KOHEN AVOCATS FIRM · PARIS 16
French SPANC Penalty for a Missed Septic Inspection or Unfinished Works: How to Challenge It From Abroad

Hassan KOHEN acts in urgent matters, from the police station to the assize court. Initial strategic analysis: €80 incl. VAT, personal reply within 24 hours.

100% confidential · Legal professional privilege · No obligation

Article generated by artificial intelligence, through a process designed and supervised by the firm

Source: French Court of Cassation – Judilibre and Légifrance open data

Paris Bar Police custody, investigation, assize court CNB listing avocat.fr
Maître Hassan KOHEN, avocat au Barreau de Paris
Hassan KOHEN
Attorney at the Paris Bar

French SPANC Penalty for a Missed Septic Inspection or Unfinished Works: How to Challenge It From Abroad

Speak to a lawyer 06 89 11 34 45

You live in London, Boston or Melbourne and own a house in the French countryside that is not connected to the mains sewer. A letter forwarded by a neighbour, or a debit on your French account, tells you that the local septic inspection service has billed you a penalty (pénalité), sometimes double the usual amount or more. The service is the SPANC (service public d’assainissement non collectif), the public body that every commune must run to inspect septic tanks and other private wastewater systems. It usually bills for one of two reasons: its inspector could not visit while you were away, or the works listed in an earlier inspection report were never carried out. Under Article L1331-8 of the French Public Health Code (Code de la santé publique), the owner who has not met these obligations pays a sum at least equal to the normal fee, which the council may increase by up to 400 %. Act quickly. First, find out whether the bill is the ordinary inspection fee (redevance) or a penalty, because the two do not go before the same court. Next, note the day you received it: under Article L1617-5 of the General Code of Local Authorities (Code général des collectivités territoriales, or CGCT), the action to contest a local authority’s bill on the merits must be brought within two months of receiving it. Finally, offer the service a date for the inspection, or start the works, without waiting for the outcome. This article explains what the SPANC may charge, how French courts have ruled on these penalties in 2025 and 2026, and how an owner who lives abroad can challenge the bill.

I. Why did the SPANC bill me while I was abroad, and how much can it charge?

A. The inspection visit you missed: when does silence count as an obstacle?

Every house that is not connected to the public sewer must have its own treatment system, which French law calls non-collective sanitation (assainissement non collectif): a septic tank (fosse septique), an all-waste tank, a micro treatment plant or a reed-bed filter. The commune, or the group of communes (communauté de communes) to which it has transferred the task, must inspect these systems. Article L2224-8 III CGCT provides that for existing systems the inspection consists of a check of their operation and maintenance, at the end of which the commune issues a document listing the works needed to remove dangers to health and proven risks of pollution. The same article says that after the first round of inspections, the commune carries them out « selon une périodicité qui ne peut pas excéder dix ans » (in English: at intervals that may not exceed ten years). Many owners who bought a house fifteen or twenty years ago therefore receive a new inspection request long after the original purchase, often at the French address where nobody is there to read it.

The inspector needs to come onto your land, lift the lids and look at the tank and the drainage field. The law gives the service a right of access. Article L1331-11 of the Public Health Code provides that the agents of the sanitation service have access to private property to carry out the inspection of non-collective systems, and its last paragraph sets the sanction: when an obstacle is put in the way of that mission, « l’occupant est astreint au paiement de la somme définie à l’article L. 1331-8 » (in English: the occupant is required to pay the sum defined in Article L1331-8). In other words, the penalty for refusing or preventing the visit is the same sum as the penalty for not complying with the sanitation obligations, which we examine below.

The visit cannot be imposed overnight. The ministerial order of 27 April 2012 on the conduct of these inspections (arrêté du 27 avril 2012 relatif aux modalités de l’exécution de la mission de contrôle des installations d’assainissement non collectif) sets the notice rule in its Article 6: access to the property « doit être précédé d’un avis de visite notifié au propriétaire de l’immeuble et, le cas échéant, à l’occupant » (in English: must be preceded by a notice of visit served on the owner of the building and, where applicable, on the occupant), within a period set by the service regulations « et qui ne peut être inférieur à sept jours ouvrés » (in English: which may not be shorter than seven working days). Each SPANC also adopts service regulations (règlement de service), which Article L2224-12 CGCT requires for every water and sanitation service, defining the obligations of the operator, the users and the owners. Under Article 7 of the 2012 order, those regulations must state how often inspections take place, how the owner or occupant is informed, how appointments are made and how the user can contest the inspection report. If you are facing a penalty, the regulations of your SPANC are the first document to obtain, because they often define what counts as a refusal.

