{"id":747165,"date":"2026-04-29T07:39:26","date_gmt":"2026-04-29T05:39:26","guid":{"rendered":"https:\/\/kohenavocats.com\/jurisprudences\/boygues-uk-ltd-v-sharpfibre-ltd\/"},"modified":"2026-04-29T07:39:26","modified_gmt":"2026-04-29T05:39:26","slug":"boygues-uk-ltd-v-sharpfibre-ltd","status":"publish","type":"kji_decision","link":"https:\/\/kohenavocats.com\/zh-hans\/jurisprudences\/boygues-uk-ltd-v-sharpfibre-ltd\/","title":{"rendered":"Boygues (UK) Ltd v Sharpfibre Ltd"},"content":{"rendered":"<div class=\"kji-decision\">\n<div class=\"kji-full-text\">\n<p>1. In this action the Claimant (\u201cBYUK\u201d) claims damages from the Defendant (\u201cSharpfibre\u201d) for allegedly defective cladding installed as part of the construction of a new Premier Inn Hotel which formed part of the Bedford Riverside development. 2. BYUK\u2019s claim concerns the cladding system installed in respect of the Hotel and arises out of the Grenfell Tower fire which occurred on 14 June 2017. 3. In April 2015 Bedford Riverside Regeneration Ltd (\u201cthe Developer\u201d) engaged a contractor, J B Leadbitter &amp; Co. Limited (\u201cJBL\u201d) to construct the hotel under a design and build contract. 4. JBL in turn engaged Sharpfibre under a design and build sub-contract to carry out \u201cstructural framing external walling, external cladding\u201d. 5. In April 2016 JBL also appointed the Third Party (\u201cMP\u201d) as architect in respect of the development. Before this appointment MP had provided in October 2015 an Insulation Specification. 6. In June 2016 BYUK entered into a novation agreement which BYUK contends novated the sub-contract from JBL to BYUK. 7. In August 2016 JBL, BYUK and MP entered into a novation agreement which novated MP\u2019s appointment to BYUK. 8. In March 2017, JBL, BYUK and the Developer entered into a novation agreement under which the main contract was novated to BYUK. 9. The Hotel was certified as practically complete in April 2017. 10. BYUK\u2019s case is that in the aftermath of the Grenfell Tower fire, inspections were carried out at the Hotel and the view was formed that the cladding and insulation products that had been installed were not acceptable. It is BYUK\u2019s case that it agreed to undertake works to remove and replace the cladding and insulation at BYUK\u2019s own cost. 11. Having reached that agreement, BYUK then claimed against Sharpfibre that the cladding and insulation products were non-compliant with the requirements of the Building Regulations and were non-compliant with the sub-contract. It is BYUK\u2019s case that Sharpfibre was fully contractually responsible for the design of all the sub-contract works. 12. The amount of the claim brought by BYUK against Sharpfibre is in excess of \u00a31,950,000. 13. BYUK\u2019s claim is disputed by Sharpfibre. 14. BYUK has made no claim itself against MP, but Sharpfibre has brought a contribution claim against MP under the Civil Liability (Contribution) Act 1978. I return to the nature of the claim below. 15. On 1 May 2020 I held a CMC by telephone. Most matters in respect of directions leading to trial and as to cost budgeting were then resolved, but there are some matters which were left for further submissions in writing if agreement could not be reached. This judgment deals with those outstanding issues. Cost budgeting 16. At the hearing on 1 May, both Sharpfibre and MP attacked the cost budget put forward by BYUK, which proposed a figure of \u00a31,537.644.55 for incurred and estimated future costs. 17. I determined that the amount of that total figure compared to the amount claimed did justify a more detailed look applying the guidance in CIP Properties Limited v Galliford Try Infrastructure Limited [2015] EWHC 481 (TCC) and GSK Project Management Limited (In Liquidation) v QPR Holdings Limited [2015] EWHC 2274 (TCC). I reduced the cost budget, mainly, but not entirely, in respect of counsel\u2019s fees. 18. The parties were left to go away and attempt to agree a revised cost budget for BYUK\u2019s costs based upon the decisions I had made. 19. In the event there is one issue left to resolve between BYUK and Sharpfibre. 