January 2007, the First Civil Chamber of the Cour de cassation, France&#8217;s highest court for civil and commercial matters, approved a court of appeal that had refused a subcontractor the direct claim because both the main contract and the subcontract were governed by German law, chosen by the parties, which gave no such claim (<a href=\"https:\/\/www.courdecassation.fr\/decision\/607941b39ba5988459c4113a\">Cass. 1re civ., 23 January 2007, No. 04-10.897<\/a>). Ten months later, a mixed chamber of the Court, composed of four of its chambers, settled the matter the other way. The facts concerned an industrial building in France, ordered by a French company from a German main contractor, which subcontracted the piping to a French company under contracts governed by German law; the main contractor then went into insolvency proceedings in Germany. The Court held that \u00ab s&#8217;agissant de la construction d&#8217;un immeuble en France, la loi du 31 d\u00e9cembre 1975 relative \u00e0 la sous-traitance, en ses dispositions protectrices du sous-traitant, est une loi de police \u00bb (where the construction of a building in France is concerned, the Act of 31 December 1975 on subcontracting, in its provisions protecting the subcontractor, is an overriding mandatory rule) (<a href=\"https:\/\/www.courdecassation.fr\/decision\/61403622cefb30e32ba2afe0\">Cass. ch. mixte, 30 November 2007, No. 06-14.006<\/a>). An overriding mandatory rule (<em>loi de police<\/em>) applies whatever law the parties wrote into their contract.<\/p>\n<p>Two months later, the Third Civil Chamber applied the same rule to facts even closer to the situation of a foreign subcontractor. A Belgian company had a production plant built in France; the main contractor was German and its contract was governed by Swiss law; the assembly work was subcontracted to a German company and then sub-subcontracted to another German company, each time under German law. The court of appeal had dismissed the German sub-subcontractor&#8217;s claim against the French company acting as delegated project owner, because none of the chosen laws gave a direct claim. The Cour de cassation quashed that decision on the basis of article 14-1 of the Act, repeating that the Act is an overriding mandatory rule where a building is constructed in France (<a href=\"https:\/\/www.courdecassation.fr\/decision\/607952ae9ba5988459c49143\">Cass. 3e civ., 30 January 2008, No. 06-14.641<\/a>). The subcontractor&#8217;s nationality, its seat and the law written into its contract did not prevent the protection.<\/p>\n<p>The protection has a limit, and it is territorial. In a case where an Italian telecommunications operator ordered equipment from a French company, which had it manufactured by an Italian company under a contract governed by Swiss law, the Commercial Chamber required a connection between the operation and France (<a href=\"https:\/\/www.courdecassation.fr\/decision\/5fd906a1200cd49e8e6e6bad\">Cass. com., 20 April 2017, No. 15-16.922<\/a>). It approved the court of appeal for stating that the Act applies only if such a connection exists, and that on that condition \u00ab le sous-traitant \u00e9tranger ayant contract\u00e9 avec une soci\u00e9t\u00e9 fran\u00e7aise b\u00e9n\u00e9ficie de la m\u00eame protection que le sous-traitant fran\u00e7ais \u00bb (the foreign subcontractor that contracted with a French company enjoys the same protection as the French subcontractor). The judgment lists, as relevant connecting factors, \u00ab le lieu d&#8217;\u00e9tablissement du sous-traitant, mais \u00e9galement le lieu d&#8217;ex\u00e9cution de la prestation ou la destination finale des produits sous trait\u00e9s \u00bb (the place where the subcontractor is established, but also the place where the service is performed or the final destination of the subcontracted products). In that case all of them pointed to Italy, since the terminals were made in Italy and installed on Italian networks, so the Italian manufacturer could not rely on the Act. Neither the main contractor&#8217;s seat in Paris nor its French bank financing was enough.<\/p>\n<p>For a subcontractor that worked on a site in France, the place of performance is in France, which is the configuration of the 2007 and 2008 judgments. The position is less settled for a company that manufactures bespoke components abroad and ships them to a French site: the 2017 judgment treats the final destination of the products as a relevant factor, but none of the decisions read for this article rules on that exact combination. A second uncertainty concerns the instrument. The 2007, 2008 and 2017 decisions applied the Rome Convention of 19 June 1980. More recent contracts fall under Regulation (EC) No 593\/2008 on the law applicable to contractual obligations, known as Rome I. In 2020, applying article 9 of that Regulation to other French commercial rules, the Commercial Chamber held that overriding mandatory provisions apply \u00ab sans qu&#8217;il soit besoin de rechercher la r\u00e8gle de conflit de lois conduisant \u00e0 la d\u00e9termination de la loi applicable \u00bb (without any need to identify the conflict-of-laws rule designating the applicable law), and it again checked for a connection with France (<a href=\"https:\/\/www.courdecassation.fr\/decision\/5fca4b2545949c4fa83897f8\">Cass. com., 8 July 2020, No. 17-31.536<\/a>). The searches made for this article did not find a Cour de cassation judgment restating the subcontracting solution under Rome I, so a project owner may still try to argue the point.<\/p>\n<p>Two further points of scope matter for foreign companies. The first is the position of a second-tier subcontractor. The Act protects the whole chain: its article 2 treats a subcontractor as main contractor towards its own subcontractors, and the Third Civil Chamber has held that \u00ab le ma\u00eetre de l&#8217;ouvrage est celui qui conclut le contrat d&#8217;entreprise ou le march\u00e9 public avec l&#8217;entrepreneur principal, y compris \u00e0 l&#8217;\u00e9gard des sous-traitants de cet entrepreneur, quel que soit leur rang \u00bb (the project owner is the party that concludes the works contract or the public contract with the main contractor, including with regard to that contractor&#8217;s subcontractors, whatever their tier) (<a href=\"https:\/\/www.courdecassation.fr\/decision\/655f01143d9dff83188895d6\">Cass. 3e civ., 23 November 2023, No. 22-17.027<\/a>). A second-tier subcontractor therefore looks to the same client as the first tier. The second point concerns work done in a factory rather than on site. The Court treated as a subcontractor a company that had manufactured made-to-measure precast floor slabs (<em>pr\u00e9dalles<\/em>) for a residential building, although it never worked on the site (<a href=\"https:\/\/www.courdecassation.fr\/decision\/5fca99a2a4556b8ec2321141\">Cass. 3e civ., 28 February 2018, No. 16-26.682<\/a>). That reasoning relied on the specific, bespoke character of the slabs; a seller of standard catalogue products should not assume that it will be treated in the same way.