KOHEN AVOCATS FIRM · PARIS 16
French Town Hall Safety Order on Your House (Arrêté de Mise en Sécurité): How to Respond and Challenge It From Abroad

Hassan KOHEN acts in urgent matters, from the police station to the assize court. Initial strategic analysis: €80 incl. VAT, personal reply within 24 hours.

100% confidential · Legal professional privilege · No obligation

Article generated by artificial intelligence, through a process designed and supervised by the firm

Source: French Court of Cassation – Judilibre and Légifrance open data

Paris Bar Police custody, investigation, assize court CNB listing avocat.fr
Maître Hassan KOHEN, avocat au Barreau de Paris
Hassan KOHEN
Attorney at the Paris Bar

French Town Hall Safety Order on Your House (Arrêté de Mise en Sécurité): How to Respond and Challenge It From Abroad

Speak to a lawyer 06 89 11 34 45

You live in London, Sydney or Chicago, and the stone house you own or inherited in a French village is empty most of the year. A neighbour sends you a photo of a notice on the door, or a registered letter from the town hall (the mairie) reaches you weeks late: a wall is bulging or the roof is unsafe, and the mayor announces an arrêté de mise en sécurité, a safety order requiring works, sometimes demolition, within a deadline. Many people still call it an arrêté de péril, a “danger order”.

The procedure runs whether or not you are in France. Before the order is signed, you must be invited to comment within a period that, under article R. 511-3 of the Construction and Housing Code, cannot be shorter than one month. Once the order is made, the deadline for the works cannot be shorter than one month from its notification, except in an emergency, under article R. 511-6 of the same code. Then comes a daily penalty of up to €1,000 under article L. 511-15, and works done at your expense. To challenge the order in court, you have two months under article R. 421-1 of the Code of Administrative Justice, plus two months for people living abroad under article R. 421-7.

So note the date you received each document, answer in writing within the period stated, and have a structural engineer inspect the building before deciding whether to do the works, negotiate their scope or go to court. Part I covers what the mayor can order; Part II covers challenging the order and the bill from abroad.

I. French town hall safety order (arrêté de mise en sécurité): what the mayor can order and what you must do before the deadline

A. Letter from the mairie about a dangerous building: the procedure, the one-month window for observations and how notice reaches you abroad

The rules are in a single chapter of the Code de la construction et de l’habitation (Construction and Housing Code, abbreviated CCH). Article L. 511-1 creates what the code calls a police of building safety and health, meaning an administrative power to impose measures on owners. Article L. 511-2 lists the situations it covers. The one that concerns most owners of old houses is the first: « Les risques présentés par les murs, bâtiments ou édifices quelconques qui n’offrent pas les garanties de solidité nécessaires au maintien de la sécurité des occupants ou des tiers » (the risks presented by walls, buildings or any structures that do not offer the guarantees of solidity needed to keep occupants or third parties safe). The other situations concern defective common equipment in blocks of flats, the storage of explosive or flammable materials, and insalubrity (unfit housing conditions).

The danger does not have to threaten the occupants. A house that nobody lives in can still be the subject of an order if it threatens passers-by, a neighbour’s house or the road. That is why empty second homes, inherited village houses and barns are exposed to these procedures: the damage progresses unseen, and the first person to notice it is often a neighbour or the mayor’s technical services.

Who decides depends on the danger. Under article L. 511-4 of the CCH, the mayor is the competent authority for structural danger, while the prefect (the State’s representative in the département) deals with insalubrity. In some areas, the mayor’s powers have been transferred to the president of an inter-municipal body, so the letter may come from a métropole or a communauté de communes rather than from the town hall itself.

The danger is recorded in a report. Under article L. 511-8 of the CCH, structural danger is established by a report from the municipal or inter-municipal services, or by an expert appointed by the administrative court. That appointment is provided for by article L. 511-9: the authority may ask the administrative court to appoint an expert, who must give an opinion within twenty-four hours of being appointed. If that expert finds an imminent danger, the authority switches to the emergency procedure described below.