That definition matters a great deal to an owner who is abroad, because French courts do not require a door slammed in the inspector’s face. Silence can be enough. In a judgment of 7 May 2026, the Strasbourg administrative court (tribunal administratif, cases 2400786 and 2400787) upheld two bills totalling more than 6,500 euros sent to a property company that had never answered the service’s repeated requests for an appointment between 2008 and 2014. The court held that this lack of response had prevented the inspection, so that the penalty was lawful, and it added that the appointment finally accepted in 2023 changed nothing for the earlier period. That case arose from the check of a new building’s sanitary installations under the provisions on connections to the public sewer, but the court applied the same two articles, L1331-11 and L1331-8, that govern septic inspections.

The Caen administrative court, in a judgment of 20 October 2026 (cases 2302272 and 2502693), went the same way in a pure septic case. The owner of two systems in Normandy had received registered letters warning him that if he did not book an appointment within one month, his attitude would be treated as an obstacle to the inspection and a penalty of 365.20 euros would be charged for each inspection not carried out. He did not book. He explained that he had telephoned the service to say the inspections were pointless because he could not afford to bring his systems up to standard. The court held that this argument had no bearing on the legality of the bills and that, by refusing to make an appointment, he had prevented the service from carrying out its mission. The three penalties were upheld.

The judgment of the Rouen administrative court of 19 September 2025 (case 2401403) shows what local regulations may say. The regulations of the service concerned treated as a refusal both an express refusal and the impossibility of gaining access despite the notice procedure, and provided that the refusal would be notified by registered letter. In that case the owners, two property companies, had written back to say that no appointment would be set and that the inspector would not have access, which the court treated as an express refusal. The SPANC cannot force its way in by itself. In the same dispute it asked a court for permission to enter with a bailiff and, if necessary, the police, and the Rouen court of appeal, in a ruling of 6 November 2025 (case 25/00800), held that such a request belonged to the administrative courts, because the inspection mission « procède de l’activité de contrôle de la salubrité publique de la commune et relève ainsi des prérogatives de puissance publique » (in English: stems from the commune’s public-health control activity and therefore falls within the prerogatives of public authority).

For an owner who lives abroad, three practical consequences follow. The first is that you are better off giving the SPANC, and the public accountant who collects its bills, a postal address where you actually receive mail, together with an email address. Article L1617-5 4° CGCT provides that « L’envoi sous pli simple ou par voie électronique au redevable de cette ampliation à l’adresse qu’il a lui-même fait connaître à la collectivité territoriale, à l’établissement public local ou au comptable public vaut notification de ladite ampliation » (in English: sending the copy of the bill by ordinary post or electronically to the debtor, at the address the debtor gave to the local authority, the local public body or the public accountant, counts as notification of that copy). If the only address you ever gave is the French house, a letter left in its mailbox can start the clock. The second is that a reply in writing, even a short one, changes the picture: an owner who answers the visit notice, explains the absence abroad and offers dates or names a neighbour who holds the keys is not in the position of the owners in Strasbourg and Caen, who simply did not respond. The third concerns rented houses. The text names the occupant (l’occupant) as the person who pays when an obstacle is put in the way of the visit, and the decisions read for this article all concerned owners who had themselves failed to respond. If your tenant refused the inspector, that wording is an argument to raise, but none of these decisions rules on it.

One more distinction is useful at this stage. The ordinary inspection fee is not a penalty. It is the price of the service, set by the council, and Article 7 h of the 2012 order requires that its amount be announced in advance: « Le montant de cette dernière doit leur être communiqué avant chaque contrôle » (in English: its amount must be communicated to users before each inspection). In a judgment of 18 November 2025, the Mulhouse court of first instance (tribunal judiciaire, case 25/00728) cancelled an inspection bill of 137.50 euros because the service could not show that its rates had been brought to the owner’s attention, and held that it « ne peut exiger le paiement d’une redevance dont le montant n’a pas été préalablement porté à la connaissance de l’usager » (in English: cannot demand payment of a fee whose amount was not previously brought to the user’s attention). Small as it is, that ruling illustrates a point owners often miss: the fee and the penalty follow different rules and, as Part II explains, are heard by different courts.