<\/p>\n<p>Mapping the chain is therefore the first task: who signed with whom, under which law, for which works and where they were carried out. When those answers involve several countries, a <a href=\"https:\/\/kohenavocats.com\/en\/business-lawyer-paris\/\">business lawyer in Paris handling cross-border contract disputes<\/a> will usually begin there, because each answer opens or closes one of the routes described below.<\/p>\n<h3>B. Has the project owner accepted you, and what if it has not?<\/h3>\n<p>The direct claim belongs to a subcontractor that the project owner has accepted. Article 3 of the Act requires the main contractor, when the contract is concluded and throughout its performance, to \u00ab faire accepter chaque sous-traitant et agr\u00e9er les conditions de paiement de chaque contrat de sous-traitance par le ma\u00eetre de l&#8217;ouvrage \u00bb (have each subcontractor accepted, and the payment terms of each subcontract approved, by the project owner) (<a href=\"https:\/\/www.legifrance.gouv.fr\/loda\/article_lc\/LEGIARTI000006467140\">article 3 of the 1975 Act<\/a>). The obligation lies on the main contractor, not on you. The same article provides that a main contractor that failed to obtain acceptance remains bound towards the subcontractor but cannot rely on the subcontract against it. That is cold comfort when the main contractor cannot pay.<\/p>\n<p>Acceptance does not have to follow a particular form, but it must be real. In 1999, the Cour de cassation quashed a judgment that had inferred acceptance from the project owner&#8217;s signature of the handover reports (<em>proc\u00e8s-verbaux de r\u00e9ception<\/em>), criticising the court of appeal for ruling \u00ab sans relever aucun acte manifestant sans \u00e9quivoque la volont\u00e9 du ma\u00eetre de l&#8217;ouvrage d&#8217;accepter le sous-traitant et d&#8217;agr\u00e9er les conditions de paiement \u00bb (without identifying any act unequivocally showing the project owner&#8217;s intention to accept the subcontractor and to approve the payment terms) (<a href=\"https:\/\/www.courdecassation.fr\/decision\/60794cb69ba5988459c4685e\">Cass. 3e civ., 3 March 1999, No. 97-14.715<\/a>). Tacit acceptance remains possible. In 2020, the Court upheld a judgment finding that a project owner had tacitly accepted a roofing subcontractor and approved its payment terms, \u00ab de sorte que celle-ci pouvait agir au titre de l&#8217;action directe \u00bb (so that it could bring the direct claim) (<a href=\"https:\/\/www.courdecassation.fr\/decision\/5fca5bdcf5dbe63386db8a43\">Cass. 3e civ., 13 February 2020, No. 19-10.013<\/a>). Keep every document in which the project owner dealt with you as a subcontractor: site meeting minutes naming your company, an approval of your payment terms, emails about your invoices, or the special subcontracting act on a public project.<\/p>\n<p>If you were never presented to the project owner, the Act gives you a second line of defence on construction projects. Article 14-1 requires a project owner that knows a subcontractor is on the site without having been accepted to put the main contractor or the subcontractor on notice to comply with article 3; where an accepted subcontractor has no payment delegation, the project owner must also require the main contractor to prove that it provided the bank guarantee (<a href=\"https:\/\/www.legifrance.gouv.fr\/loda\/article_lc\/LEGIARTI000006467159\">article 14-1 of the 1975 Act<\/a>). The last paragraphs of that article extend these duties to industrial subcontracting, and the Court has applied them to a steel frame made entirely in a workshop, because the project owner knew of the subcontract (<a href=\"https:\/\/www.courdecassation.fr\/decision\/607976ce9ba5988459c49f6b\">Cass. 3e civ., 7 November 2012, No. 11-18.138<\/a>). A project owner that ignores these duties may be liable in tort under the general rule of article 1240 of the Civil Code, which the Court applies together with article 14-1 (article 1240 of the Civil Code, applied by the Court in the decisions cited below).<\/p>\n<p>Knowledge is what triggers these duties, so tell the project owner who you are, in writing, as early as possible. The Court has held that \u00ab le ma\u00eetre de l&#8217;ouvrage est tenu des obligations institu\u00e9es par l&#8217;article 14-1 de la loi du 31 d\u00e9cembre 1975 d\u00e8s qu&#8217;il a connaissance du sous-traitant, nonobstant son absence sur le chantier et l&#8217;ach\u00e8vement de ses travaux \u00bb (the project owner is bound by the obligations of article 14-1 as soon as it knows of the subcontractor, even if the subcontractor is not on the site and has finished its work); in that case the subcontractor had informed the project owner by letter while the works were under way (<a href=\"https:\/\/www.courdecassation.fr\/decision\/5fca99a2a4556b8ec2321141\">Cass. 3e civ., 28 February 2018, No. 16-26.682<\/a>). Timing also works against the late subcontractor. Where a subcontractor made itself known only after the main contractor had entered receivership (<em>redressement judiciaire<\/em>), the Court upheld a finding that the project owner had committed no fault, because by then it could no longer put the main contractor itself on notice (<a href=\"https:\/\/www.courdecassation.fr\/decision\/6079657c9ba5988459c498a5\">Cass. 3e civ., 22 June 2011, No. 10-18.573<\/a>). The knowledge must also be the project owner&#8217;s own. A project owner can be ordered to pay damages on the basis of article 14-1 \u00ab que s&#8217;il a personnellement connaissance de la pr\u00e9sence du sous-traitant sur le chantier \u00bb (only if it personally knows of the subcontractor&#8217;s presence on the site); knowledge on the part of the property developer to which it had delegated the project was not enough (<a href=\"https:\/\/www.courdecassation.fr\/decision\/607a4838118b6b21e20751f6\">Cass. 3e civ., 15 April 2021, No. 19-20.424<\/a>).