Outside emergencies, the order can only be made after an exchange with the owner. Article L. 511-10 of the CCH requires a procédure contradictoire (an adversarial procedure, in which you are heard before the decision) with the person who will have to carry out the measures: the owner or the holder of property rights, as recorded in the land registry (fichier immobilier). When only the common parts of a building in co-ownership are concerned, the procedure is conducted with the owners’ association, represented by its managing agent (syndic). The detail is in article R. 511-3: the authority must tell you why it is considering using its powers and which measures it intends to impose, make the report available to you, and you are « invitées à présenter leurs observations dans un délai qui ne peut être inférieur à un mois » (invited to present observations within a period that cannot be shorter than one month). For common parts of a co-ownership, article R. 511-10 gives the syndic at least two months from the date it received the information.

This step matters because the courts treat it as a real guarantee for the owner. In a case decided under the texts in force before 2021, which already required owners to be invited to comment, the Nantes Administrative Court of Appeal found that neither the managing agent nor two co-owners had been invited to submit observations, and held that they had been « privés de la garantie tenant à la mise en œuvre, à leur égard, de la procédure contradictoire » (deprived of the guarantee consisting in the adversarial procedure being applied to them); the corresponding part of the order was annulled (CAA Nantes, 17 November 2023, No. 22NT02751).

The difficulty for an owner who lives abroad is the address. The town hall writes to the address it knows, often the French house itself or the address on the land registry. Under article R. 511-8 of the CCH, notifications are made by letter delivered against signature or any other means that gives a certain date of receipt, or otherwise by posting. And where the authority does not know your current address or cannot identify you, article R. 511-3 provides that the information is validly given by posting at the town hall and on the front of the building. The same rule applies to the order itself: under article L. 511-12, « la notification les concernant est valablement effectuée par affichage à la mairie de la commune » (notification to them is validly made by posting at the town hall of the commune), and on the facade. In other words, the procedure can lawfully move forward while you know nothing about it. The practical answer is to keep an address the town hall can use, to ask a neighbour or a local agent to tell you about any notice on the door, and, for heirs, to make sure the transfer of ownership after a death has been recorded.

That last point catches many families abroad. An estate that has never been settled does not protect the heirs. In a case about a house in Corsica, an heir argued that she could not be the owner because the estate of the last recorded owner had never been settled. The Marseille Administrative Court of Appeal rejected the argument, holding that « la seule circonstance que cette dernière n’ait pu être liquidée ne saurait faire obstacle » (the mere fact that the estate could not be settled cannot prevent) her being regarded as owner in her capacity as heir, since she had never renounced the estate and had herself paid for works on the house (CAA Marseille, 30 May 2022, No. 20MA01522).

What should you send during the observation period? The letter from the town hall describes the danger and the measures envisaged. Your reply is your chance to influence the order before it exists. Useful answers include a report from a structural engineer describing the actual condition of the building, a contractor’s quote and a realistic timetable, a proposal to carry out temporary shoring at once while the permanent repair is planned, and, where it applies, evidence that the danger does not come from your building at all (for example a retaining wall that supports a public road, discussed in Part II). Ask for the report referred to in article R. 511-3 if it was not enclosed. If the house is a listed building, near a historic monument or in a protected area, article R. 511-4 requires the authority to seek the opinion of the architecte des Bâtiments de France (the State heritage architect) before ordering repair or demolition, which can be relevant to the kind of works that may be required.

The safety order should not be confused with a different procedure in which a commune can end up owning a property that it considers abandoned. That procedure, the abandon manifeste, has its own deadlines and remedies, which are explained in our guide on what to do when a French town hall says your house is abandoned. A safety order does not transfer ownership; it imposes works, and their cost, on the owner.