B. The works you did not do: the four-year clock, the 400 % ceiling and the twelve-month window

The second source of penalties is the inspection report itself. At the end of the visit, the SPANC sends the owner a visit report (rapport de visite), and the law then obliges the owner to act on it. Article L1331-1-1 II of the Public Health Code provides: « Le propriétaire fait procéder aux travaux prescrits par le document établi à l’issue du contrôle prévu au III de l’article L. 2224-8 du code général des collectivités territoriales, dans un délai de quatre ans suivant la notification de ce document » (in English: the owner has the works prescribed by the document issued after the inspection carried out, within four years of the notification of that document). The same article, in its first paragraph, also requires the owner to maintain the system regularly and to have it emptied periodically by an approved contractor.

Not every non-compliant report starts that four-year clock in the same way. Article 4 of the 2012 order sorts non-compliant existing systems into three categories: a) systems presenting dangers to people’s health, b) systems presenting a proven risk of pollution of the environment, and c) systems that are incomplete, significantly undersized or affected by major malfunctions. It then states: « Pour les cas de non-conformité prévus aux a et b de l’alinéa précédent, la commune précise les travaux nécessaires, à réaliser sous quatre ans » (in English: for the non-compliance cases in a and b of the previous paragraph, the commune specifies the necessary works, to be carried out within four years). For category c, the text only says that the commune identifies the works needed to bring the system into compliance. A sale changes the timetable for all three categories, since the same article provides: « En cas de vente immobilière, dans les cas de non-conformité prévus aux a, b et c, les travaux sont réalisés au plus tard dans un délai d’un an après la signature de l’acte de vente » (in English: in the event of a property sale, in the non-compliance cases in a, b and c, the works are carried out no later than one year after the signing of the deed of sale). The category ticked on your report is therefore the first thing to check. The decisions read here do not say whether a penalty can be charged, outside a sale, for works identified in a category c report.

The starting point of the four-year period is the notification of the report, not the date of the visit. Article 5 of the 2012 order says so expressly: « Le délai de réalisation des travaux demandés au propriétaire de l’installation par la commune court à compter de la date de notification du document établi par la commune qui liste les travaux » (in English: the period for carrying out the works requested from the owner runs from the date of notification of the document issued by the commune listing the works). The same article adds that the mayor may shorten that period according to the seriousness of the risk, under the mayor’s general police powers, and that the owner submits proposed works to the commune, which examines the design when the works amount to a rehabilitation of the system and then carries out a follow-up visit (contre-visite) before the trench is backfilled. For an owner abroad, this means the works cannot simply be ordered from a local contractor and forgotten: the project has to go through the SPANC, and the follow-up visit has to take place, otherwise the file stays open.

Once the deadline has passed without works, the penalty of Article L1331-8 of the Public Health Code can be charged. Its wording is the key to the amount. As long as the owner has not complied, the owner must pay a sum at least equal to the fee that would have been due for a compliant system, « et qui peut être majorée dans une proportion fixée par le conseil municipal ou le conseil de la métropole de Lyon dans la limite de 400 % » (in English: which may be increased in a proportion set by the municipal council, or the council of the Lyon metropolitan area, up to a limit of 400 %). Two features of this text deserve attention. The penalty is not a one-off fine: the words « Tant que le propriétaire ne s’est pas conformé » (as long as the owner has not complied) mean it can be billed again for each period of non-compliance. In the case decided by the Nîmes administrative court on 17 September 2026 (case 2501890), for instance, the service had issued one bill for 2024 and another for 2025. And the rate is not fixed by law but by the local council: Article L2224-12-2 CGCT provides that the rules on sanitation fees and on the sums provided for by Articles L1331-1 to L1331-10 of the Public Health Code are set by a deliberation of the council concerned. The deliberation actually adopted in your area, not the legal ceiling, determines what you owe.