<\/p>\n<p>The bank guarantee deserves attention, because subcontractors based abroad often sign without one. Article 14 provides, \u00ab A peine de nullit\u00e9 du sous-trait\u00e9 \u00bb (on pain of nullity of the subcontract), that all sums due to the subcontractor must be guaranteed by a joint and several guarantee (<em>caution<\/em>) obtained by the main contractor from an approved institution, unless the main contractor delegates the project owner to pay the subcontractor (<em>d\u00e9l\u00e9gation de paiement<\/em>) up to the value of the work performed (<a href=\"https:\/\/www.legifrance.gouv.fr\/loda\/article_lc\/LEGIARTI000032043129\">article 14 of the 1975 Act<\/a>). The Court has held that \u00ab l&#8217;entrepreneur principal doit fournir la caution avant la conclusion du sous-trait\u00e9 et, si le commencement d&#8217;ex\u00e9cution des travaux lui est ant\u00e9rieur, avant celui-ci \u00bb (the main contractor must provide the guarantee before the subcontract is concluded and, if the work started earlier, before the work starts) (<a href=\"https:\/\/www.courdecassation.fr\/decision\/600fe712aec60b7d2e0100e4\">Cass. 3e civ., 21 January 2021, No. 19-22.219<\/a>). Subcontractors invoke this nullity to have their work valued at its real cost rather than at the contract price. It is, however, a relative nullity that can be lost: \u00ab La confirmation de l&#8217;acte nul, qui ne peut r\u00e9sulter de la seule ex\u00e9cution des travaux, doit \u00eatre caract\u00e9ris\u00e9e, \u00e0 d\u00e9faut d&#8217;une confirmation expresse, par leur ex\u00e9cution volontaire en connaissance de la cause du vice l&#8217;affectant \u00bb (confirmation of the void contract, which cannot result from the mere performance of the works, must be shown, failing express confirmation, by their voluntary performance with knowledge of the defect affecting the contract) (<a href=\"https:\/\/www.courdecassation.fr\/decision\/655f010e3d9dff83188895d2\">Cass. 3e civ., 23 November 2023, No. 22-21.463<\/a>). Nor does nullity automatically create a claim against the project owner. A Portuguese subcontractor, after insolvency proceedings in Portugal, sought the fair price of its work by alleging that the guarantee came too late; its claim against the project owner failed because the project owner had received a copy of the subcontract and of the bank guarantee when it accepted the subcontractor (<a href=\"https:\/\/www.courdecassation.fr\/decision\/64a65d1fbbd03a05db964e3b\">Cass. 3e civ., 6 July 2023, No. 21-15.239<\/a>).<\/p>\n<h2>II. How do you get paid by the French project owner?<\/h2>\n<h3>A. On a private project: the direct claim step by step<\/h3>\n<p>Step one is a formal notice to the main contractor demanding payment of the sums due under the subcontract, with a copy to the project owner. Article 12 reads: \u00ab Le sous-traitant a une action directe contre le ma\u00eetre de l&#8217;ouvrage si l&#8217;entrepreneur principal ne paie pas, un mois apr\u00e8s en avoir \u00e9t\u00e9 mis en demeure, les sommes qui sont dues en vertu du contrat de sous-traitance ; copie de cette mise en demeure est adress\u00e9e au ma\u00eetre de l&#8217;ouvrage \u00bb (the subcontractor has a direct claim against the project owner if the main contractor does not pay, one month after being given formal notice, the sums due under the subcontract; a copy of that formal notice is sent to the project owner) (<a href=\"https:\/\/www.legifrance.gouv.fr\/loda\/article_lc\/LEGIARTI000006467152\">article 12 of the 1975 Act<\/a>). The text sets out three elements: a formal notice to the main contractor, a copy to the project owner, and one month without payment (<a href=\"https:\/\/www.legifrance.gouv.fr\/loda\/article_lc\/LEGIARTI000006467152\">article 12 of the 1975 Act<\/a>).<\/p>\n<p>The copy is not a formality. Article 13 limits the project owner&#8217;s obligations to \u00ab ce qu&#8217;il doit encore \u00e0 l&#8217;entrepreneur principal \u00e0 la date de la r\u00e9ception de la copie de la mise en demeure pr\u00e9vue \u00e0 l&#8217;article pr\u00e9c\u00e9dent \u00bb (what it still owes the main contractor on the date it receives the copy of the formal notice provided for in the previous article) (<a href=\"https:\/\/www.legifrance.gouv.fr\/loda\/article_lc\/LEGIARTI000006467153\">article 13 of the 1975 Act<\/a>). In the 2007 case, the subcontractor had notified the project owner of its formal notices by registered letter with acknowledgment of receipt in March and May 2001, and the project owner paid what it still owed to the main contractor only in May 2002. The court of appeal had excused that payment on the ground that no lawsuit had been brought against the project owner before July 2003. The Cour de cassation quashed that decision for breach of articles 12 and 13 (<a href=\"https:\/\/www.courdecassation.fr\/decision\/61403622cefb30e32ba2afe0\">Cass. ch. mixte, 30 November 2007, No. 06-14.006<\/a>). The notified copies, not the later lawsuit, were what counted. Use a delivery method that proves the date of receipt, because article 13 makes that date decisive.<\/p>\n<p>The ceiling works as follows in practice. In the 2020 judgment, the balance the project owner still owed the main contractor on the date it received the copy of the notice was \u20ac61,958.08; the project owner had since paid the subcontractor \u20ac35,000; it was ordered to pay the remaining \u20ac26,958.08 and nothing more (<a href=\"https:\/\/www.courdecassation.fr\/decision\/5fca5bdcf5dbe63386db8a43\">Cass. 3e civ., 13 February 2020, No. 19-10.013<\/a>). Article 13 adds a second limit: the direct claim can only cover \u00ab le paiement correspondant aux prestations pr\u00e9vues par le contrat de sous-traitance et dont le ma\u00eetre de l&#8217;ouvrage est effectivement b\u00e9n\u00e9ficiaire \u00bb (payment for the services provided for in the subcontract from which the project owner actually benefits) (<a href=\"https:\/\/www.legifrance.gouv.fr\/loda\/article_lc\/LEGIARTI000006467153\">article 13 of the 1975 Act<\/a>). Before sending the notice, sort your unpaid invoices accordingly: which items were ordered under the subcontract, which benefited the project owner, and which were extras agreed informally with the main contractor&#8217;s site staff.<\/p>\n<p>Step two changes if the main contractor is already in liquidation. Article 12 states that the direct claim survives the main contractor&#8217;s insolvency (<a href=\"https:\/\/www.legifrance.gouv.fr\/loda\/article_lc\/LEGIARTI000006467152\">article 12 of the 1975 Act<\/a>), but the way to trigger it is different. In its judgment of 13 July 2023, the Third Civil Chamber recalled, citing Commercial Chamber decisions of 1992 and 1995, that where the main contractor has been placed in judicial liquidation \u00ab le sous-traitant est tenu pour exercer l&#8217;action directe, pr\u00e9vue \u00e0 l&#8217;article susvis\u00e9, contre le ma\u00eetre de l&#8217;ouvrage, d&#8217;adresser \u00e0 celui-ci une copie de sa production au passif de l&#8217;entrepreneur principal, cette production tenant lieu de mise en demeure \u00bb (to bring the direct claim against the project owner, the subcontractor must send it a copy of its proof of claim in the main contractor&#8217;s insolvency, that proof of claim taking the place of the formal notice) (<a href=\"https:\/\/www.courdecassation.fr\/decision\/64af96df049d5c05db172f2a\">Cass. 3e civ., 13 July 2023, No. 21-23.747<\/a>). In that case, the subcontractor had sent a registered formal notice to the main contractor about four months after the liquidation order. The Court held that, \u00ab faute de mise en demeure pr\u00e9alable \u00e0 la liquidation judiciaire, seule la d\u00e9claration de cr\u00e9ance vaut mise en demeure de l&#8217;entrepreneur principal \u00bb (failing a formal notice given before the liquidation, only the proof of claim counts as formal notice to the main contractor). It found the letter ineffective because the liquidated company no longer managed its assets, and it declared the direct claim inadmissible (<a href=\"https:\/\/www.courdecassation.fr\/decision\/64af96df049d5c05db172f2a\">Cass. 3e civ., 13 July 2023, No. 21-23.747<\/a>).