B. What the safety order can require, the minimum one-month deadline, penalties of up to €1,000 a day and works carried out at your expense

After the adversarial phase, the authority adopts the order. Under article L. 511-11 of the CCH, it can require, within the deadline it sets, any of four measures: repairs or any other measure that remedies the situation, including measures to protect adjoining buildings; demolition of all or part of the building; an end to the use of the premises as a dwelling; and a temporary or permanent ban on living in, using or entering the premises. The same article requires the order to state that, if the deadline passes, the person responsible owes a daily penalty and that the works may be carried out at that person’s expense.

Demolition is the last resort, and the code says so in terms. Article L. 511-11 provides: « L’arrêté ne peut prescrire la démolition ou l’interdiction définitive d’habiter ou d’utiliser que s’il n’existe aucun moyen technique de remédier à l’insalubrité ou à l’insécurité ou lorsque les mesures et travaux nécessaires à une remise en état du bien aux normes de salubrité, de sécurité et de décence seraient plus coûteux que sa reconstruction. » (The order may only require demolition or a permanent ban on living in or using the premises if there is no technical means of remedying the unfitness or the danger, or where the measures and works needed to restore the property to standards of health, safety and decency would cost more than rebuilding it.) An owner who is ordered to demolish a house that an engineer considers repairable has a precise argument, and the engineer’s report is the evidence that supports it.

The deadline cannot be unrealistically short. Article R. 511-6 of the CCH provides that « Le délai d’exécution des mesures de réparation ou de démolition ne peut être inférieur à un mois à compter de la date de la notification de l’arrêté » (the time limit for carrying out repair or demolition measures cannot be shorter than one month from the date the order is notified), except under the emergency procedure. One month is a floor under article R. 511-6, not a standard period: the order can set a longer one, and an owner who has a contractor’s schedule can ask for the deadline to fit it.

Leaving the house empty does not help. Article L. 511-11 adds that if the building becomes unoccupied after the order, the person responsible must still carry out the measures within the deadline, and the authority can also impose, or carry out at that person’s expense, the measures needed to prevent access to the premises. For owners who rent the property out, the order has immediate consequences. Under article L. 511-18 of the CCH, from the notification of the order « les locaux vacants ne peuvent être ni loués, ni mis à disposition, ni occupés pour quelque usage que ce soit » (vacant premises can neither be let, nor made available, nor occupied for any purpose), and the owner must provide temporary accommodation or rehousing for occupants in the cases the article lists. Rent also stops, subject to exceptions listed in the article. Under article L. 521-2 of the CCH, rent for premises covered by a safety order ceases to be due from the first day of the month following the sending of the notification of the order, or its posting at the town hall and on the facade, until the first day of the month following the notification or posting of the order lifting it. For a furnished holiday let (meublé de tourisme), the same article L. 521-2 stops the sums due for the rental from the day after the notification or posting. Sums received in the meantime must be returned.

When the deadline passes without the works being done, three mechanisms come into play.

The first is the daily penalty (astreinte). Under article L. 511-15 of the CCH, the person who has not carried out the measures owes a penalty set by order of the authority, « sous le plafond de 1 000 € par jour de retard » (subject to a ceiling of €1,000 per day of delay), taking into account the scale of the works and the consequences of non-compliance. Article L. 511-15 also provides that the penalty runs from the date of notification of the order imposing it until the works are fully completed, that it is collected at the end of each quarter, and that the total cannot exceed the amount of the fine provided for in I of article L. 511-22, which is €50,000 in the basic case. The authority can waive it in whole or in part at the quarterly calculation « si le redevable établit que la non-exécution de l’intégralité de ses obligations est due à des circonstances qui ne sont pas de son fait » (if the person liable shows that the failure to meet all of his obligations is due to circumstances beyond his control). A contractor who has cancelled, a delay in obtaining heritage approval or a court case about the boundary wall are the kind of facts to document if you intend to ask for that waiver. You must also tell the authority when the works are completed: the penalty runs until then.