20. In the original cost budgets prepared by all parties, no allowance had been made for the possibility that the judge conducting the trial might direct that the parties should file written closing submissions. I directed that this should be dealt with by way of a Contingent Cost. 21. The cost put forward by BYUK for this is \u00a366,000 being for 6 days of work by counsel and substantial fee earner time. 22. Sharpfibre contends that the cost should be limited to \u00a316,600, being leading and junior counsel\u2019s refreshers for one day of oral submissions and a total of \u00a36,950 in respect of fee earner\u2019s time (10 hours each for a partner and senior associate). 23. To put this in context, Sharpfibre\u2019s revised cost budget has assumed a total of \u00a341,515 for four days of written submissions and a one day hearing. 24. As Mr Reid has submitted in his written submissions in this respect, the difference between the parties largely relates to (a) Sharpfibre\u2019s assumption that I had ordered that the costs allowed for the trial phase should be treated as including the costs of written submissions; and (b) the involvement of leading counsel. 25. In my view the cost proposed by BYUK should be allowed in full as a contingent cost. I did not understand the budget before me to include any figure for written submissions, and I did not allow the costs for the trial phase on that basis. On the contrary, I anticipated that the whole of the projected costs of written submissions would be additional, and would be included on a contingent basis. 26. This concludes the only outstanding item as between BYUK and Sharpfibre. Disclosure 27. As between Sharpfibre and MP there are two outstanding issues, both relating to Sharpfibre\u2019s request for disclosure from MP. 28. The first relates to issue 20 on the List of Issue for Disclosure. As originally formulated by Sharpfibre, the issue is: \u201cWhat steps did BYUK and\/or Mountford Piggott take to assess and\/or ensure quality control of the works?\u201d 29. Sharpfibre seeks in the alternative disclosure in respect of the issue as reformulated thus: \u201cWhat steps did BYUK and\/or Mountford Piggott take to assess and\/or ensure quality controlcompliance of the works with applicable contractual, statutory or other requirements?\u201d 30. MP is willing to give disclosure against an issue formulated as follows: \u201cWhat information was apparent to BYUK and\/or Mountford Piggott when carrying out their assessment functions to suggest that Sharpfibre\u2019s works were not contractually compliant and\/or did not comply with Revision E?\u201d 31. The part of the pleaded case to which these different formulations of the issue are relevant is contained in paragraphs 62.12 and 62.13 of Sharpfibre\u2019s Particulars of Additional Claim: \u201c62.12 Failure to verify or take reasonable steps to procure BYUK to verify the compliance of the design and specification of the cladding panels, insulation and\/or adhesive that Sharpfibre proposed to use and\/or did use in respect of Block 5 as against the Cladding Specification (Rev. E) and\/or the Insulation Specification and\/or as against Requirement B4(1) of the Building Regulations and the guidance in respect thereof contained in Approved Document B, whether in accordance with the Required Standard or at all. \u201c62.13 Failure to identify or take reasonable steps to enable BYUK to identify any potential non-compliance the design and specification of the cladding panels, insulation and\/or adhesive that Sharpfibre proposed to use and\/or did use in respect of Block 5 as against the Cladding Specification (Rev. E) and\/or Insulation Specification and\/or as against Requirement B(4)(1) of the Building Regulations and the guidance in respect thereof contained in Approved Document B, whether in accordance with the Required Standard or at all.