<\/p>\n<p>For a creditor based abroad, the proof of claim has its own time limit. In a liquidation, claims are filed with the liquidator (<em>liquidateur<\/em>) (article L641-3 of the Commercial Code), and article R641-25 makes the filing rules of the safeguard procedure applicable to liquidation (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006269678\">article R641-25 of the Commercial Code<\/a>). Under article R622-24, the filing period is two months from publication of the opening judgment in the official gazette of civil and commercial announcements (<em>Bulletin officiel des annonces civiles et commerciales<\/em>, BODACC), and where the proceedings were opened by a court in metropolitan France \u00ab le d\u00e9lai de d\u00e9claration est augment\u00e9 de deux mois pour les cr\u00e9anciers qui ne demeurent pas sur ce territoire \u00bb (the filing period is extended by two months for creditors who do not reside in that territory) (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000029175247\">article R622-24 of the Commercial Code<\/a>). Our guide on <a href=\"https:\/\/kohenavocats.com\/en\/french-customer-liquidation-file-proof-of-debt-from-abroad\/\">filing a proof of debt in a French liquidation from abroad<\/a> explains how to prepare that document. For the direct claim, the lesson of the 2023 judgment is practical: file the proof of claim, then send a copy to the project owner without delay, by a method that proves the date of receipt.<\/p>\n<p>Step three is the claim against the project owner if it still does not pay. A French project owner can be sued before the court of the place where it is established: article 42 of the Code of Civil Procedure provides that \u00ab La juridiction territorialement comp\u00e9tente est, sauf disposition contraire, celle du lieu o\u00f9 demeure le d\u00e9fendeur \u00bb (the court with territorial jurisdiction is, unless otherwise provided, that of the place where the defendant resides) (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000006410140\">article 42 of the Code of Civil Procedure<\/a>). Remember that the jurisdiction or arbitration clause in your subcontract was agreed with the main contractor; before relying on it, or before the project owner relies on it, check who actually signed it.<\/p>\n<p>When the direct claim has been lost because the project owner did nothing, a damages claim may take its place, and the Court&#8217;s judgment of 7 March 2024 explains how the loss is measured. Where the project owner knew of a subcontractor but did not require the main contractor to present it, the Court held that \u00ab Le manquement du ma\u00eetre de l&#8217;ouvrage qui, ayant eu connaissance de l&#8217;existence d&#8217;un sous-traitant sur un chantier, s&#8217;est abstenu de mettre en demeure l&#8217;entrepreneur principal de s&#8217;acquitter des obligations qui lui incombent en lui pr\u00e9sentant le sous-traitant, fait perdre \u00e0 celui-ci le b\u00e9n\u00e9fice de l&#8217;action directe \u00bb (the failure of a project owner which, knowing of a subcontractor on a site, did not put the main contractor on notice to fulfil its obligations by presenting the subcontractor, deprives the subcontractor of the direct claim). The loss is then assessed by reference to what the project owner still owed the main contractor when it learnt of the subcontractor&#8217;s presence, or to the sums it paid the main contractor after that date (<a href=\"https:\/\/www.courdecassation.fr\/decision\/65e966d4b0f6b800086b5011\">Cass. 3e civ., 7 March 2024, No. 22-23.309<\/a>). Where the subcontractor had been accepted but had neither a guarantee nor a payment delegation, \u00ab le pr\u00e9judice r\u00e9parable est alors \u00e9gal \u00e0 la diff\u00e9rence entre les sommes que le sous-traitant aurait d\u00fb recevoir si une d\u00e9l\u00e9gation de paiement lui avait \u00e9t\u00e9 consentie ou si un \u00e9tablissement financier avait cautionn\u00e9 son march\u00e9 et celles effectivement re\u00e7ues \u00bb (the recoverable loss is then equal to the difference between the sums the subcontractor should have received had it been given a payment delegation or had a financial institution guaranteed its contract, and the sums actually received). In that case, it did not matter that the project owner had not approved some of the work, since the work had been entrusted to the subcontractor for the performance of the main contract.<\/p>\n<h3>B. On a public project: direct payment and its fifteen-day mechanism<\/h3>\n<p>If the project owner is a public buyer, the rules are different. Article 11 of the 1975 Act excludes the direct-claim title for public contracts governed by the second part of the Public Procurement Code (<em>code de la commande publique<\/em>), with exceptions that include contracts below the direct-payment threshold (<a href=\"https:\/\/www.legifrance.gouv.fr\/loda\/article_lc\/LEGIARTI000037739348\">article 11 of the 1975 Act<\/a>). Instead, article L2193-11 of that Code provides that the direct subcontractor of the contract holder \u00ab qui a \u00e9t\u00e9 accept\u00e9 et dont les conditions de paiement ont \u00e9t\u00e9 agr\u00e9\u00e9es par l&#8217;acheteur est pay\u00e9 directement par lui pour la part du march\u00e9 dont il assure l&#8217;ex\u00e9cution \u00bb (which has been accepted and whose payment terms have been approved by the buyer is paid directly by the buyer for the part of the contract it performs), and that \u00ab Toute renonciation au paiement direct est r\u00e9put\u00e9e non \u00e9crite \u00bb (any waiver of direct payment is deemed unwritten) (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000037703827\">article L2193-11 of the Public Procurement Code<\/a>). Under article L2193-10, direct payment applies when the subcontract reaches a threshold set by regulation, and below that threshold the subcontractor is paid under the direct-claim title of the 1975 Act (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000037703823\">article L2193-10 of the Public Procurement Code<\/a>). Article R2193-10 sets that threshold at 600 euros including tax, with a different rule for certain defence contracts (article R2193-10 of the Public Procurement Code). Direct payment also survives the contract holder&#8217;s insolvency: \u00ab Le paiement direct est obligatoire m\u00eame si le titulaire du march\u00e9 est en \u00e9tat de liquidation judiciaire, de redressement judiciaire ou de proc\u00e9dure de sauvegarde \u00bb (direct payment is compulsory even if the contract holder is in judicial liquidation, receivership or safeguard proceedings) (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000037703829\">article L2193-12 of the Public Procurement Code<\/a>).