The second is works carried out by the commune in your place (exécution d’office). Under article L. 511-16 of the CCH, the authority can, by a reasoned decision, have the measures carried out at the owner’s expense. Demolition is different: the authority can only carry out a demolition prescribed by the order after a judgment of the president of the tribunal judiciaire (the civil court) ruling under the accelerated procedure on the merits. The cost is broad: under article R. 511-9, the claim covers all the measures made necessary by the works, including those needed to secure the structure or the adjoining buildings, the costs incurred by the commune or the State as public project owner and, where relevant, expert fees. Where the commune carries out the works, article L. 511-15 provides that the penalty stops on notification of that execution and is added to the cost of the works.

If several heirs own the house together in undivided ownership (indivision), they are all exposed. Article L. 541-2-1 of the CCH provides that, from the notification addressed to them, « ceux-ci sont solidairement tenus du paiement des sommes résultant des mesures exécutées d’office » (they are jointly and severally liable for the sums resulting from the measures carried out by the authority), and for the costs of accommodating or rehousing occupants. Joint and several liability means the commune can claim the whole amount from any one of them, who must then recover the others’ shares. A sibling in France who ignores the letters can therefore leave a co-heir abroad facing the full bill.

The third mechanism is criminal. Under article L. 511-22 of the CCH, « le refus délibéré et sans motif légitime d’exécuter les travaux et mesures prescrits » (the deliberate refusal, without legitimate reason, to carry out the prescribed works and measures) is punishable by one year’s imprisonment and a fine of €50,000, with heavier penalties where the occupant is vulnerable. The offence targets a deliberate refusal; an owner who engages with the authority, challenges the order in court or proves that works are under way is in a very different position from one who ignores every letter.

There are also ways out other than doing the works yourself. Article L. 511-13 of the CCH allows the owner to discharge the obligation by granting a rehabilitation lease (bail à réhabilitation), a long lease (bail emphytéotique) or by selling in exchange for a life annuity (vente en viager), with the other party taking on the works. For an owner abroad who has no wish to manage a building site, these options deserve a look before the deadline passes.

Finally, emergencies follow a separate track. Under article L. 511-19 of the CCH, in case of imminent danger that is obvious or established by the services’ report or by the court-appointed expert, the authority orders the indispensable measures without prior adversarial procedure, within the time limit it sets; complete demolition requires authorisation by the president of the civil court. If those measures are not carried out in time, article L. 511-20 provides that the authority has them carried out at the owner’s expense, and states that the daily penalty does not apply. Under article L. 511-21, if the emergency measures have durably ended the danger, the authority records their completion and lifts the order; if they have not, it continues under the ordinary procedure described above.

II. How to challenge a French safety order from abroad, and how to contest the bill for the works

A. Appealing the arrêté de mise en sécurité: two months plus two for owners abroad, full review by the judge and emergency suspension

A safety order is challenged before the administrative court (tribunal administratif) of the area where the property is located. The general time limit is in article R. 421-1 of the Code of Administrative Justice: the court can only be seised within two months of the notification or publication of the decision. For owners who live outside France, article R. 421-7 adds: « Ce même délai est augmenté de deux mois pour les personnes qui demeurent à l’étranger. » (This same time limit is increased by two months for persons who live abroad.)

You can also first ask the mayor to withdraw or amend the order, for example on the basis of your engineer’s report. Under article L. 411-2 of the Code of Relations between the Public and the Administration, any administrative decision can be the subject, within the time limit for going to court, « d’un recours gracieux ou hiérarchique qui interrompt le cours de ce délai » (of an appeal to the author of the decision or to a higher authority, which interrupts the running of that time limit). This informal appeal (recours gracieux) is useful when the dispute is about the scope or timing of the works, but article L. 411-2 only deals with the time limit for going to court, so treat the works deadline and the penalty as still running while you wait for an answer.

When was the order notified to you? If you signed for a registered letter, the date is clear. If the town hall relied on a posting at the town hall and on the facade, article L. 511-12 treats that posting as a valid notification. Whether, and from when, the court time limit then runs against an owner abroad who saw nothing is not settled by the decisions consulted for this article, so the prudent course is to act as if it had started on the date of the posting. Note also how the Toulouse Administrative Court of Appeal approached the question for a company that claimed it had never received an order: it took into account the company’s own letter to the mayor acknowledging receipt and its application to the court, and noted that, for works on common parts, notification to the managing agent was enough (CAA Toulouse, 18 March 2025, No. 23TL02263).

