Your urban planning lawyer in Paris
Building permits Challenges Pre-emption Offences
First written analysis80 € incl. VAT
Describe your situation and attach your documents.Your written analysis within 24 working hours.
Or call the firm on +33 6 89 11 34 45
The firm in the media
Watch the videos and read their transcriptsVideos
Kohen Avocats, Paris 16th
How the firm assists you in urban planning law in Paris
Urban planning law · Paris 16th
What an urban planning lawyer does in Paris
An urban planning lawyer in Paris steps in when a building project comes up against the rules or the neighbours: a building permit (permis de construire) granted on the plot next door, a refusal of your own project, a disputed prior declaration (déclaration préalable), a town hall pre-empting the property you were about to buy, an official report (procès-verbal) drawn up for works carried out without authorisation. Kohen Avocats advises individuals, co-ownership associations (copropriétés), investors and companies, drafts challenges and pleads before the Paris Administrative Court (tribunal administratif de Paris), the administrative courts of the Paris region (Île-de-France) and the Paris Administrative Court of Appeal, as well as before the ordinary courts (juge judiciaire) when the case takes a criminal turn or demolition is sought.
Disputes over building permits are heard by the administrative court for the area in which the property is located (Article R. 312-7 of the Code of Administrative Justice (Code de justice administrative)): a permit issued by the City of Paris is challenged before the Paris Administrative Court. In Paris, a municipality listed in Article 232 of the General Tax Code (Code général des impôts), that court rules at first and last instance on permits to construct a building with more than two dwellings and on refusals of such permits, for challenges lodged until 31 December 2027 (Article R. 811-1-1 of the same code). There is then no appeal: only an appeal on points of law to the Council of State (Conseil d'État) remains open, which makes it essential to prepare the case carefully from the first instance.
Before the first appointment, gather what you already have: the permit order or the refusal decision, dated photographs of the site notice, the plans and the project description, your title deed or lease, letters from the town hall and, where applicable, the official report of the offence. You can send them now using the form at the bottom of the page.
The firm
Hassan Kohen
Lawyer (avocat) at the Paris Bar, urban planning law.
Official profile in the directory of French lawyers (CNB) · 4.9/5 on Google, more than 250 reviews
Kohen Avocats, at 10 avenue du Colonel Bonnet in the 16th arrondissement, assists owners, co-ownership associations, buyers and developers in Paris and the Paris region (Île-de-France) when their project or their living environment depends on a planning decision. The firm brings together in a single case the administrative litigation, the criminal side of planning offences and civil actions between neighbours: the same matter often comes before all three courts.
Your situation
Neighbour, developer or owner: the right approach
A single building site often brings three interests into conflict: that of the neighbour affected by the project, that of the owner behind it, and that of the local authority that authorises it, refuses it or prosecutes it. The firm starts by identifying your position, because it determines the competent court, the time limits and the relevant arguments.
A neighbour's project affects you
Challenging a building permit or a prior declaration, seeking the suspension of the works through an urgent application (référé), bringing a demolition claim before the ordinary courts once the permit has been annulled, or obtaining compensation for an abnormal neighbourhood disturbance (trouble anormal de voisinage).
You have a building project
Securing the application in advance with a planning certificate (certificat d'urbanisme), challenging a permit refusal or an objection to a prior declaration, defending your challenged permit and regularising it, opposing a withdrawal decided by the town hall.
You are an owner, seller or buyer
Responding to an official report for building without a permit, preparing the hearing before the criminal court (tribunal correctionnel), challenging a town hall pre-emption decision, checking that a property complies with planning rules before the sale.
Time limits
The time limits that decide a planning case
In planning matters, most challenges are lost on a time limit or a formality, before the merits are even examined. Here are the deadlines the firm checks first, as they result from the texts in force on 15 October 2026.
Two months of posting
The time limit for third parties to challenge a permit runs from the first day of a continuous two-month period of posting on the site (Article R. 600-2 of the French Planning Code (Code de l'urbanisme)). A site notice that omits the height of the building does not start this time limit running when nothing else allows the height to be estimated.