<\/p>\n<p>Acceptance follows its own procedure on public contracts. It is recorded by the signature of a special subcontracting act (<em>acte sp\u00e9cial de sous-traitance<\/em>), and article R2193-4 adds that \u00ab Le silence de l&#8217;acheteur gard\u00e9 pendant vingt-et-un jours \u00e0 compter de la r\u00e9ception des documents mentionn\u00e9s \u00e0 l&#8217;article R. 2193-3 vaut \u00e9galement acceptation du sous-traitant et agr\u00e9ment des conditions de paiement \u00bb (the buyer&#8217;s silence for twenty-one days from receipt of the documents mentioned in article R. 2193-3 also amounts to acceptance of the subcontractor and approval of the payment terms) (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000037729621\">article R2193-4 of the Public Procurement Code<\/a>). Ask the contract holder for a copy of the signed act, or for proof of the date on which the buyer received the documents.<\/p>\n<p>The payment request then follows a sequence in which the main contractor keeps a role. The subcontractor sends its payment request to the contract holder by any means that proves receipt and its date (article R2193-11 of the Public Procurement Code). The contract holder then has fifteen days from that receipt to agree or to notify a refusal, both to the subcontractor and to the buyer (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000037729599\">article R2193-12 of the Public Procurement Code<\/a>). Once that period has expired, the contract holder is deemed to have accepted the documents, or parts of documents, that it has neither expressly accepted nor refused (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000037729597\">article R2193-13 of the Public Procurement Code<\/a>). With proof that the contract holder received the request, or a postal notice showing that the letter was refused or not collected, the subcontractor sends its request to the buyer (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000037729595\">article R2193-14 of the Public Procurement Code<\/a>). Public undertakings that are not buyers under the Code follow Title II of the 1975 Act, whose article 8 gives the main contractor the same fifteen days to accept or refuse the supporting documents (<a href=\"https:\/\/www.legifrance.gouv.fr\/loda\/article_lc\/LEGIARTI000006467147\">article 8 of the 1975 Act<\/a>).<\/p>\n<p>The Conseil d&#8217;\u00c9tat, France&#8217;s highest administrative court, treats this sequence as decisive. In a judgment of 17 October 2023, applying article 8 of the 1975 Act and the equivalent provision of the former public procurement code, it held that the procedure allows the contract holder to check the subcontractor&#8217;s documents, that a subcontractor that does not follow it cannot claim direct payment from the project owner, and that \u00ab Le refus motiv\u00e9 du titulaire du march\u00e9 d&#8217;accepter la demande de paiement direct du sous-traitant, notifi\u00e9 dans le d\u00e9lai de quinze jours \u00e0 compter de sa r\u00e9ception, fait \u00e9galement obstacle \u00e0 ce que le sous-traitant puisse se pr\u00e9valoir, aupr\u00e8s du ma\u00eetre d&#8217;ouvrage, d&#8217;un droit \u00e0 ce paiement \u00bb (a reasoned refusal by the contract holder to accept the subcontractor&#8217;s request for direct payment, notified within fifteen days of receipt, also prevents the subcontractor from claiming that payment from the project owner) (<a href=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000048222718\">CE, 17 October 2023, No. 469071<\/a>). Timing matters as well. In a judgment of 2 December 2019, also given under the former code, the Conseil d&#8217;\u00c9tat held that \u00ab Une demande adress\u00e9e apr\u00e8s la notification du d\u00e9compte g\u00e9n\u00e9ral du march\u00e9 au titulaire de celui-ci ne peut \u00eatre regard\u00e9e comme ayant \u00e9t\u00e9 adress\u00e9e en temps utile \u00bb (a request sent after the general final account of the contract has been notified to the contract holder cannot be regarded as having been sent in good time) (<a href=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000039442425\">CE, 2 December 2019, No. 425204<\/a>). The general final account (<em>d\u00e9compte g\u00e9n\u00e9ral<\/em>) is the document that sets the final balance between the buyer and the contract holder. On a public project, therefore, send each payment request as the work progresses rather than waiting for the end of the contract.<\/p>\n<p>Whatever the type of project, the texts and decisions above lead to a short checklist for a foreign subcontractor that has not been paid:<\/p>\n<ul>\n<li>Identify the project owner, meaning the party that signed with the main contractor, together with the place of the works and the law named in each contract of the chain (<a href=\"https:\/\/www.courdecassation.fr\/decision\/655f01143d9dff83188895d6\">Cass. 3e civ., 23 November 2023, No. 22-17.027<\/a>; <a href=\"https:\/\/www.courdecassation.fr\/decision\/5fd906a1200cd49e8e6e6bad\">Cass. com., 20 April 2017, No. 15-16.922<\/a>).<\/li>\n<li>Gather the documents showing that the project owner knew of you and accepted you, and write to it at once if it may not know who you are (<a href=\"https:\/\/www.courdecassation.fr\/decision\/60794cb69ba5988459c4685e\">Cass. 3e civ., 3 March 1999, No. 97-14.715<\/a>; <a href=\"https:\/\/www.courdecassation.fr\/decision\/5fca99a2a4556b8ec2321141\">Cass. 3e civ., 28 February 2018, No. 16-26.682<\/a>).<\/li>\n<li>Check whether you received a bank guarantee or a payment delegation, and on what date compared with the signature of the subcontract and the start of your work (<a href=\"https:\/\/www.courdecassation.fr\/decision\/600fe712aec60b7d2e0100e4\">Cass. 3e civ., 21 January 2021, No. 19-22.219<\/a>).