\u201d 32. MP concedes in its written submissions that disclosure in respect of the issue as formulated by it would require it to carry out a reasonable search for (1) its considerations of Sharpfibre\u2019s construction design drawings and other information and (2) its inspections of Sharpfibre\u2019s works so as to identify any fact or matter which might suggest that the works were non-compliant. 33. In my judgment, the issue as formulated by MP, taken with its concession as set out in paragraph 32 above is a reasonable and proportionate approach to disclosure. Indeed, in practice I doubt if there will be a significant difference between disclosure in response to the issue as reformulated by Sharpfibre and that in response to the issue as formulated by MP as explained above. 34. The other issue as between Sharpfibre and MP relates to disclosure of \u201cnarrative documents\u201d. 35. Pursuant to PD 51U, para. 8, in relation to Extended Disclosure on the basis of Model D it is required that: \u201cThe order should specify whether a party giving Model D disclosure is to search for and disclose Narrative Documents. If the order does not so specify, Narrative Documents should not be disclosed.\u201d 36. However, where Narrative Documents are not to be included, para. 9.6(2) provides that this must also be addressed: \u201c\u2026if Narrative Documents are to be excluded, how that is to be achieved in a reasonable and proportionate way\u201d. 37. The definition of \u201cNarrative Documents\u201d is provided in Appendix 1 to PD 51U (para. 1.11): \u201c\u201cNarrative Document\u201d means a document which is relevant only to the background or context of material facts or events, and not directly to the Issues for Disclosure; for the avoidance of doubt an adverse document (as defined at paragraph 2.6) is not to be treated as a Narrative Document\u201d. 38. Sharpfibre has offered to qualify this by the following limitation: \u201cIn relation to disclosure between Sharpfibre and MP, \u201cNarrative Document shall have the following meaning (in substitution for the definition in PD 51U Appendix 1): \u201c\u201cNarrative Document\u201d means a document which is relevant only to the background or context of material facts or events, and not directly to the Issues for Disclosure, and which isidentified from a keyword search carried out in connection withany of the Issues for Disclosure. [the underlined text being supplemental to the definition in PD 51U] \u201cFurther, where relevant documents are identified and appear in an email chain, the entire email chain shall be disclosed. If further documents may reasonably be required to understand the context or background to relevant documents disclosed to it, a party may make a supplementary request for the same.\u201d 39. In its submissions MP raises a number of difficulties with the proposal even as so modified. 40. MP\u2019s submission is that in order to justify disclosure there must be (1) a real (as opposed to a fanciful) prospect that in connection with a particular issue a document exists which is relevant only to the background or context of material facts or events, and not directly to the Issue, but which would none the less be sufficiently important to the parties\u2019 cases that it merit searches, analysis and the other costs of disclosure and (2) no real likelihood that such a document will emerge as a result of the disclosure exercise in respect of any other Issue. 