Fifteen days to notify
Any challenge, whether an informal appeal (recours gracieux) or a court action, must be notified to the mayor and to the permit holder by registered letter with acknowledgement of receipt within fifteen clear days of being lodged, failing which it is inadmissible (Article R. 600-1).
One month for an informal appeal
Since 28 November 2025, an informal appeal against a planning authorisation must be lodged within one month and no longer extends the time limit for going to court (Article L. 600-12-2).
Six months after completion
No challenge to a permit is admissible six months after the building is completed, the completion date being presumed, unless proven otherwise, to be the date on which the declaration of completion was received (Article R. 600-3).
Two months to raise your grounds
Before the court, no new ground may be raised once two months have passed since the first defence brief was communicated (Article R. 600-5): the application must be complete very early on.
Three months to withdraw a permit
The town hall may withdraw a permit, even a tacit one, only if it is unlawful and within three months of its issue; after that, only at the holder's request (Article L. 424-5).
Two months to pre-empt
After the declaration of intention to sell (déclaration d'intention d'aliéner), the holder of the pre-emption right has two months and may, within that period, make a single request for documents (Article L. 213-2).
Eighteen months under a certificate
An application filed within eighteen months of a planning certificate (certificat d'urbanisme) benefits from the rules in force on the date of the certificate, except for public safety or public health rules (Article L. 410-1).
Three years to start the works
The permit lapses if the works do not start within three years or are interrupted for more than a year (Article R. 424-17); it can be extended twice for one year (Article R. 424-21).
Our areas of practice
The firm's areas of practice in French planning law
Below are the situations in which the firm most often acts, with the texts and decisions that govern them. Each section refers to the official sources, available on Légifrance and on the website of the French Supreme Court (Cour de cassation).
Challenging a building permit
Third-party challenges
Challenging a neighbour's building permit
The challenge is prepared as soon as the site notice goes up: standing (intérêt à agir), time limit and notification decide whether it is admissible.
A neighbour's challenge to a building permit is an action for annulment (recours pour excès de pouvoir) brought before the administrative court. It is admissible only if the project is likely to directly affect the conditions in which you occupy, use or enjoy the property that you lawfully hold or occupy (Article L. 600-1-2 of the French Planning Code), this standing being assessed, save in special circumstances, on the date on which the application was posted at the town hall (Article L. 600-1-3). An immediate neighbour who puts forward specific evidence on the nature, size or location of the project in principle has standing: in Suresnes, the owner of the property opposite an upward extension, who argued that it would give a direct view onto his terrace, was held to have standing to bring proceedings (CE, 18 November 2020, No. 426585).
The application must be accompanied by your title deed or lease (Article R. 600-4) and notified to the mayor and to the permit holder within fifteen clear days (Article R. 600-1). The firm inspects the permit file at the town hall, compares the plans with the local urban plan (plan local d'urbanisme) on height, siting, setbacks and parking, and checks that the permit was properly posted: the time limit only runs from complete and proper posting, and a height missing from the site notice, or stated with a substantial error and with no other information allowing it to be estimated, prevents it from running (CE, 25 February 2019, No. 416610). The firm explains this challenge in detail on the page challenging a neighbour's building permit. Further reading: third-party challenges to a building permit and challenging a prior declaration.
Informal appeal
Informal appeal
Informal appeals: one month, with no extension of the court deadline
Since 28 November 2025, writing to the mayor no longer interrupts the time limit for bringing court proceedings.
Article L. 600-12-2 of the French Planning Code sets a one-month time limit for an informal or hierarchical appeal against a decision relating to planning authorisation. Silence for more than two months amounts to rejection. Crucially, this appeal does not extend the time limit for court proceedings. A neighbour who writes to the mayor and waits for a reply before going to court therefore lets the two-month period triggered by the site notice run (Article R. 600-2) and may find their claim time-barred.