<\/li>\n<li>If the main contractor is not in liquidation, send the formal notice to the main contractor and a copy to the project owner, with proof of the date of receipt; the direct claim arises if the contractor has not paid one month after the notice (<a href=\"https:\/\/www.legifrance.gouv.fr\/loda\/article_lc\/LEGIARTI000006467152\">article 12 of the 1975 Act<\/a>; <a href=\"https:\/\/www.legifrance.gouv.fr\/loda\/article_lc\/LEGIARTI000006467153\">article 13 of the 1975 Act<\/a>).<\/li>\n<li>If the main contractor is in liquidation, file the proof of claim within the period of article R622-24, extended by two months for creditors residing outside metropolitan France, and send a copy to the project owner (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000029175247\">article R622-24 of the Commercial Code<\/a>; <a href=\"https:\/\/www.courdecassation.fr\/decision\/64af96df049d5c05db172f2a\">Cass. 3e civ., 13 July 2023, No. 21-23.747<\/a>).<\/li>\n<li>On a public project, obtain the special subcontracting act, send each payment request to the contract holder, then to the buyer after the fifteen-day period, and never wait until the general final account has been notified (<a href=\"https:\/\/www.legifrance.gouv.fr\/codes\/article_lc\/LEGIARTI000037729599\">article R2193-12 of the Public Procurement Code<\/a>; <a href=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000039442425\">CE, 2 December 2019, No. 425204<\/a>).<\/li>\n<\/ul>\n<h2>Conclusion<\/h2>\n<p>A subcontractor based abroad that worked on a French project is not limited to chasing a main contractor that will not or cannot pay. Where a building is constructed in France, the Cour de cassation treats the protective provisions of the 1975 Act as overriding mandatory rules, whatever law the subcontract chose (<a href=\"https:\/\/www.courdecassation.fr\/decision\/61403622cefb30e32ba2afe0\">Cass. ch. mixte, 30 November 2007, No. 06-14.006<\/a>; <a href=\"https:\/\/www.courdecassation.fr\/decision\/607952ae9ba5988459c49143\">Cass. 3e civ., 30 January 2008, No. 06-14.641<\/a>), provided the operation is connected with France (<a href=\"https:\/\/www.courdecassation.fr\/decision\/5fd906a1200cd49e8e6e6bad\">Cass. com., 20 April 2017, No. 15-16.922<\/a>). The direct claim against the project owner depends on acceptance, on a formal notice copied to the project owner and on one month without payment, and it is capped at what the project owner still owes the main contractor when it receives that copy (<a href=\"https:\/\/www.legifrance.gouv.fr\/loda\/article_lc\/LEGIARTI000006467152\">article 12 of the 1975 Act<\/a>; <a href=\"https:\/\/www.legifrance.gouv.fr\/loda\/article_lc\/LEGIARTI000006467153\">article 13 of the 1975 Act<\/a>). If the main contractor is already in liquidation, the copy to send is that of the proof of claim (<a href=\"https:\/\/www.courdecassation.fr\/decision\/64af96df049d5c05db172f2a\">Cass. 3e civ., 13 July 2023, No. 21-23.747<\/a>). On a public project, direct payment replaces the direct claim and runs through the contract holder within fifteen days, before the general final account (<a href=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000048222718\">CE, 17 October 2023, No. 469071<\/a>; <a href=\"https:\/\/www.legifrance.gouv.fr\/ceta\/id\/CETATEXT000039442425\">CE, 2 December 2019, No. 425204<\/a>). Where the project owner knew of you and did nothing, a damages claim measured by the 2024 judgment may remain (<a href=\"https:\/\/www.courdecassation.fr\/decision\/65e966d4b0f6b800086b5011\">Cass. 3e civ., 7 March 2024, No. 22-23.309<\/a>). In every scenario, the dates of the notices and of their receipt decide how much can still be recovered, so they should be fixed in writing before anything else.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>When a main contractor stops paying on a French project, a subcontractor based abroad may claim directly from the project owner under the 1975 Act. How a foreign-law clause, acceptance, liquidation and public contracts change that route.<\/p>\n","protected":false},"author":232070755,"featured_media":9569,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_kj_source_type":"","_kj_official_id":"","_kj_official_url":"","_kj_judilibre_id":"","_kj_jur":"","_kj_lieu":"","_kj_chambre":"","_kj_rg":"","_kj_date":"","footnotes":""},"categories":[301720,549983],"tags":[],"class_list":["post-2555057","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-decryptage","category-en-entreprises-etrangeres"],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.9 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Unpaid by the main contractor on a French project: can a foreign subcontractor claim directly from the project owner?<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/kohenavocats.com\/en\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\/\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Unpaid by the main contractor on a French project: can a foreign subcontractor claim directly from the project owner?\" \/>\n<meta property=\"og:description\" content=\"When a main contractor stops paying on a French project, a subcontractor based abroad may claim directly from the project owner under the 1975 Act. How a foreign-law clause, acceptance, liquidation and public contracts change that route.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/kohenavocats.com\/en\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\/\" \/>\n<meta property=\"og:site_name\" content=\"Hassan KOHEN\" \/>\n<meta property=\"article:published_time\" content=\"2026-11-28T17:08:14+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/kohenavocats.com\/wp-content\/uploads\/2026\/11\/kohen-avocats-partage.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"630\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ma\u00eetre Hassan Kohen\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ma\u00eetre Hassan Kohen\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"27 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\\\/\"},\"author\":{\"name\":\"Ma\u00eetre Hassan Kohen\",\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/avocat-hassan-kohen\\\/#person\"},\"headline\":\"Unpaid by the main contractor on a French project: can a foreign subcontractor claim directly from the project owner?\",\"datePublished\":\"2026-11-28T17:08:14+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\\\/\"},\"wordCount\":5569,\"publisher\":{\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/kohenavocats.com\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/ave-calvar-34SzSSXv2Qk-unsplash.webp\",\"articleSection\":[\"D\u00e9cryptage\",\"Foreign companies in France\"],\"inLanguage\":\"en-US\",\"citation\":\"Unpaid by the main contractor on a French project: can a foreign subcontractor claim directly from the project owner?