The ceiling has also changed over time. The version of Article L1331-8 in force since 25 August 2021 sets it at 400 %, but several recent decisions still quote the earlier wording, which capped the increase at 100 %: this is the case of the Rouen court of appeal ruling of 6 November 2025 cited above, of the Caen judgment of 20 October 2026, and of the Strasbourg judgment of 7 May 2026, which applied an increase of 100 % charged from 2014. If your bill covers years before and after August 2021, check which ceiling and which local deliberation were applied to each period.

The current version of Article L1331-8 of the Public Health Code also contains a sentence that owners rarely hear about: « Cette somme n’est pas recouvrée si les obligations de raccordement prévues aux mêmes articles L. 1331-1 à L. 1331-7-1 sont satisfaites dans un délai de douze mois à compter de la date d’envoi de la notification de la pénalité » (in English: this sum is not recovered if the connection obligations provided for in Articles L1331-1 to L1331-7-1 are met within twelve months of the date on which notification of the penalty was sent). The sentence speaks of connection obligations (obligations de raccordement), a term that fits the connection of a house to the public sewer more naturally than the upgrade of a septic tank, and none of the decisions read for this article applied it to a septic upgrade or to a penalty for obstructing an inspection. Whether it protects you is therefore an open question. What is certain is that carrying out the works and obtaining the follow-up visit within twelve months of the penalty notice puts you in the best position to argue it, and stops further penalties from accruing.

The courts have also traced the limits of the penalty for unfinished works. In the Nîmes case, the owner of a house in the Gard had been told by letter of 27 February 2023 that her system was non-compliant and that she had four years from that notification to carry out the works. The service nonetheless billed her 240 euros for 2024 and again for 2025. The court cancelled both bills because they had been issued before the four-year period had expired, and it refused to let the service rely on an earlier report of 2019 that required works only in the event of a sale. Conversely, the Nancy administrative court, by an order of 20 June 2025 (case 2403551), rejected the claim of an owner who argued only that her system had always worked well and had never caused any smell or pollution: against a penalty charged for not carrying out the works required after a 2019 inspection, those circumstances had no bearing. A penalty is not the end of the matter either. Article L1331-6 of the Public Health Code allows the commune, when the owner fails to meet the sanitation obligations, to act « après mise en demeure » and to « procéder d’office et aux frais de l’intéressé aux travaux indispensables » (in English: after formal notice, to carry out the essential works itself at the expense of the person concerned). A formal notice (mise en demeure) received at your French address should therefore never be left unanswered.

Owners who are thinking of selling face a further constraint. Article L1331-11-1 of the Public Health Code requires the inspection report, dated less than three years before the signing of the deed, to be attached to the technical file handed to the buyer, and provides that if the last inspection is more than three years old or does not exist, the new one is at the seller’s expense. A penalty dispute that drags on can therefore delay a sale, and a report that you consider wrong will be read by every prospective buyer. Our guide on how buyers renegotiate a French house whose septic report has failed describes that side of the transaction. When the dispute concerns the inspection report or the penalty itself, the case is one of public law, and an administrative lawyer in Paris used to disputes with communes and their public services can check the report, the local deliberation and the bill before the time limits discussed in Part II expire.

II. How do I contest a SPANC penalty from abroad?

A. Which French court: the inspection fee, the penalty and the report do not go to the same judge

The first trap is the choice of court. French law splits disputes between the ordinary courts (juridictions judiciaires), headed by the Cour de cassation, and the administrative courts (juridictions administratives), headed by the Conseil d’État. Sanitation services sit on the boundary. Article L2224-11 CGCT provides: « Les services publics d’eau et d’assainissement sont financièrement gérés comme des services à caractère industriel et commercial » (in English: public water and sanitation services are financially managed as services of an industrial and commercial nature). For services of that kind, the Tribunal des conflits, the court that settles disputes over jurisdiction between the two orders, ruled on 3 July 2017 in a case about a SPANC (decision C4090) that « les litiges individuels nés des rapports entre un service public industriel et commercial et ses usagers, qui sont des rapports de droit privé, relèvent de la compétence des juridictions judiciaires ; qu’il n’en va autrement que pour les litiges relatifs à celles de ses activités qui, telles la réglementation, la police ou le contrôle, se rattachent, par leur nature, à des prérogatives de puissance publique » (in English: individual disputes arising from relations between an industrial and commercial public service and its users, which are private-law relations, fall within the jurisdiction of the ordinary courts; it is otherwise only for disputes concerning those of its activities which, like regulation, policing or control, are by their nature linked to prerogatives of public authority).