41. The submissions then continue (at paragraphs 20 to 22): \u201cWhat kinds of documents does Sharpfibre seek? That is something of a mystery. Despite efforts to complicate it, this is a building dispute. It is not a fraud claim. It is not likely to involve secret meetings, obscure processes or hidden participants. The documents which MP has which are going to be relevant to the issues (including known adverse documents) will be the documents in respect of which disclosure is already sought. Precisely what \u201ccontext\u201d does Sharpfibre need otherwise irrelevant documents to understand? \u201cMoreover, how is MP supposed to search for and identify \u201cnarrative documents\u201d ? What are the material facts or events where there is likely (1) to be some cache of documents which cast a new light on the fact or event and where (2) those documents would not already be disclosed under Issues 1 to 20 ? How does MP go about finding them? \u201cWhat are the prospects that after a lengthy and expensive process MP will find relevant documents which it would not otherwise have disclosed ? The Court is asked to consider Items 1 to 8 and 10 to 20 (the latter in either form). These Issues were compiled by Sharpfibre in order to ensure that nothing of any possible relevance failed to be disclosed. They are very broad categories cast in relation to an already very expansively pleaded case.\u201d 42. In my judgment there is strength in these submissions. The Court\u2019s investigations will be an objective analysis of whether MP in carrying out its functions did so to the standards of a competent professional. I do not believe that the width of disclosure sought will assist in the determination of the issues which those investigations will examine. 43. Accordingly the disclosure of narrative documents is refused on the basis that such disclosure is not necessary for the fair disposal of the issues in this action. 44. This ruling does not preclude an application in due course for disclosure of specific documents of classes of documents where these can be shown to be relevant.<\/p>\n<\/div>\n<hr class=\"kji-sep\" \/>\n<p class=\"kji-source-links\"><strong>Sources officielles :<\/strong> <a class=\"kji-source-link\" href=\"https:\/\/caselaw.nationalarchives.gov.uk\/ewhc\/tcc\/2020\/1309\" target=\"_blank\" rel=\"noopener noreferrer\">consulter la page source<\/a><\/p>\n<p class=\"kji-license-note\"><em>Open Justice Licence (The National Archives).<\/em><\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>1. In this action the Claimant (\u201cBYUK\u201d) claims damages from the Defendant (\u201cSharpfibre\u201d) for allegedly defective cladding installed as part of the construction of a new Premier Inn Hotel which formed part of the Bedford Riverside development. 2. BYUK\u2019s claim concerns the cladding system installed in respect of the Hotel and arises out of the Grenfell Tower fire which occurred&#8230;<\/p>\n","protected":false},"featured_media":0,"template":"","meta":{"_crdt_document":""},"kji_country":[7608],"kji_court":[8445],"kji_chamber":[],"kji_year":[41198],"kji_subject":[7612],"kji_keyword":[7662,9671,7918,8359,43881],"kji_language":[7611],"class_list":["post-747165","kji_decision","type-kji_decision","status-publish","hentry","kji_country-royaume-uni","kji_court-high-court-technology-and-construction-court","kji_year-41198","kji_subject-fiscal","kji_keyword-disclosure","kji_keyword-documents","kji_keyword-issue","kji_keyword-respect","kji_keyword-sharpfibre","kji_language-anglais"],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v27.5 (Yoast SEO v27.5) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Boygues (UK) Ltd v Sharpfibre Ltd - Ma\u00eetre Hassan Kohen, avocat en droit p\u00e9nal \u00e0 Paris<\/title>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/kohenavocats.com\/zh-hans\/jurisprudences\/boygues-uk-ltd-v-sharpfibre-ltd\/\" \/>\n<meta property=\"og:locale\" content=\"zh_CN\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Boygues (UK) Ltd v Sharpfibre Ltd\" \/>\n<meta property=\"og:description\" content=\"1. In this action the Claimant (\u201cBYUK\u201d) claims damages from the Defendant (\u201cSharpfibre\u201d) for allegedly defective cladding installed as part of the construction of a new Premier Inn Hotel which formed part of the Bedford Riverside development. 2. BYUK\u2019s claim concerns the cladding system installed in respect of the Hotel and arises out of the Grenfell Tower fire which occurred...