An informal appeal remains useful: it may prompt the town hall to withdraw an unlawful permit within three months of its issue (Article L. 424-5) or open discussions with the permit holder. It now runs alongside the court application, never in its place, and must also be notified to the mayor and the permit holder within fifteen days (Article R. 600-1). Under the previous regime, the Council of State already held that an informal appeal not notified within that period had no effect on the time limit for court proceedings (CE, 28 January 2026, No. 499985).
Permit refusal or objection to a prior declaration
Refusal
Building permit refusal or objection to a prior declaration
The town hall must give all its reasons, and the court can order it to issue the permit.
The town hall processes a prior declaration in one month, a building permit for a single-family house in two months and other permits in three months (Article R. 423-23 of the French Planning Code). Its silence at the end of that period amounts, depending on the case, to a tacit permit or non-objection (Article R. 424-1). A refusal or objection must state all its reasons (Article L. 424-3) and can be challenged before the administrative court within two months of notification (Article R. 421-1 of the Code of Administrative Justice). Since 28 November 2025, the town hall can no longer introduce a new ground for refusal more than two months after the challenge was registered (Article L. 600-2).
When the court annuls a refusal after rejecting all its grounds, it must, if you request it, order the town hall to issue the authorisation, unless an applicable rule that the authority overlooked or a change in circumstances prevents this (CE, opinion, 25 May 2018, No. 417350). If the annulment has become final and you confirm your application within six months of its notification, planning rules adopted after the annulled refusal cannot be relied on against you (Article L. 600-2).
Defending your permit
Permit holder
Your permit is challenged: regularisation and defence
As a rule, a defect that can be remedied no longer leads to the annulment of the permit.
When the court, after dismissing the other grounds, considers that a defect affecting the permit can be remedied, it must in principle stay proceedings to allow regularisation (Article L. 600-5-1 of the French Planning Code). This applies even where the overall design of the project must be revised, provided the changes do not alter its very nature. The court need not do so if it chooses partial annulment or the permit holder refuses regularisation (CE, Section, opinion, 2 October 2020, No. 438318). It can also limit annulment to the affected part of the project (Article L. 600-5). A regularisation permit is subject to substantive scrutiny: the Council of State quashed a judgment that had checked regularisation for only one of the two buildings concerned (CE, 30 April 2025, No. 493959).
The permit holder may seek damages from the person bringing an abusive challenge, by separate written submissions (Article L. 600-7). The Paris Administrative Court of Appeal held that an association had brought an abusive challenge, appearing to act on behalf of a third party, a competitor of the permit holder. It nevertheless refused compensation because there was no direct link between the challenge and the alleged losses (CAA Paris, 3 October 2019, No. 17PA24045): evidence of loss must be prepared from the time the challenge is filed. The court registry also issues a certificate confirming that no challenge has been brought, useful to the notary and the bank (Article R. 600-7).
Permit withdrawal
Withdrawal
Withdrawal of a building permit by the town hall
Three months, and only for an unlawful permit.
A building, development or demolition permit, whether tacit or express, and a decision not to object to a prior declaration can only be withdrawn if unlawful and within three months of their date. After that period, withdrawal is possible only at the holder's express request (Article L. 424-5 of the French Planning Code). Filing a new application by the same holder for the same land does not withdraw the previous authorisation. Withdrawal of a decision creating rights also requires the holder to have been given an opportunity to submit observations (Articles L. 121-1 and L. 122-1 of the Code of Relations between the Public and the Administration (Code des relations entre le public et l’administration)).
The firm checks the date of issue, including for a tacit permit, compliance with the procedure allowing the holder to respond, and whether the alleged unlawfulness is established. It then responds in writing before the decision or applies to the court, through urgent proceedings if works have begun. It also monitors the permit's validity: it lapses if works have not started within three years (Article R. 424-17). Further reading: withdrawal of planning authorisation.
Urgent suspension application
Urgency
Urgent suspension application: stopping building works
Urgency is presumed when challenging a building permit.
