Power Outages: When Households in England Can Claim Statutory Payments for a Power Cut

Hassan KOHEN acts in urgent matters, from the police station to the assize court. Initial strategic analysis: €80 incl. VAT, personal reply within 24 hours.

100% confidential · Legal professional privilege · No obligation

Article generated by artificial intelligence, through a process designed and supervised by the firm

Source: French Court of Cassation – Judilibre and Légifrance open data

Paris Bar Police custody, investigation, assize court CNB listing avocat.fr
Maître Hassan KOHEN, avocat au Barreau de Paris
Hassan KOHEN
Attorney at the Paris Bar

Power Outages: When Households in England Can Claim Statutory Payments for a Power Cut

Speak to a lawyer 06 89 11 34 45

By Hassan Kohen, lawyer at the Paris Bar.

Power outages are being searched in the United Kingdom. For a household in England, one of the first questions after a lengthy cut is whether the company that runs the local network owes a statutory payment. The answer turns on more than the time between the lights going out and coming back. The legal clock can start when the distributor first learns of the interruption, including through its own monitoring systems. The initial time allowed for restoration depends on the type of network fault and, in some cases, on the number of premises affected or the statutory classification of the weather.

The Electricity (Standards of Performance) Regulations 2015 govern the payments discussed here. Their rules can lead to different results for households whose outages lasted the same length of time. They also distinguish the payment for a missed restoration standard from any separate claim over spoiled food, damaged equipment or other losses.

This article provides general information on the law applicable in England as checked on 19 November 2026. It uses hypothetical examples. In an individual case, the facts to establish include which network was affected, what the distributor knew and when, when supply was restored and whether the distributor can rely on a specific exemption.

I. Which rules apply to the interruption?

A. Identify the network and establish when the legal clock began

The company that sends the electricity bill is the supplier. The electricity distributor operates the network to which the premises are connected. A household might receive a credit through its supplier, but the restoration standard examined here generally applies to the distributor. The distinction comes from section 39A of the Electricity Act 1989, which provides for standards that apply to distribution activities and for payments where a distributor fails to meet those standards. Subsection (4) allows the regulations to provide for the supplier to make compensation available on the distributor’s behalf. The way a credit appears on the bill therefore tells you little about which entity had the original duty to restore supply.

For an ordinary household, the starting point is the electricity distributor to whose network the property is directly connected. Regulation 4 deals with cases in which a fault on another distribution system caused the interruption. In the circumstances described there, responsibility can move to that other distributor when the directly connected distributor can rely on regulation 9(9) and has notified the other operator. The customer may still hear first from the local distributor. When an operator says the incident originated elsewhere, ask which network experienced the fault, which distributor was notified, and who is dealing with the payment. A precise answer can prevent the same claim from being passed between companies without anyone addressing the restoration clock.

The same regulation defines the start of that clock. Take the earlier of the first time the distributor was told by the customer about loss of supply to the premises and the first time it was told by someone else, or became aware through one of its automated systems, of circumstances in which a listed restoration rule applied or could reasonably be expected to apply to premises including the customer’s. An incident reported elsewhere on the network may therefore count if what the distributor learned covered the customer’s premises. A report about a different fault, affecting a different part of the network, may tell you little. The question is what the distributor knew about the relevant incident at the point in question.

Suppose a household loses power at 6 pm, a neighbour reports the incident at 6.20 pm, and the customer makes a separate report at 7 pm. If the neighbour’s report gave the distributor the information required by regulation 4 for premises including that household, 6.20 pm is the relevant start on those assumed facts. If monitoring had already supplied the required information at 6.05 pm, that earlier time would be the one to examine. The household’s own call still matters as evidence if the distributor disputes the earlier times. Keep the call record and any reference number even if an outage map has already acknowledged a fault in the area.

The record of restoration deserves just as much attention. A map entry that closes a large network incident and an individual customer’s report that the premises are still without supply can both exist. Give the distributor the property address, the entry or reference it issued and the approximate time supply actually returned there. If the distributor gives a different time, ask whether that time refers to the particular connection or to work completed on the wider network. A reasonable account of what you observed, supported by contemporaneous messages or timestamps where you have them, is more useful than an estimate reconstructed many weeks later.

This article concerns loss of power caused by faults on the distribution system. If power is unavailable only to a circuit inside a property, the cause needs to be established before applying those rules. Regulations 5 and 7 expressly leave out cases covered by regulation 11, which has its own standard concerning attendance when the distributor’s fuse has operated. Regulation 12 separately deals with notice of interruptions for authorised purposes such as planned work. These distinctions matter because the condition for a payment and, in the case of certain planned work, the deadline for claiming it can differ.

B. Distinguish ordinary faults, large single faults and severe weather

The first test for ordinary conditions is regulation 5. Where a qualifying distribution fault interrupts supply and no relevant exception applies, the initial period for a household is 12 hours. The distributor owes the prescribed initial sum if supply is not restored within that period. A further sum is due in respect of each succeeding period of 12 hours at whose expiry the supply remains interrupted. The time periods are in Part 1 of Schedule 2. A 19-hour interruption on this clock can trigger the first payment, while the first additional block ends at hour 24. Count elapsed time from the statutory start and compare the actual restoration time with the end of each block.