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/kohenavocats.com\/zh-hans\/jurisprudences\/boygues-uk-ltd-v-sharpfibre-ltd\/\" \/>\n<meta property=\"og:site_name\" content=\"Ma\u00eetre Hassan Kohen, avocat en droit p\u00e9nal \u00e0 Paris\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4\" \/>\n\t<meta name=\"twitter:data1\" content=\"10 \u5206\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/zh-hans\\\/jurisprudences\\\/boygues-uk-ltd-v-sharpfibre-ltd\\\/\",\"url\":\"https:\\\/\\\/kohenavocats.com\\\/zh-hans\\\/jurisprudences\\\/boygues-uk-ltd-v-sharpfibre-ltd\\\/\",\"name\":\"Boygues (UK) Ltd v Sharpfibre Ltd - Ma\u00eetre Hassan Kohen, avocat en droit p\u00e9nal \u00e0 Paris\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/zh-hans\\\/#website\"},\"datePublished\":\"2026-04-29T05:39:26+00:00\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/zh-hans\\\/jurisprudences\\\/boygues-uk-ltd-v-sharpfibre-ltd\\\/#breadcrumb\"},\"inLanguage\":\"zh-Hans\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/kohenavocats.com\\\/zh-hans\\\/jurisprudences\\\/boygues-uk-ltd-v-sharpfibre-ltd\\\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/zh-hans\\\/jurisprudences\\\/boygues-uk-ltd-v-sharpfibre-ltd\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/kohenavocats.com\\\/zh-hans\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Jurisprudences\",\"item\":\"https:\\\/\\\/kohenavocats.com\\\/zh-hans\\\/jurisprudences\\\/\"},{\"@type\":\"ListItem\",\"position\":3,\"name\":\"Boygues (UK) Ltd v Sharpfibre Ltd\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/zh-hans\\\/#website\",\"url\":\"https:\\\/\\\/kohenavocats.com\\\/zh-hans\\\/\",\"name\":\"Kohen Avocats\",\"description\":\"Ma\u00eetre Hassan Kohen, avocat p\u00e9naliste \u00e0 Paris, intervient exclusivement en droit p\u00e9nal pour la d\u00e9fense des particuliers, notamment en mati\u00e8re d\u2019accusations de viol. Il assure un accompagnement rigoureux d\u00e8s la garde \u00e0 vue jusqu\u2019\u00e0 la Cour d\u2019assises, veillant au strict respect des garanties proc\u00e9durales.\",\"publisher\":{\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/zh-hans\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/kohenavocats.com\\\/zh-hans\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"zh-Hans\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/zh-hans\\\/#organization\",\"name\":\"Kohen Avocats\",\"url\":\"https:\\\/\\\/kohenavocats.com\\\/zh-hans\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"zh-Hans\",\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/zh-hans\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/kohenavocats.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/Logo-2-1.webp\",\"contentUrl\":\"https:\\\/\\\/kohenavocats.com\\\/wp-content\\\/uploads\\\/2026\\\/01\\\/Logo-2-1.webp\",\"width\":2114,\"height\":1253,\"caption\":\"Kohen Avocats\"},\"image\":{\"@id\":\"https:\\\/\\\/kohenavocats.com\\\/zh-hans\\\/#\\\/schema\\\/logo\\\/image\\\/\"}}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Boygues (UK) Ltd v Sharpfibre Ltd - Ma\u00eetre Hassan Kohen, avocat en droit p\u00e9nal \u00e0 Paris","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/kohenavocats.com\/zh-hans\/jurisprudences\/boygues-uk-ltd-v-sharpfibre-ltd\/","og_locale":"zh_CN","og_type":"article","og_title":"Boygues (UK) Ltd v Sharpfibre Ltd","og_description":"1. In this action the Claimant (\u201cBYUK\u201d) claims damages from the Defendant (\u201cSharpfibre\u201d) for allegedly defective cladding installed as part of the construction of a new Premier Inn Hotel which formed part of the Bedford Riverside development. 