The urgent applications judge may suspend a decision where urgency justifies it and a ground raises serious doubt as to its lawfulness (Article L. 521-1 of the Code of Administrative Justice). For a building permit or a decision not to object to a prior declaration, urgency is presumed and the application must be made before the deadline for raising new grounds before the court. For a building or development permit challenged by someone other than the State, the municipality or the intermunicipal authority, the urgent applications judge rules within one month (Article L. 600-3 of the French Planning Code).
The Council of State notes that erecting a building is difficult to reverse and that only particular circumstances rebut the presumption. A municipality that criticised neighbours for waiting just over two months after the site notice was posted failed to rebut it. The permit was suspended because the grounds alleging breaches of the local plan's distance and height rules raised serious doubt as to its lawfulness (CE, 12 October 2023, No. 473422). The urgent application accompanies the application on the merits; it does not replace it.
Building without a permit
Criminal planning law
Building without a permit: criminal proceedings
An offence (délit) punishable by a fine, which may lead to demolition.
Construction requires a building permit beforehand (Article L. 421-1 of the French Planning Code). Carrying out works without the required authorisation or in breach of it is punishable by a fine of at least €1,200, up to €6,000 per square metre of floor area built, demolished or rendered unusable, or €300,000 in other cases, and six months' imprisonment in cases of legal recidivism. The person benefiting from the works, the architect and the contractor may be prosecuted (Article L. 480-4). The court rules on compliance works or demolition in the light of observations from the mayor or the competent official (Article L. 480-5).
In 2026, the Cour de cassation reiterated that “the offence consisting in the unlawful execution of building works is committed throughout the time they are carried out, so that its commission continues until their completion” (our translation). The six-year limitation period for offences classified as délits (Article 8 of the French Code of Criminal Procedure (Code de procédure pénale)) runs from completion, whose date the court must establish. A demolition order made without the mayor or competent official having been heard or invited to submit observations is liable to be quashed (Cass. crim., 20 January 2026, No. 25-83.987). The firm, which also provides defence before the criminal court, examines possible regularisation before the hearing. Further reading: penalties, demolition and regularisation for building without a permit. The firm sets out its defence work in this area on its page on building without a permit lawyers in Paris.
Demolition and neighbours
Ordinary courts
Demolition and neighbours' claims
Demolition of a building constructed in accordance with a permit is subject to strict conditions.
Where a building was constructed in accordance with a building permit, the ordinary courts may order its owner to demolish it for breach of planning rules only if the administrative court has first annulled the permit. Except where the prefect brings the action, the building must also be in one of the zones listed by law, including the surroundings of historic monuments, designated heritage sites and areas protected by the local plan. The action must be brought within two years of the annulment becoming final (Article L. 480-13 of the French Planning Code). The neighbour must prove personal loss directly linked to the rule breached. Once that loss is established, the court “must order, unless it is impossible, demolition of the building to the extent sufficient to bring it into compliance with the planning rule breached” (our translation), regardless of the seriousness of the loss (Cass. 3e civ., 1 October 2026, No. 24-14.709, published in the Bulletin).
For a structure built without authorisation or in breach of it, the municipality may apply to the judicial court (tribunal judiciaire) for demolition or compliance works within ten years of completion (Article L. 480-14). Independently of planning rules, excessive loss of sunlight or views may also constitute an abnormal neighbourhood disturbance.
Urban pre-emption right
Pre-emption
Urban pre-emption right: challenging the town hall's decision
The decision must be based on a real project existing on the date it is taken.
A municipality with a local plan may establish an urban pre-emption right (droit de préemption urbain) (Article L. 211-1 of the French Planning Code). Any sale of property subject to this right must be preceded by a declaration of intention to sell, failing which it is void. The holder of the right has two months to decide (Article L. 213-2). The pre-emption decision must state the purpose for which the right is exercised (Article L. 210-1) and be based, at that date, on a real development project or operation, even if its precise features have not yet been settled (CE, 25 March 2026, No. 504317, concerning a property in Vincennes pre-empted by the Île-de-France public land agency). The Paris Administrative Court of Appeal upheld the annulment of a pre-emption decision that the municipality had justified solely by general policy documents: a sustainable development and planning strategy, a development guideline and a master plan (CAA Paris, 11 July 2024, No. 22PA03109).