Regulation 6 deals with a single failure, fault or incident of damage on the relevant distribution system that interrupts supply to at least 5,000 customers’ premises. The initial period is 24 hours, followed by 12-hour blocks. A cap applies. The requirement for a single cause matters. If several separate faults interrupt supply across the same region during a busy day, the number of reports across the region does not by itself establish that regulation 6 applies to any one household. If the distributor uses the 24-hour period because of the scale of an ordinary outage, ask which single fault it counted and whether the household was included in the count. Regulation 6(3) also disapplies certain exemptions that regulation 5 would otherwise carry across from regulation 9.

Some weather-related outages qualify for regulation 7. The word severe has a specific meaning in this context. Regulation 4 and Part 3 of Schedule 2 look at the number of weather-related faults at higher distribution voltage within 24 hours on the designated distributor’s system. The schedule lists the numerical thresholds for the relevant systems. The classification also takes account of whether the weather was predominantly related to lightning. The current classification follows the Electricity (Standards of Performance) (Amendment) Regulations 2024, which came into force on 1 November 2024. A customer deciding which clock applies should ask for the statutory category and the basis for it. A weather warning or the description of a storm in a service message supplies neither the network fault count nor its classification under regulation 4.

In category 1, the initial period is 24 hours. In category 2, it is 48 hours. Both categories add a further amount for each succeeding six-hour period at the end of which supply remains unrestored, subject to the applicable cap and exemptions. In category 1, 37 hours without power on the statutory clock would take the household past the initial threshold and the end of two further blocks, at hours 30 and 36. On the same facts with a category 2 classification, 37 hours falls within the initial period. Both examples assume that the fault and the household fall within regulation 7. They illustrate why a reply giving only the total duration of a cut leaves the payment question unresolved.

A useful calculation starts with the relevant row in Schedule 2. Take the initial payment and add the applicable supplementary payment for each block reached. Then apply any cap. The cash figures printed in the schedule are the starting point for indexation. Regulation 21A, inserted by the Electricity (Standards of Performance) (Amendment) Regulations 2023, adjusts the sums for each financial year from 1 April 2024 using the change in the January CPIH index from its January 2023 level and rounding the resulting figures to the nearest five pounds. Its cap formula adjusts and rounds the underlying sum before the multiplier in the schedule is applied. A payment breakdown should show which financial year and which adjusted figures the distributor used. Under regulation 22, distributors must make a current statement of these rights available, including on their websites, and send a copy to anyone who requests one.

If the cut happened because the distributor deliberately disconnected different groups in rotation following a qualifying network failure, regulation 8 supplies a separate test. Periods associated with the same rota event can be combined for the 24-hour threshold in Schedule 2. A collection of unrelated losses of power over a year calls for the separate multiple-interruption test in regulation 10. The distributor’s description of the cause and its record of the events are more useful when you can compare each entry with the rule it says it applied. The English-language overview from the author’s firm in Paris provides context about the author. The entitlement discussed here follows English law and the British legislation cited in this article.

II. How to ask for a payment and challenge a refusal

A. Prepare a claim that distinguishes the outage from the payment deadline

A concise account should identify the property, who was the customer at the time, the date and time the interruption was first observed and the time the supply returned. Include the first report or the first notification that you have, any messages showing that the fault was already known, and the incident reference. If power came back briefly and then went again, record the intervals and say what you know about them. Present estimates as estimates. If you are asking for a payment under one of the restoration standards, say which time period you believe applies and ask the distributor to explain any different start time or classification it uses.

Regulation 9(4) is important for a customer who falls outside the statutory definition of a Priority Services Register Customer. It contains an exemption under the listed restoration standards where the distributor has, within three months of restoration at the premises, been unable to identify the customer despite reasonable efforts or has received no compensation claim from the customer. A fault report alerts the distributor to a loss of supply. A claim expressly asks for the statutory payment and creates a dated record of that request. If the payment has yet to be confirmed, make the claim promptly after restoration and keep proof that it reached the distributor. Missing the three-month window can allow the distributor to rely on the exemption even where the underlying restoration delay was long enough for a payment.

For a household identified as a Priority Services Register Customer, regulation 3(2)(f) provides for automatic payment for qualifying interruptions under regulations 5 to 8 where no exemption applies. The definition in regulation 3 matters. If the distributor has no record of the customer’s status or has linked it to the wrong address, the automatic process may miss the premises. A household querying an absent payment can ask whether the distributor recognised that status when handling the incident, as well as asking for its restoration record. The automatic route changes how an eligible customer receives payment. The same underlying questions about the outage and the applicable standards still determine eligibility.