The type of review matters for the strategy. The same Toulouse decision of 18 March 2025 held that, for orders made under the former imminent-danger procedure, « il appartient au juge administratif, statuant en qualité de juge de plein contentieux, d’apprécier les circonstances de droit et de fait à la date à laquelle il se prononce » (it is for the administrative judge, acting with full jurisdiction, to assess the legal and factual circumstances on the date of the judgment). The court took the same approach for an order under the current texts concerning a retaining wall in Nîmes, holding that the challenge to an ordinary danger order falls within full-jurisdiction proceedings (CAA Toulouse, 8 July 2025, No. 24TL02867); in that case, the commune had itself repaired the wall under its general police powers after heavy rain, and the court found that the case challenging the order no longer had any purpose because the wall no longer presented a danger on the date of its ruling. The Nantes court used the same full-jurisdiction framework in the 2023 decision cited above. Two consequences follow for an owner abroad. Evidence about the current state of the building, such as photographs, an engineer’s report and invoices, carries weight. And if the danger has gone by the time the court rules, the challenge to the order itself may be found to have no further purpose, as in the Nîmes case; if you consider that the cost should not fall on you, for example because the structure is a public work, write to the town hall setting out your reservations before any works begin and keep every invoice.

Several arguments recur in these cases.

The first is that the danger does not come from your property, or that the structure is not yours to maintain. In a case about a stone wall that supported a village street, the Lyon Administrative Court of Appeal held that the wall, although built entirely on the owner’s land and belonging to him, served as a support for the public road and was therefore itself a public work maintained by the commune. The court concluded that the mayor « ne pouvait légalement mettre en oeuvre, s’agissant de ce mur, la procédure de péril » (could not lawfully use the danger procedure in respect of that wall), and discharged the owner from paying the €50,279.03 charged for the works (CAA Lyon, 25 October 2018, No. 16LY02312). The owner was discharged even though the danger order itself had become final. Retaining walls along roads and walls that hold up a public path are worth examining from this angle.

The second is procedural: no invitation to comment, an incomplete file, or an order addressed to the wrong person. The Nantes decision of 2023 shows that the absence of the adversarial phase can lead to annulment; the Marseille decision of 2022 shows that an heir who has not renounced the estate cannot escape the order merely because the estate has not been settled.

The third concerns the measures themselves: demolition ordered when repair is technically possible and costs less than rebuilding, contrary to article L. 511-11, or a works deadline shorter than the one-month minimum set by article R. 511-6.

The fourth concerns emergencies, and it was clarified by the Conseil d’État, France’s highest administrative court, in a decision rendered under the provisions in force before 2021. The case concerned a building demolished by a commune under an imminent-danger order. The court held that, under the imminent-danger procedure as it then stood, the mayor had to confine himself to the provisional measures needed for safety, and that where extreme urgency requires immediate demolition « le maire ne peut l’ordonner que sur le fondement des pouvoirs de police générale » (the mayor can only order it on the basis of his general police powers), under article L. 2212-2 and article L. 2212-4 of the General Code of Local Authorities, « en faisant réaliser ces travaux aux frais de la commune » (having the works carried out at the commune’s expense). The court added that if the commune then seeks reimbursement from the owner on the basis of fault or unjust enrichment, the dispute belongs to the civil courts (Conseil d’État, 4 July 2024, No. 464689). The current article L. 511-19 now allows complete demolition in an emergency with the civil court’s authorisation, so the legal basis of an emergency demolition, and therefore who bears its cost, has to be checked in each file.