In particular, the displaced buyer may apply to the administrative court within two months of notification or publication of the decision. If the property has not been acquired, the local authority cannot pre-empt it again for one year after annulment becomes final (Article L. 213-8). If ownership has been transferred, it must offer the property first to the former owners, then, if they decline, to the buyer named in the declaration of intention to sell (Article L. 213-11-1). Further reading: challenging a pre-emption decision.
PLU, certificate, change of planning use
Securing a project
Local plan, planning certificate and change of planning use
Applicable rules are checked, and can sometimes be fixed, before the application is filed.
A planning certificate sets out the rules applying to the land and, if it is an operational certificate, whether the proposed development is feasible. An application filed within eighteen months benefits from the rules in force on the certificate date, except for public safety or public health provisions (Article L. 410-1 of the French Planning Code). Where a new local plan (plan local d'urbanisme, PLU) is being prepared and the project could compromise its implementation or make it more expensive, the town hall may issue a reasoned decision to defer determination for up to two years (Article L. 424-1). See our article on deferring determination of a planning application.
Changing a building's planning use (changement de destination), for example converting offices into housing, requires a prior declaration (Article R. 421-17), and a building permit where the works alter load-bearing structures or the façade (Article R. 421-14). In Paris, authorisation to change the use of residential premises (changement d'usage) falls under a separate regime in the Construction and Housing Code (Code de la construction et de l’habitation), Article L. 631-7. See converting offices into housing.
Frequently asked questions
Frequently asked questions
Questions for an urban planning lawyer in Paris
Looking for an urban planning lawyer in Paris to challenge a building permit, respond to a refusal, contest pre-emption or face prosecution for building without a permit? These are the questions clients most often ask the firm.
How much does an urban planning lawyer in Paris cost?
Fees depend on the work required and the complexity of the case. An informal appeal, an administrative court application, an urgent suspension application, defending a challenged permit and a criminal court hearing require different work. The number of local plan rules to check against the project, the urgency of works about to start and whether there is an appeal also affect the cost. The firm charges a fixed fee per stage or by time spent, always recorded in a written fee agreement signed before it acts. The first step is a written analysis of your documents, priced in the form on this page. At the end of proceedings, the administrative court may order the losing party to pay a sum towards costs incurred (Article L. 761-1 of the Code of Administrative Justice). In the decisions cited on this page, these sums range from €1,500 to €3,000, without necessarily covering all legal fees.
What is the deadline for challenging a building permit in France?
A neighbour has two months from the first day of a continuous two-month period during which the permit notice is displayed on the site (Article R. 600-2 of the French Planning Code). The time limit only starts if the notice is complete and properly displayed. The Council of State holds that a notice omitting the building's height, or stating it with a substantial error, does not start the time limit where nothing else enables third parties to estimate it (CE, 25 February 2019, No. 416610). The challenge must be notified to the mayor and the permit holder by registered letter with acknowledgement of receipt within fifteen clear days of filing (Article R. 600-1). No challenge is admissible six months after completion of the building, which is presumed, unless proved otherwise, to have occurred on the date the declaration of completion was received (Article R. 600-3). Photograph the notice as soon as it appears, with a verifiable date: this is often the first document in the case.
Does an informal appeal extend the deadline for going to court?
No longer in planning matters. Since 28 November 2025, Article L. 600-12-2 of the French Planning Code provides that an informal or hierarchical appeal against a planning authorisation decision must be brought within one month, that silence for more than two months amounts to rejection, and that this appeal does not extend the time limit for court proceedings. The general rule that an administrative appeal preserves the court deadline therefore no longer applies to building permits, prior declarations or refusals. In practice, if you write to the mayor, the administrative court application must be filed within the original two-month period, without waiting for a reply. An informal appeal against a permit or non-objection decision must still be notified to the mayor and the permit holder within fifteen days (Article R. 600-1). Under the former regime, the Council of State already held that otherwise it had no effect on the time limit (CE, 28 January 2026, No. 499985).