The route for repeated interruptions works differently. Under regulation 10, the supply to the same directly connected premises must be interrupted for four qualifying periods, each lasting at least three hours, in a relevant year beginning on 1 April. The same customer, or at least one of the same joint customers, must have been the customer at the premises on all four occasions. Some interruptions are excluded by regulation 10(3), including certain notified cuts and interruptions to which regulations 5, 6, 7, 8 or 11 apply. A brief restoration of up to three minutes in the circumstances described in regulation 10(2)(a) is ignored. That rule deals with interruptions associated with restoration work and helps explain why the legal count can differ from a count of separate alerts. The claim must be received within three months after the end of the relevant year. Keep a separate line for each incident in the record, with the date and duration and any reason the distributor gives for excluding it.

A notified cut for planned work raises a different claim. Under regulation 12(7)(c), the distributor may rely on the absence of a compensation claim received within one month from the applicable date for the notice failures covered there. The questions are how much advance notice was due under the applicable part of regulation 12, what the notice actually said, and whether the supply was interrupted on a day covered by it. Keep the original notification as well as any revised one. If both a planned work notice and an emergency outage message refer to the same address on the same date, ask which event caused the interruption before applying either deadline.

The obligation to make a payment has its own timetable. Regulation 19 and Schedule 2 provide a prescribed period of ten working days from the applicable date for the payments covered by regulation 19(4) and (5), apart from regulation 7 payments, which must be made as soon as reasonably practicable. The facts that determine the applicable date depend on the obligation involved. A failure to pay as required can itself generate a prescribed payment, subject to exceptions including a genuine dispute over liability to make the original payment. The expiry of a customer’s claim window and a distributor’s deadline to make a payment answer different questions. If the bill shows a credit after an outage, the accompanying explanation should allow the customer to tell whether the credit covers the initial restoration payment, further time blocks or an additional sum for late payment.

B. Check the grounds for refusal and keep other losses distinct

A refusal should be read against the specific rule that the distributor relies on. For example, regulation 9(2) covers circumstances in which it was unreasonable for the distributor to be aware that supply had not been restored. Evidence that the customer told the distributor that the property was still affected after the wider incident had closed is relevant to that explanation. Regulation 9(8) covers several events that can make action before the relevant time impracticable. Where that provision applies, the distributor must also have taken all reasonable steps to prevent the circumstances from occurring and to prevent them from having that effect. Some of those grounds are unavailable under the large single-fault rule in regulation 6. Ask for the paragraph relied on and the facts said to satisfy it. A brief reference to difficult working conditions can leave both points unanswered.

It also helps to establish whether the distributor disputes the initial standard or only the number of additional periods. In a category 1 example, a distributor might agree that the 24-hour threshold was missed but decide that supply was restored before the second additional block ended at hour 36. The relevant disagreement is then over the clock or the restoration timestamp, and there may be little value in sending more material about the weather category. Conversely, where the distributor says it was a category 2 event, the threshold itself changes. A request for a calculation that separates the starting time, category, number of complete periods and cap brings the points in dispute into focus.

Section 39B of the Electricity Act 1989 allows either party to refer a dispute under the statutory standards to the regulatory authority. Regulation 18 of the 2015 Regulations points to Schedule 3 for the procedure. The statutory determination must give reasons. Under paragraph 2 of Schedule 3, the authority must normally decide within 80 working days of the referral. It may extend the period with the consent of the referring party or parties if there are good reasons. A customer preparing a referral can set out the issues still disputed, the relevant regulation and the difference between the sum paid and the sum claimed. Enclose the distributor’s written position, the chronology and the documents supporting each disputed time or other fact. The referral described here concerns the entitlement under the standards. It helps to separate that question from any request based on a different legal duty.

A prescribed payment depends on missing the standard in the circumstances defined by the regulations. Receipts for spoiled food or bills for emergency accommodation do not set the rate under regulation 7. Section 39A(5) preserves any other remedy that may be available in respect of the act or omission that constituted the failure. A separate claim would need its own legal basis and evidence connecting the loss to the conduct complained of. Keep photographs, invoices and records of necessary expenses where relevant, while keeping the calculation of the statutory sum in a separate part of the file. A payment by the distributor can settle the amount due under the standard without establishing liability for each expense a household incurred.

Conversely, a household with no substantial financial loss can still check whether a fixed payment is due. The central evidence is the distributor’s information about the incident, the restoration time for the premises, the statutory category and any exception. Where the figures in two messages conflict, ask the distributor to reconcile them by reference to the affected connection. That may produce a correction without a dispute about the entire incident. You can then check any revised calculation against the adjusted payment rates for the relevant financial year and the terms in the schedule.

Conclusion

For a power outage in England, begin with the distributor’s first qualifying knowledge of the interruption and the time supply was restored at the affected premises. Establish whether the event was an ordinary fault, a large single fault or severe weather in the statutory sense. The answer selects the initial clock, the length of any additional payment blocks and any applicable cap.

The facts that need checking in a disputed case include the recorded start and restoration times, the fault or weather classification, whether the premises were affected throughout the period claimed and the basis for any exemption. A dated claim and a breakdown applying the correct financial year’s rates make it possible to test the payment on those facts. The statutory payment and any separate claim for actual losses remain distinct questions.

📄 Official circular