\",\"about\":[{\"@type\":\"Thing\",\"name\":\"D\u00e9cryptage\"},{\"@type\":\"Thing\",\"name\":\"Foreign companies in France\"}],\"dateModified\":\"2026-11-28T17:08:14+00:00\",\"speakable\":{\"@type\":\"SpeakableSpecification\",\"cssSelector\":[\".article-content > p:first-of-type\"]}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\\\/\",\"url\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\\\/\",\"name\":\"Unpaid by the main contractor on a French project: can a foreign subcontractor claim directly from the project owner?\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/kohenavocats.com\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/ave-calvar-34SzSSXv2Qk-unsplash.webp\",\"datePublished\":\"2026-11-28T17:08:14+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\\\/#breadcrumb\"},\"inLanguage\":\"en-US\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/kohenavocats.com\\\/en\\\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\\\/#primaryimage\",\"url\":\"https:\\\/\\\/kohenavocats.com\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/ave-calvar-34SzSSXv2Qk-unsplash.webp\",\"contentUrl\":\"https:\\\/\\\/kohenavocats.com\\\/wp-content\\\/uploads\\\/2024\\\/11\\\/ave-calvar-34SzSSXv2Qk-unsplash.webp\",\"width\":4447,\"height\":6477},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Accueil\",\"item\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Unpaid by the main contractor on a French project: can a foreign subcontractor claim directly from the project owner?\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/#website\",\"url\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/\",\"name\":\"Hassan KOHEN\",\"description\":\"Ma\u00eetre Hassan Kohen, avocat p\u00e9naliste \u00e0 Paris, intervient exclusivement en droit p\u00e9nal pour la d\u00e9fense des particuliers, notamment en mati\u00e8re d\u2019accusations de viol. Il assure un accompagnement rigoureux d\u00e8s la garde \u00e0 vue jusqu\u2019\u00e0 la Cour d\u2019assises, veillant au strict respect des garanties proc\u00e9durales.\",\"publisher\":{\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"en-US\"},{\"@type\":[\"Organization\",\"LegalService\"],\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/#organization\",\"name\":\"Ma\u00eetre Hassan Kohen, avocat au barreau de Paris\",\"url\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-US\",\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/kohenavocats.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/Logo-2-1.webp\",\"contentUrl\":\"https:\\\/\\\/kohenavocats.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/Logo-2-1.webp\",\"width\":2114,\"height\":1253,\"caption\":\"Ma\u00eetre Hassan Kohen, avocat au barreau de Paris\"},\"image\":{\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/maps.google.com\\\/maps?cid=18432992519337641707\",\"https:\\\/\\\/www.youtube.com\\\/@Kohen-Avocats\"],\"legalName\":\"KOHEN & BROTHERS\",\"description\":\"Cabinet de Ma\u00eetre Hassan Kohen, avocat au barreau de Paris, en droit p\u00e9nal, droit du travail et droit de la famille.\",\"email\":\"contact@kohenavocats.com\",\"telephone\":\"+33 6 89 11 34 45\",\"foundingDate\":\"2026-05-21\",\"vatID\":\"FR84105365498\",\"taxID\":\"105365498\",\"iso6523Code\":\"0002:105365498\",\"address\":{\"@type\":\"PostalAddress\",\"streetAddress\":\"10 avenue du Colonel Bonnet\",\"postalCode\":\"75016\",\"addressLocality\":\"Paris\",\"addressCountry\":\"FR\"},\"areaServed\":\"France\"},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/avocat-hassan-kohen\\\/#person\",\"name\":\"Ma\u00eetre Hassan Kohen\",\"givenName\":\"Hassan\",\"familyName\":\"Kohen\",\"honorificPrefix\":\"Ma\u00eetre\",\"jobTitle\":\"Avocat au barreau de Paris\",\"description\":\"Ma\u00eetre Hassan Kohen est avocat au barreau de Paris. Il intervient en droit p\u00e9nal, en droit du travail et en droit de la famille.\",\"url\":\"https:\\\/\\\/kohenavocats.com\\\/avocat-hassan-kohen\\\/\",\"worksFor\":{\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/en\\\/#organization\"},\"memberOf\":{\"@type\":\"Organization\",\"name\":\"Barreau de Paris\"},\"knowsAbout\":[\"Droit p\u00e9nal\",\"Droit du travail\",\"Droit de la famille\"],\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/in\\\/hassan-kohen-avocat-paris\\\/\",\"https:\\\/\\\/www.instagram.com\\\/maitre_hassan_kohen\\\/\",\"https:\\\/\\\/www.youtube.com\\\/@Kohen-Avocats\"],\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/avocat-hassan-kohen\\\/#person-portrait\",\"url\":\"https:\\\/\\\/kohenavocats.com\\\/wp-content\\\/uploads\\\/kohen-footer\\\/portrait-20260919-lignes-bleues.jpg\",\"contentUrl\":\"https:\\\/\\\/kohenavocats.com\\\/wp-content\\\/uploads\\\/kohen-footer\\\/portrait-20260919-lignes-bleues.jpg\",\"width\":1122,\"height\":1402,\"caption\":\"Hassan Kohen, avocat au barreau de Paris \u2014 portrait du cabinet Kohen Avocats\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Unpaid by the main contractor on a French project: can a foreign subcontractor claim directly from the project owner?","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/kohenavocats.com\/en\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\/","og_locale":"en_US","og_type":"article","og_title":"Unpaid by the main contractor on a French project: can a foreign subcontractor claim directly from the project owner?","og_description":"When a main contractor stops paying on a French project, a subcontractor based abroad may claim directly from the project owner under the 1975 Act. How a foreign-law clause, acceptance, liquidation and public contracts change that route.","og_url":"https:\/\/kohenavocats.com\/en\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\/","og_site_name":"Hassan KOHEN","article_published_time":"2026-11-28T17:08:14+00:00","og_image":[{"width":1200,"height":630,"url":"https:\/\/kohenavocats.com\/wp-content\/uploads\/2026\/11\/kohen-avocats-partage.jpg","type":"image\/jpeg"}],"author":"Ma\u00eetre Hassan Kohen","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Ma\u00eetre Hassan Kohen","Est. reading time":"27 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/kohenavocats.com\/en\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\/#article","isPartOf":{"@id":"https:\/\/kohenavocats.com\/en\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\/"},"author":{"name":"Ma\u00eetre Hassan Kohen","@id":"https:\/\/kohenavocats.com\/avocat-hassan-kohen\/#person"},"headline":"Unpaid by the main contractor on a French project: can a foreign subcontractor claim directly from the project