Who can challenge a building permit in France?
Apart from the State, local authorities and associations, only someone whose property is directly affected by the project in its occupation, use or enjoyment may bring proceedings (Article L. 600-1-2 of the French Planning Code). Except in special circumstances, standing is assessed on the date the permit application was posted at the town hall (Article L. 600-1-3). The applicant must explain the alleged impact with specific, substantiated evidence, for example relating to the nature, size or location of the project. An immediate neighbour who provides such evidence will in principle have standing. The Council of State thus quashed a ruling declaring inadmissible a claim by an owner opposite an upward extension likely to create a direct view onto his terrace (CE, 18 November 2020, No. 426585). A tenant or the holder of a preliminary sale agreement may also bring proceedings. An association's claim is admissible only if its statutes were filed with the prefecture at least one year before the application was posted (Article L. 600-1-1). The court application must include the title deed or lease (Article R. 600-4).
Who can officially record a planning offence in France?
Breaches of Book IV of the French Planning Code, which governs permits and declarations in particular, are officially recorded by judicial police officers (OPJ) and judicial police agents, and by State and local authority officials and agents specifically commissioned by the mayor or minister and sworn in (Article L. 480-1 of the French Planning Code). Their reports are accepted as evidence unless proved otherwise. They can therefore be challenged using photographs, dated invoices or witness statements, particularly on the completion date of the works. When a mayor with power to issue authorisations learns of an offence, they must have an official report drawn up, with a copy sent without delay to the public prosecutor (procureur de la République). The municipality, the competent intermunicipal authority and approved environmental protection associations may exercise the rights of a civil party (partie civile). If an officer visits or you receive a summons, the firm advises you on how to respond, examines the lawfulness of the report and considers regularisation before any hearing. See also our page on building without a permit.
What are the penalties for building without a permit in France?
Carrying out works without the required permit or declaration, or in breach of the authorisation obtained, is an offence punishable by a fine of at least €1,200, up to €6,000 per square metre of floor area built, demolished or rendered unusable, or €300,000 in other cases. In cases of legal recidivism, six months' imprisonment may also be imposed (Article L. 480-4 of the French Planning Code). The criminal court also rules on compliance works, demolition or restoration after obtaining observations from the mayor or the competent official (Article L. 480-5). The Cour de cassation quashed a demolition order made without this formality (Cass. crim., 20 January 2026, No. 25-83.987). The same judgment reiterates that the limitation period runs from completion of the works, whose date the court must establish. For offences classified as délits, this period is six years (Article 8 of the French Code of Criminal Procedure). Independently of prosecution, the municipality has ten years after completion to seek demolition before the judicial court (Article L. 480-14). A building erected without the required authorisation cannot be permanently connected to electricity, water, gas or telephone networks (Article L. 111-12).
Can the town hall withdraw a building permit it has already granted?
Yes, but within narrow limits. A building permit, whether tacit or express, can only be withdrawn if unlawful and within three months of its date. After that, withdrawal is possible only at the holder's express request (Article L. 424-5 of the French Planning Code). The same article states that a new application by the same holder for the same land does not implicitly withdraw the previous permit. Withdrawal of a decision creating rights must give reasons and follow a procedure allowing the holder to respond. The holder must be able to submit written observations and, on request, oral observations, assisted by a lawyer (Article L. 121-1 and Article L. 122-1 of the Code of Relations between the Public and the Administration). If you receive a letter announcing withdrawal, the response deadline is short. The firm checks the exact permit date and whether the alleged unlawfulness is established, then prepares written observations. An unlawful withdrawal can be challenged before the administrative court, with a suspension application if works are under way.
What can I do if my building permit is refused in France?