Applied to septic tanks, this principle produces a split that the 2025 and 2026 decisions make fairly clear. The ordinary inspection fee is the price of a service rendered: the Strasbourg administrative court, on 10 March 2025 (case 2307450), declined jurisdiction over a bill for the initial inspection fee, holding that it remunerated a service rendered to the user of an industrial and commercial public service, and the owner then won before the Mulhouse court of first instance, as described above. The inspection report and the penalty, by contrast, belong to the administrative courts. On 2 June 2026, the pre-trial judge of the Limoges court of first instance (case 26/00123) held that a challenge to a SPANC non-compliance notice fell outside the ordinary courts, reasoning that Article L1331-8 « confère aux communes, dans le cadre de leur mission de contrôle des installations d’assainissement non collectif, le pouvoir de sanctionner les propriétaires » who do not carry out the prescribed works (in English: gives communes, as part of their mission of inspecting non-collective sanitation systems, the power to sanction owners), and that this was a prerogative of public authority. The penalty bills in the Strasbourg, Caen, Rouen, Nîmes and Nancy cases were all examined on the merits by administrative courts, and the Rouen judgment of 19 September 2025 records that the owners had first gone to the enforcement judge of an ordinary court, who declined jurisdiction.

Two qualifications complete the picture. The first concerns compensation. In the 2017 case, the Tribunal des conflits held that a soil study carried out by the public body in charge of non-collective sanitation at the owner’s request, in the extension of its public service mission, did not involve prerogatives of public authority, so that the claim for damages belonged to the ordinary courts. A claim that a report requested for a sale was negligently drawn up may therefore follow a different route from a challenge to a penalty. The second concerns the nature of the sums. Article L1331-9 of the Public Health Code provides that the sums due by the owner under Articles L1331-2, L1331-3 and L1331-6 to L1331-8 are recovered as in matters of direct taxes and adds: « Les réclamations sont présentées et jugées comme en matière de contributions directes » (in English: claims are presented and decided as in matters of direct taxes). The decisions read for this article did not discuss that sentence; they reviewed the penalty bills as executory titles issued by a local authority. Because the penalty is collected by the public accountant (comptable public) of the Treasury and follows the logic of tax collection, a tax lawyer in Paris who handles disputes over public debts and their collection is often the right person to read the bill alongside the administrative-law questions.

A further distinction separates the challenge to the debt from the challenge to its collection. Once the bill is unpaid, the public accountant sends reminders and formal demands and may seize a bank account. Article L281 of the Book of Tax Procedures (Livre des procédures fiscales), to which Article L1617-5 CGCT refers for this stage, provides that disputes over collection must be addressed to the administration on which the accountant depends, and that they « ne peuvent pas remettre en cause le bien-fondé de la créance » (in English: may not call into question whether the debt is well founded). The Cour de cassation applied this rule to a sanitation fee in a ruling of 11 October 2023 (Commercial Chamber, appeal 22-10.795, published in the Bulletin). An owner whose account had been seized had sued the metropolitan authority to recover the money, arguing that the debt was time-barred. The Court held that « le comptable public est seul chargé du recouvrement des ordres de recouvrer et des créances constatées par un contrat, un titre de propriété ou tout autre titre exécutoire » (in English: the public accountant alone is responsible for collecting orders to recover and debts established by a contract, a title of ownership or any other executory title), and declared the claim inadmissible because the accountant had not been sued. Arguing that a SPANC bill is unfounded and arguing that its collection is irregular are therefore two different actions, against two different parties.

B. The time limits, the arguments that win and the steps to take from abroad

The most important date is the day you received the bill, which usually takes the form of a notice of sums payable (avis des sommes à payer) based on a revenue title (titre de recettes). Under Article L1617-5 1° CGCT, the debtor’s action to contest the merits of a debt assessed and liquidated by a local authority « se prescrit dans le délai de deux mois à compter de la réception du titre exécutoire ou, à défaut, du premier acte procédant de ce titre ou de la notification d’un acte de poursuite » (in English: is time-barred two months after receipt of the executory title or, failing that, of the first act based on that title or of the notification of an act of enforcement). The same paragraph adds that bringing that challenge before a court « suspend la force exécutoire du titre » (in English: suspends the enforceability of the title), which is what stops the collection while the dispute is pending. For bills issued by an administrative authority, Article R421-1 of the Code of Administrative Justice (Code de justice administrative) also sets the general rule that the administrative court is seised by an action against a decision within two months of its notification.