2. BYUK\u2019s claim concerns the cladding system installed in respect of the Hotel and arises out of the Grenfell Tower fire which occurred...","og_url":"https:\/\/kohenavocats.com\/zh-hans\/jurisprudences\/boygues-uk-ltd-v-sharpfibre-ltd\/","og_site_name":"Ma\u00eetre Hassan Kohen, avocat en droit p\u00e9nal \u00e0 Paris","twitter_card":"summary_large_image","twitter_misc":{"\u9884\u8ba1\u9605\u8bfb\u65f6\u95f4":"10 \u5206"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/kohenavocats.com\/zh-hans\/jurisprudences\/boygues-uk-ltd-v-sharpfibre-ltd\/","url":"https:\/\/kohenavocats.com\/zh-hans\/jurisprudences\/boygues-uk-ltd-v-sharpfibre-ltd\/","name":"Boygues (UK) Ltd v Sharpfibre Ltd - Ma\u00eetre Hassan Kohen, avocat en droit p\u00e9nal \u00e0 Paris","isPartOf":{"@id":"https:\/\/kohenavocats.com\/zh-hans\/#website"},"datePublished":"2026-04-29T05:39:26+00:00","breadcrumb":{"@id":"https:\/\/kohenavocats.com\/zh-hans\/jurisprudences\/boygues-uk-ltd-v-sharpfibre-ltd\/#breadcrumb"},"inLanguage":"zh-Hans","potentialAction":[{"@type":"ReadAction","target":["https:\/\/kohenavocats.com\/zh-hans\/jurisprudences\/boygues-uk-ltd-v-sharpfibre-ltd\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/kohenavocats.com\/zh-hans\/jurisprudences\/boygues-uk-ltd-v-sharpfibre-ltd\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/kohenavocats.com\/zh-hans\/"},{"@type":"ListItem","position":2,"name":"Jurisprudences","item":"https:\/\/kohenavocats.com\/zh-hans\/jurisprudences\/"},{"@type":"ListItem","position":3,"name":"Boygues (UK) Ltd v Sharpfibre Ltd"}]},{"@type":"WebSite","@id":"https:\/\/kohenavocats.com\/zh-hans\/#website","url":"https:\/\/kohenavocats.com\/zh-hans\/","name":"Kohen Avocats","description":"Ma\u00eetre Hassan Kohen, avocat p\u00e9naliste \u00e0 Paris, intervient exclusivement en droit p\u00e9nal pour la d\u00e9fense des particuliers, notamment en mati\u00e8re d\u2019accusations de viol. Il assure un accompagnement rigoureux d\u00e8s la garde \u00e0 vue jusqu\u2019\u00e0 la Cour d\u2019assises, veillant au strict respect des garanties proc\u00e9durales.","publisher":{"@id":"https:\/\/kohenavocats.com\/zh-hans\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/kohenavocats.com\/zh-hans\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"zh-Hans"},{"@type":"Organization","@id":"https:\/\/kohenavocats.com\/zh-hans\/#organization","name":"Kohen Avocats","url":"https:\/\/kohenavocats.com\/zh-hans\/","logo":{"@type":"ImageObject","inLanguage":"zh-Hans","@id":"https:\/\/kohenavocats.com\/zh-hans\/#\/schema\/logo\/image\/","url":"https:\/\/kohenavocats.com\/wp-content\/uploads\/2026\/01\/Logo-2-1.webp","contentUrl":"https:\/\/kohenavocats.com\/wp-content\/uploads\/2026\/01\/Logo-2-1.webp","width":2114,"height":1253,"caption":"Kohen Avocats"},"image":{"@id":"https:\/\/kohenavocats.com\/zh-hans\/#\/schema\/logo\/image\/"}}]}},"jetpack_likes_enabled":false,"jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/kohenavocats.com\/zh-hans\/wp-json\/wp\/v2\/kji_decision\/747165","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/kohenavocats.com\/zh-hans\/wp-json\/wp\/v2\/kji_decision"}],"about":[{"href":"https:\/\/kohenavocats.com\/zh-hans\/wp-json\/wp\/v2\/types\/kji_decision"}],"wp:attachment":[{"href":"https:\/\/kohenavocats.com\/zh-hans\/wp-json\/wp\/v2\/media?parent=747165"}],"wp:term":[{"taxonomy":"kji_country","embeddable":true,"href":"https:\/\/kohenavocats.com\/zh-hans\/wp-json\/wp\/v2\/kji_country?post=747165"},{"taxonomy":"kji_court","embeddable":true,"href":"https:\/\/kohenavocats.com\/zh-hans\/wp-json\/wp\/v2\/kji_court?post=747165"},{"taxonomy":"kji_chamber","embeddable":true,"href":"https:\/\/kohenavocats.com\/zh-hans\/wp-json\/wp\/v2\/kji_chamber?post=747165"},{"taxonomy":"kji_year","embeddable":true,"href":"https:\/\/kohenavocats.com\/zh-hans\/wp-json\/wp\/v2\/kji_year?post=747165"},{"taxonomy":"kji_subject","embeddable":true,"href":"https:\/\/kohenavocats.com\/zh-hans\/wp-json\/wp\/v2\/kji_subject?post=747165"},{"taxonomy":"kji_keyword","embeddable":true,"href":"https:\/\/kohenavocats.com\/zh-hans\/wp-json\/wp\/v2\/kji_keyword?post=747165"},{"taxonomy":"kji_language","embeddable":true,"href":"https:\/\/kohenavocats.com\/zh-hans\/wp-json\/wp\/v2\/kji_language?post=747165"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}