The refusal must state all its reasons (Article L. 424-3 of the French Planning Code). Start by checking each one against the local plan. The refusal can be challenged before the administrative court within two months of notification (Article R. 421-1 of the Code of Administrative Justice). An informal appeal no longer extends that period (Article L. 600-12-2). Since 28 November 2025, the town hall can no longer introduce a new ground more than two months after the challenge was registered (Article L. 600-2). If the court dismisses all the grounds, it must, at your request, order the authority to issue the permit, unless applicable rules or a change in circumstances prevent this (CE, opinion, 25 May 2018, No. 417350). In Paris, for a building with more than two dwellings, the court rules at first and last instance on challenges lodged until 31 December 2027 (Article R. 811-1-1 of the Code of Administrative Justice). Filing a revised application is sometimes faster: the firm compares the two routes with you.
How can I challenge the town hall's pre-emption decision?
In particular, the displaced buyer may apply to the administrative court within two months of notification or publication of the decision. The court first checks that the decision states the purpose for which the right is exercised (Article L. 210-1 of the French Planning Code), then that the local authority had a real development project or operation at the date of pre-emption, even if its precise features had not been defined (CE, 25 March 2026, No. 504317). The Paris Administrative Court of Appeal thus upheld the annulment of a pre-emption decision that the municipality had justified solely by general policy documents (CAA Paris, 11 July 2024, No. 22PA03109). The municipality's two-month deadline following the declaration of intention to sell, and the lawfulness of its request for documents, are also checked (Article L. 213-2). If the property has not been acquired, the authority cannot pre-empt it again for one year after annulment becomes final (Article L. 213-8). If ownership has been transferred, it must offer the property first to the former owners, then, if they decline, to the buyer named in the declaration of intention to sell (Article L. 213-11-1).
Can a neighbour obtain demolition of a building constructed under a permit?
The ordinary courts may order demolition of a building constructed in accordance with a permit for breach of planning rules only if the administrative court has first annulled that permit. Except where the prefect brings the action, it must also be in one of the zones listed by law (Article L. 480-13 of the French Planning Code). These include listed or registered sites, designated heritage sites, the surroundings of historic monuments and areas designated by the local plan for their heritage or ecological value. The action must be brought within two years of the annulment becoming final. The neighbour must also prove personal loss caused by the breach of the rule itself, rather than by the mere presence of the building. Where that loss is established, the Cour de cassation holds that the court must order demolition, unless impossible, to the extent sufficient to restore compliance, regardless of the seriousness of the loss (Cass. 3e civ., 1 October 2026, No. 24-14.709). In any zone, the builder may be ordered to pay damages if the administrative court has annulled the permit or established its unlawfulness. That action must be brought within two years of completion of the works. An abnormal neighbourhood disturbance claim remains available independently of planning rules.
Our method
The same method for every case
The firm appears before the Paris Administrative Court, the administrative courts of the Paris region and the Paris Administrative Court of Appeal, and before the criminal court or judicial court where the case requires it. Hassan Kohen personally reviews the documents you send and agrees a strategy with you before any procedural step: an informal appeal alongside a court application, a court application alone, an urgent suspension application, negotiation with the applicant or defence of the permit.
The first steps are always the same: establish the date of posting or notification, calculate the time limits still open, and read the permit file and applicable local plan. The firm then proposes a route, explains the expected timeframes and costs, and records the engagement in a written fee agreement. You can also send your documents through the form at the bottom of the page to receive a first written analysis.
First appointment
Your first step with the firm
Call the firm or send your documents through the form at the bottom of this page. Hassan Kohen reviews them personally and sends you a first written analysis. In planning matters, send the decision concerned and a dated photograph of the site notice first: these allow the time limits to be calculated. Appointments take place at the office in Paris 16 or by video.
Explore our expertise in planning law
lawyer
Challenging a neighbour's permit
Paris
lawyer
Informal appeal
Paris
lawyer
Building permit refusal
Paris
lawyer
Prior declaration
Paris
lawyer
Defending a challenged permit
Paris
lawyer
Permit withdrawal
Paris
lawyer
Urgent suspension application
Paris
lawyer
Building without a permit
Paris
lawyer
Demolition
Paris
lawyer
Urban pre-emption right
Paris
lawyer
Local plan
Paris
lawyer
Change of planning use
Paris