owner?","datePublished":"2026-11-28T17:08:14+00:00","mainEntityOfPage":{"@id":"https:\/\/kohenavocats.com\/en\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\/"},"wordCount":5569,"publisher":{"@id":"https:\/\/kohenavocats.com\/en\/#organization"},"image":{"@id":"https:\/\/kohenavocats.com\/en\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\/#primaryimage"},"thumbnailUrl":"https:\/\/kohenavocats.com\/wp-content\/uploads\/2024\/11\/ave-calvar-34SzSSXv2Qk-unsplash.webp","articleSection":["D\u00e9cryptage","Foreign companies in France"],"inLanguage":"en-US","citation":"Unpaid by the main contractor on a French project: can a foreign subcontractor claim directly from the project owner?","about":[{"@type":"Thing","name":"D\u00e9cryptage"},{"@type":"Thing","name":"Foreign companies in France"}],"dateModified":"2026-11-28T17:08:14+00:00","speakable":{"@type":"SpeakableSpecification","cssSelector":[".article-content > p:first-of-type"]}},{"@type":"WebPage","@id":"https:\/\/kohenavocats.com\/en\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\/","url":"https:\/\/kohenavocats.com\/en\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\/","name":"Unpaid by the main contractor on a French project: can a foreign subcontractor claim directly from the project owner?","isPartOf":{"@id":"https:\/\/kohenavocats.com\/en\/#website"},"primaryImageOfPage":{"@id":"https:\/\/kohenavocats.com\/en\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\/#primaryimage"},"image":{"@id":"https:\/\/kohenavocats.com\/en\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\/#primaryimage"},"thumbnailUrl":"https:\/\/kohenavocats.com\/wp-content\/uploads\/2024\/11\/ave-calvar-34SzSSXv2Qk-unsplash.webp","datePublished":"2026-11-28T17:08:14+00:00","breadcrumb":{"@id":"https:\/\/kohenavocats.com\/en\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\/#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/kohenavocats.com\/en\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\/"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/kohenavocats.com\/en\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\/#primaryimage","url":"https:\/\/kohenavocats.com\/wp-content\/uploads\/2024\/11\/ave-calvar-34SzSSXv2Qk-unsplash.webp","contentUrl":"https:\/\/kohenavocats.com\/wp-content\/uploads\/2024\/11\/ave-calvar-34SzSSXv2Qk-unsplash.webp","width":4447,"height":6477},{"@type":"BreadcrumbList","@id":"https:\/\/kohenavocats.com\/en\/foreign-subcontractor-unpaid-france-claim-project-owner-directly\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Accueil","item":"https:\/\/kohenavocats.com\/en\/"},{"@type":"ListItem","position":2,"name":"Unpaid by the main contractor on a French project: can a foreign subcontractor claim directly from the project owner?"}]},{"@type":"WebSite","@id":"https:\/\/kohenavocats.com\/en\/#website","url":"https:\/\/kohenavocats.com\/en\/","name":"Hassan KOHEN","description":"Ma\u00eetre Hassan Kohen, avocat p\u00e9naliste \u00e0 Paris, intervient exclusivement en droit p\u00e9nal pour la d\u00e9fense des particuliers, notamment en mati\u00e8re d\u2019accusations de viol. Il assure un accompagnement rigoureux d\u00e8s la garde \u00e0 vue jusqu\u2019\u00e0 la Cour d\u2019assises, veillant au strict respect des garanties proc\u00e9durales.","publisher":{"@id":"https:\/\/kohenavocats.com\/en\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/kohenavocats.com\/en\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":["Organization","LegalService"],"@id":"https:\/\/kohenavocats.com\/en\/#organization","name":"Ma\u00eetre Hassan Kohen, avocat au barreau de Paris","url":"https:\/\/kohenavocats.com\/en\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/kohenavocats.com\/en\/#\/schema\/logo\/image\/","url":"https:\/\/kohenavocats.com\/wp-content\/uploads\/2026\/01\/Logo-2-1.webp","contentUrl":"https:\/\/kohenavocats.com\/wp-content\/uploads\/2026\/01\/Logo-2-1.webp","width":2114,"height":1253,"caption":"Ma\u00eetre Hassan Kohen, avocat au barreau de Paris"},"image":{"@id":"https:\/\/kohenavocats.com\/en\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/maps.google.com\/maps?cid=18432992519337641707","https:\/\/www.youtube.com\/@Kohen-Avocats"],"legalName":"KOHEN & BROTHERS","description":"Cabinet de Ma\u00eetre Hassan Kohen, avocat au barreau de Paris, en droit p\u00e9nal, droit du travail et droit de la famille.","email":"contact@kohenavocats.com","telephone":"+33 6 89 11 34 45","foundingDate":"2026-05-21","vatID":"FR84105365498","taxID":"105365498","iso6523Code":"0002:105365498","address":{"@type":"PostalAddress","streetAddress":"10 avenue du Colonel Bonnet","postalCode":"75016","addressLocality":"Paris","addressCountry":"FR"},"areaServed":"France"},{"@type":"Person","@id":"https:\/\/kohenavocats.com\/avocat-hassan-kohen\/#person","name":"Ma\u00eetre Hassan Kohen","givenName":"Hassan","familyName":"Kohen","honorificPrefix":"Ma\u00eetre","jobTitle":"Avocat au barreau de Paris","description":"Ma\u00eetre Hassan Kohen est avocat au barreau de Paris. Il intervient en droit p\u00e9nal, en droit du travail et en droit de la famille.","url":"https:\/\/kohenavocats.com\/avocat-hassan-kohen\/","worksFor":{"@id":"https:\/\/kohenavocats.com\/en\/#organization"},"memberOf":{"@type":"Organization","name":"Barreau de Paris"},"knowsAbout":["Droit p\u00e9nal","Droit du travail","Droit de la famille"],"sameAs":["https:\/\/www.linkedin.com\/in\/hassan-kohen-avocat-paris\/","https:\/\/www.instagram.com\/maitre_hassan_kohen\/","https:\/\/www.youtube.com\/@Kohen-Avocats"],"image":{"@type":"ImageObject","@id":"https:\/\/kohenavocats.com\/avocat-hassan-kohen\/#person-portrait","url":"https:\/\/kohenavocats.com\/wp-content\/uploads\/kohen-footer\/portrait-20260919-lignes-bleues.jpg","contentUrl":"https:\/\/kohenavocats.com\/wp-content\/uploads\/kohen-footer\/portrait-20260919-lignes-bleues.jpg","width":1122,"height":1402,"caption":"Hassan Kohen, avocat au barreau de Paris \u2014 portrait du cabinet Kohen Avocats"}}]}},"_links":{"self":[{"href":"https:\/\/kohenavocats.com\/en\/wp-json\/wp\/v2\/posts\/2555057","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kohenavocats.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/kohenavocats.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/kohenavocats.com\/en\/wp-json\/wp\/v2\/users\/232070755"}],"replies":[{"embeddable":true,"href":"https:\/\/kohenavocats.com\/en\/wp-json\/wp\/v2\/comments?post=2555057"}],"version-history":[{"count":0,"href":"https:\/\/kohenavocats.com\/en\/wp-json\/wp\/v2\/posts\/2555057\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/kohenavocats.com\/en\/wp-json\/wp\/v2\/media\/9569"}],"wp:attachment":[{"href":"https:\/\/kohenavocats.com\/en\/wp-json\/wp\/v2\/media?parent=2555057"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/kohenavocats.com\/en\/wp-json\/wp\/v2\/categories?post=2555057"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/kohenavocats.com\/en\/wp-json\/wp\/v2\/tags?post=2555057"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}