Owners abroad naturally ask whether they get extra time. Article R421-7 of the Code of Administrative Justice provides that the time limit in Article R421-1 is « augmenté de deux mois pour les personnes qui demeurent à l’étranger » (in English: extended by two months for persons who live abroad). That provision refers to the Article R421-1 time limit, and none of the decisions read for this article says whether it also extends the two-month period of Article L1617-5 for a challenge to a local authority’s bill. The safe course is to act within two months of receipt, without counting on the extension.

The two-month period only runs if the bill tells you how to contest it. Article R421-5 of the Code of Administrative Justice provides: « Les délais de recours contre une décision administrative ne sont opposables qu’à la condition d’avoir été mentionnés, ainsi que les voies de recours, dans la notification de la décision » (in English: time limits for challenging an administrative decision can only be relied on if they were mentioned, together with the means of challenge, in the notification of the decision). Article L1617-5 4° CGCT likewise requires the bill to state « les voies et délais de recours » (the means and time limits for challenging it). That protection is not unlimited. In its decision of 9 March 2018 (Conseil d’État, case 401386), the Conseil d’État held: « S’agissant des titres exécutoires, sauf circonstances particulières dont se prévaudrait son destinataire, le délai raisonnable ne saurait excéder un an à compter de la date à laquelle le titre, ou à défaut, le premier acte procédant de ce titre ou un acte de poursuite a été notifié au débiteur ou porté à sa connaissance » (in English: as regards executory titles, save for special circumstances relied on by the person concerned, the reasonable time limit may not exceed one year from the date on which the title, or failing that the first act based on it or an act of enforcement, was notified to the debtor or came to the debtor’s knowledge). The same decision states that a debtor who goes to the ordinary courts when the administrative courts had jurisdiction keeps the benefit of that reasonable period if the action was brought before it expired, and that a new two-month period runs from the notification of the judgment by which the ordinary court declined jurisdiction. Going to the wrong court is therefore not always fatal, provided you were within time when you did so.

Two further points about time limits come from the 2025 and 2026 judgments. In the Rouen case of 19 September 2025, the court held that the owners’ administrative appeal to the issuing authority (recours gracieux) had extended the time limit until it was rejected, and that their action before the wrong court, brought within time, had preserved their right to go to the administrative court afterwards. In the Nîmes case of 17 September 2026, the court held that it was for the administration to prove the date on which the bills had been notified, and that, without such proof, the owner’s action could not be treated as out of time. An owner who cannot say exactly when a letter reached the French house is therefore not automatically barred, but the burden of the argument shifts quickly once the service produces a signed acknowledgment of receipt.

On the merits, the decisions show which arguments succeed and which fail. Formal defects come first. The Rouen administrative court cancelled two penalty bills on 19 September 2025 because they merely stated that they recovered 52 euros for a refusal of inspection in 2022, without stating how that amount had been calculated or referring to the letters that explained it. The requirement comes from Article 24 of the decree of 7 November 2012 on public budget and accounting management (décret n° 2012-1246): « Toute créance liquidée faisant l’objet d’une déclaration ou d’un ordre de recouvrer indique les bases de la liquidation » (in English: every liquidated debt that is the subject of a declaration or an order to recover states the basis of its calculation). By contrast, in the Strasbourg case of 7 May 2026, the same argument failed because the annexes attached to the bills gave the period, the volume of water, the rate and the amounts. The bill must also name its author: Article L1617-5 4° CGCT requires it to state the name, first name and position of the person who issued it, and in the Rouen case the authority defeated that argument by producing the summary list of titles (bordereau) signed by its president. The same judgment also shows the limit of arguments based on notification: it held that the way a decision is notified has no bearing on its legality, so that a bill sent to a wrong address may escape the time limit but is not cancelled for that reason alone.