When the works are expensive and the deadline is close, an application for suspension can be made alongside the main challenge. Under article L. 521-1 of the Code of Administrative Justice, where a decision is the subject of an application for annulment or variation, the interim relief judge (juge des référés) may suspend it « lorsque l’urgence le justifie et qu’il est fait état d’un moyen propre à créer, en l’état de l’instruction, un doute sérieux quant à la légalité de la décision » (where urgency justifies it and an argument is raised that creates, at that stage of the proceedings, serious doubt about the lawfulness of the decision). Because a safety order exists to protect neighbours and passers-by, an application is far more credible when the owner shows that interim shoring is already in place.

B. Contesting the bill for works carried out by the commune: the recovery order, its time limits, and why selling or winning in court may not end the debt

When the commune or the State carries out the works, it sends the bill in the form of a recovery order (titre exécutoire or titre de recettes). Under article L. 511-17 of the CCH, sums advanced by a mayor are recovered as in the case of direct taxes, under article L. 1617-5 of the General Code of Local Authorities, while sums advanced by the prefect are recovered as non-tax debts of the State. In practice, the claim is handled by the public accountant (comptable public) with the enforcement tools used for public debts, such as a garnishment notice sent to a third party who holds money for you, as in the Bordeaux case discussed below, which is why these disputes often sit at the border between public law and public-revenue procedure and are regularly handled alongside tax recovery issues by a Paris tax lawyer used to disputes with French public accountants. For an owner abroad, the first sign of the bill may be a garnishment notice received by a French bank.

The time limit for contesting a commune’s bill is short. Under article L. 1617-5 of the General Code of Local Authorities, the action to contest the amount claimed by a local authority « se prescrit dans le délai de deux mois à compter de la réception du titre exécutoire ou, à défaut, du premier acte procédant de ce titre ou de la notification d’un acte de poursuite » (is time-barred two months after receipt of the recovery order or, failing that, of the first act based on it or the notification of an enforcement measure). Contrary to the general rule for local authority debts, going to court does not stop collection here: article L. 541-1 of the CCH provides that « N’est pas suspensive l’opposition introduite devant le juge administratif au titre exécutoire » (a challenge before the administrative court to the recovery order does not suspend it) where the order concerns a daily penalty, works carried out by the authority or the costs of rehousing occupants.

As the Bordeaux Administrative Court of Appeal recalled, if a decision was notified without mention of the available remedies and time limits, those time limits cannot be held against you, but you do not have unlimited time either. In that case, about a commune’s bill for demolishing a dangerous building, the court applied the “reasonable time” rule: « ce délai ne saurait, sous réserve de l’exercice de recours administratifs pour lesquels les textes prévoient des délais particuliers, excéder un an » (that time limit cannot, subject to administrative appeals for which specific time limits are provided, exceed one year) from the date on which the decision was notified or the person is shown to have known of it. The owner, who had received a copy of the recovery order in 2005, could no longer challenge its lawfulness when contesting a garnishment in 2014 (CAA Bordeaux, 12 April 2019, No. 17BX00936).

The same Bordeaux decision explains why the safety order itself must be challenged in time. The court recalled that, for an individual decision, the plea that an earlier act is unlawful can only be raised in a later dispute « si l’acte n’est pas devenu définitif à la date à laquelle elle est invoquée » (if the act has not become final on the date the plea is raised), save where the two acts form a single complex operation. An owner who lets the safety order become final and only reacts when the bill arrives may therefore find that the main arguments against the order are no longer available.

Winning against the order is important, but it may not wipe out the debt. In a case where an imminent-danger order had been partly annulled after the commune carried out the works, the Cour de cassation, France’s highest civil court, approved the court of appeal’s reasoning that « le fait, pour le maire, de ne pas pouvoir délivrer un titre exécutoire afin de mettre à la charge du propriétaire, sur le fondement de l’article L. 511-4 du code de la construction et de l’habitation, le coût des travaux exécutés d’office par la commune en exécution de l’arrêté de péril annulé ne faisait pas obstacle à l’exercice de l’action de la commune fondée sur l’enrichissement sans cause » (the fact that the mayor could not issue a recovery order charging the owner, on the basis of article L. 511-4 of the Construction and Housing Code, for the cost of works carried out by the commune under the annulled danger order did not prevent the commune’s action based on unjust enrichment). The owners’ association was ordered to pay €72,785, corresponding to the enrichment assessed by the court of appeal (Cass. 3e civ., 26 October 2022, No. 21-12.674). The value that the works added to the building can therefore come back to the owner in the form of a civil claim.

Selling the house does not necessarily end the matter either. In a case decided under the former public health code rules on unfit housing, the Conseil d’État held that the authority that has carried out the works « est en droit de rendre débitrice de la créance qu’elle détient la personne qui a la qualité de propriétaire ou de copropriétaire de l’immeuble à la date d’expiration du délai imparti par la mise en demeure d’exécuter les travaux » (is entitled to make liable for its claim the person who was owner or co-owner of the building on the date the deadline set in the formal notice to carry out the works expired). It therefore set aside an appeal ruling that had cleared a company which sold its flats before the bill was issued, on the sole ground that it was no longer an owner (Conseil d’État, 28 September 2020, No. 429980). In co-ownership buildings, article R. 511-12 of the CCH also requires the managing agent to notify the authority without delay of the sale of a lot belonging to a defaulting co-owner, so that the authority can assert its rights with the notary handling the sale.

Selling without telling the buyer is a further risk. In a dispute over a Paris-area flat, the Paris Court of Appeal upheld an award of €50,000 in damages against a seller who, as the volunteer managing agent of the building, knew the extent of the structural problems identified by an expert years earlier in the context of the danger procedure and did not pass that information on. The court held that « En taisant délibéremment à Monsieur [D] les désordres révélés dans toute leur ampleur par l’expertise de Monsieur [K], Madame [L] a commis une dissimulation intentionnelle d’une information dont elle savait le caractère déterminant pour l’acquéreur » (by deliberately keeping from the buyer the defects revealed in their full extent by the expert report, the seller had intentionally concealed information she knew to be decisive for the buyer) (CA Paris, Pôle 4, ch. 1, 10 November 2023, No. 22/02529). If you plan to sell a property subject to a safety order, give the notary the full file: the order, the reports, the correspondence with the town hall and the works already done.

Once the works are completed, ask for the order to be lifted. Under article L. 511-14 of the CCH, the authority records the completion of the measures and their date and lifts the order (arrêté de mainlevée), together with any ban on occupation; the lifting order is published in the land registry at the owner’s initiative. That document ends the restrictions on letting described in Part I, makes rent due again under article L. 521-2 from the first day of the month following its notification or posting, and is the best proof you can give a buyer or a lender that the danger has been dealt with.

Conclusion

A French safety order (arrêté de mise en sécurité, still often called an arrêté de péril) is one of the few documents from a French town hall that can cost an owner abroad tens of thousands of euros in a few months. The procedure gives you a hearing before the order is made, with at least one month to present observations under article R. 511-3 of the Construction and Housing Code, and at least one month to carry out the works once the order is notified under article R. 511-6, except in an emergency. After that, the daily penalty of up to €1,000 under article L. 511-15 and works carried out at your expense under article L. 511-16 follow, with joint and several liability among co-heirs under article L. 541-2-1.

The order can be challenged before the administrative court within two months under article R. 421-1 of the Code of Administrative Justice, extended by two months for people living abroad under article R. 421-7, with a request for suspension where urgency justifies it. The decisions discussed above show where such challenges succeed: a structure that is in reality a public work, an adversarial phase that never took place, or an emergency demolition carried out on the wrong legal basis. They also show the limits: an unsettled estate does not shield the heirs, a sale does not erase a debt fixed at the end of the deadline, and an annulment may still leave the owner facing a claim for unjust enrichment. The recovery order that follows has its own two-month time limit under article L. 1617-5 of the General Code of Local Authorities and, under article L. 541-1 of the Construction and Housing Code, is not suspended by a court challenge. For an owner abroad, the decisive steps are the same in every case: keep an address the town hall can reach, react within the first month, rely on an engineer’s report rather than on letters of protest, and treat every document from the mairie as a deadline.

📄 Official circular