Substantive arguments come next. A penalty for unfinished works cannot be charged before the four-year period has run from the notification of the report, as the Nîmes court held, and it cannot rest on a report that required works only in the event of a sale. A penalty for obstruction needs an obstacle: the cases where owners lost involved repeated unanswered letters (Strasbourg), registered letters announcing the consequence of silence (Caen) or an express written refusal (Rouen). An owner who answered every letter, offered dates, explained the absence or appointed someone to open the gate is in a different situation, even though no decision read here rules on that precise case. Some arguments are clearly weak: the Caen court rejected the owner’s inability to pay for the works, and the Nancy court rejected the claim that the system had always worked well. The local deliberation must also exist and cover the rate applied, since Article L2224-12-2 CGCT makes the council’s deliberation the source of these rules. Finally, the fee and the penalty must not be confused: if what you received is the inspection fee, the questions are whether the rate was announced in advance, as required by Article 7 h of the 2012 order, and whether the visit actually took place, and the competent court is the ordinary court.

Old bills raise a last question. Article L1617-5 3° CGCT provides that the action of the public accountants who collect the debts of communes and local public bodies « se prescrit par quatre ans à compter de la prise en charge du titre de recettes » (in English: is time-barred four years after the revenue title is taken over for collection), and that this period is interrupted by any acknowledgment by the debtor and by any interruptive act. A limitation argument of that kind concerns collection, so it must be directed at the accountant’s administration under Article L281 of the Book of Tax Procedures, as the Cour de cassation ruling of 11 October 2023 shows.

For an owner who lives in the United States, the United Kingdom, Canada or Australia, the steps can be organised from abroad, in this order.

  1. Write down the date on which the bill reached you, or the date on which you learned of it, and keep the envelope, the email or the message from the person who forwarded it.
  2. Identify what you have received: an inspection fee, a penalty for obstruction, a penalty for unfinished works, a formal notice before works ordered by the commune, or a reminder or seizure by the public accountant. The heading of the bill and the article of law it cites usually tell you.
  3. Ask the SPANC in writing for its service regulations, the deliberation that sets the rates and the increase, the visit notices it says it sent and the proof of their dispatch, and the inspection report with its category of non-compliance.
  4. Answer the service at once in writing: give your address abroad and an email address, explain your absence, and either propose dates for the inspection or name a person in France who can give the inspector access. If works are required, send the design proposal and ask for the follow-up visit, as provided by Article 5 of the 2012 order.
  5. Within two months of receipt, as Article L1617-5 CGCT requires, file your challenge with the court indicated on the bill, or first send an administrative appeal to the issuing authority if the bill offers that route, keeping proof of the date. If the bill gives no means or time limits for challenge, the one-year limit set by the Conseil d’État in 2018 still applies.
  6. If the accountant is already enforcing the bill, address any dispute about the regularity of collection or the limitation of the debt to the accountant’s administration, separately from the challenge to the debt itself.

Throughout, keep in mind that paying the bill does not settle the underlying obligation. The inspection still has to take place and the works still have to be done, because the penalty is charged for as long as the owner has not complied, under Article L1331-8, and the commune keeps the power to carry out the essential works itself after formal notice, under Article L1331-6. Challenging a penalty that was wrongly charged and putting the system in order are two parallel tasks, and an owner who does only the first may receive a new bill the following year.

Conclusion

A SPANC penalty is a small sum compared with a property tax reassessment, but it often reaches owners who live abroad through a letter left in an empty mailbox, it can be charged again for each period of non-compliance, and its ceiling has risen to 400 % of the fee in the version of Article L1331-8 in force since 25 August 2021. The decisions examined here draw a clear line. Owners lose when they ignore repeated letters, when they refuse the visit in writing, or when they let the four-year deadline after a danger or pollution report pass without works, and arguments based on the cost of the works or on a system that seems to work well do not help them. Owners win when the bill does not state how it was calculated, when the penalty is charged before the four-year period has expired, when it rests on a report that required works only on a sale, or when the inspection fee was never announced in advance. The procedure matters as much as the substance: the inspection fee goes to the ordinary courts, while the report and the penalty go to the administrative courts; the challenge must be brought within two months of receipt when the bill states the means and time limits, and within one year at most when it does not; and disputes over collection are directed at the public accountant. An owner abroad who keeps an address on file, answers every notice and acts within those time limits keeps every chance of having an unfounded penalty cancelled and of bringing the house into line on their own terms.

📄 Official circular