Lawyer for building without a permit in Paris, France: planning offences
Official report Limitation Demolition Regularisation
First written analysis80 € incl. VAT
Describe your situation and attach your documents.Your written analysis within 24 working hours.
Or call the firm on +33 6 89 11 34 45
In the media
Watch the videos and their transcriptsVideos
Kohen Avocats, Paris 16
How the firm defends you in a building without a permit case in Paris
Criminal planning law · Paris 16th
What a lawyer for building without a permit does in Paris
A house, an extension, a raised storey, a shed or a change of use carried out without the required building permit (permis de construire) or prior declaration (déclaration préalable) exposes the person responsible, in France, to criminal prosecution, to demolition and, for some years now, to sanctions imposed by the town hall itself. Kohen Avocats assists owners, buyers, heirs, contractors and companies from the official report of the offence (procès-verbal) onwards: the firm prepares the interview, disputes the date of completion of the works and the limitation period, examines whether regularisation is possible, then defends the case before the Paris criminal court (tribunal correctionnel), the courts of the Paris region (Île-de-France) and the court of appeal.
The same construction can give rise to three separate procedures. The criminal court punishes the offence set out in Article L. 480-4 of the French Planning Code (Code de l'urbanisme) and rules on demolition or bringing the works into compliance; the municipality can apply to the judicial court (tribunal judiciaire) for demolition for ten years after completion (Article L. 480-14); finally, the mayor can, independently of any prosecution, impose an administrative fine and a daily penalty (Article L. 481-1), disputes over which fall to the administrative courts. The firm coordinates these fronts, working with the firm's planning law practice on the administrative side.
Before the first appointment, gather what exists: the official report or the letter from the town hall, the summons to appear or the direct summons (citation), the title deed, dated plans and photographs of the works, the contractors' invoices with their dates, any permits already granted or refused and, if you bought the property, the deed of sale and its schedules. You can send them now using the form at the bottom of the page.
The firm
Hassan Kohen
Lawyer (avocat) at the Paris Bar, criminal law and planning law.
Official profile in the directory of French lawyers (CNB) · 4.9/5 on Google, more than 250 reviews
Kohen Avocats, at 10 avenue du Colonel Bonnet in the 16th arrondissement, brings criminal defence and planning law together in a single case. A prosecution for building without a permit is rarely won on one ground alone: the date of completion of the works, the lawfulness of the official report, the existence of a tacit permit or of an application for regularisation, and the proportionality of demolition are argued together. The firm also acts in defence before the Paris criminal court.
Your situation
Official report, summons or purchase: the right approach
The strategy depends on when you seek advice. Before any interview, regularisation can still be initiated; at the hearing, the completion date and the restoration measure are argued; after conviction, there remain the appeal, enforcement and the daily penalty.
An officer has recorded the works
An official report of the offence has been drawn up or the town hall has written to you. The firm checks what was recorded, prepares your interview and examines whether an application for regularisation should be filed without delay.
You have been summoned to court
Summons to appear, direct summons, criminal penalty order (ordonnance pénale) or guilty plea proposal: the firm checks the limitation period and the period covered by the prosecution, then prepares the arguments on the fine and on demolition.
The town hall serves you with formal notice
The mayor can, after inviting you to submit your observations, impose an administrative fine, give you formal notice to regularise and order a daily penalty. These observations must be prepared with care.
You are buying or inheriting a non-compliant property
An old unauthorised extension can still expose the property to action by the municipality and complicate a utility connection, a sale or new works. The firm reviews the situation before signature or before the estate is divided.
Time limits
The time limits that decide a building without a permit case
Three different time limits govern an unlawful construction: the limitation period for criminal prosecution, the limitation period for action by the municipality, and the period after which an old irregularity can no longer, in principle, justify a refusal. These are the ones the firm checks first, as they result from the texts in force on 15 October 2026.
Six years to prosecute
Prosecution of an offence (délit) becomes time-barred after six full years (Article 8 of the French Code of Criminal Procedure (Code de procédure pénale)), counted, for a construction, from the completion of the works (Cass. crim., 20 January 2026, No. 25-83.987).
Ten years for action by the municipality
The municipality can ask the judicial court to order the demolition or bringing into compliance of a structure built without a permit; the action becomes time-barred ten years after completion of the works (Article L. 480-14 of the French Planning Code).
Ten years, except where there was no permit at all
A construction completed more than ten years ago can no longer, on account of its original irregularity, justify the refusal of a new permit; the rule does not apply where no permit was obtained although one was required (Article L. 421-9).
Forty-eight hours for a stop-works order
The court hearing an application to halt the works rules after hearing the beneficiary of the works or after duly summoning them to appear within forty-eight hours; the mayor can also order the works to stop by a reasoned order (Article L. 480-2).
Forty-five days to challenge a criminal penalty order
The defendant has forty-five days from notification to lodge an objection to a criminal penalty order (ordonnance pénale), which opens a hearing before the criminal court (Article 495-3 of the French Code of Criminal Procedure).
Ten days to appeal
An appeal against a criminal court judgment delivered after an adversarial hearing must be lodged within ten days of its delivery, except in cases where time runs only from service of the judgment (Article 498 of the French Code of Criminal Procedure).
A time limit set by the court
The court sets a time limit for demolition or bringing into compliance and may attach to it a daily penalty (astreinte) of up to 500 euros per day of delay (Article L. 480-7); without a set time limit, the daily penalty cannot be enforced (Cass. crim., 26 March 2024, No. 23-81.499).
One year's extension at most
The time limit set in an administrative formal notice can be extended, for a period not exceeding one year, to take account of the difficulties faced by the person concerned; the administrative daily penalty is capped at 1,000 euros per day and 100,000 euros in total (Article L. 481-1).
Criminal defence
Building without a permit: the stages of the defence
Each section below corresponds to a question the firm deals with in a building without a permit case, with the texts and decisions that govern it. The sources link to Légifrance and to the website of the Court of Cassation (Cour de cassation); the articles are cited in their wording in force on 15 October 2026.
The official report
Recording the offence
The official report of a planning offence
The official report is valid until proven otherwise: it can be challenged, with documents in support.
Breaches of planning rules are recorded by judicial police officers and agents, and by sworn State and local authority officials and agents commissioned by the mayor or the minister. Their official reports are valid until proven otherwise; when the competent mayor becomes aware of an offence, he or she is required to have an official report drawn up, a copy of which is sent without delay to the public prosecutor (Article L. 480-1 of the French Planning Code). The municipality and approved environmental protection associations can exercise the rights of a civil party (partie civile). The Court of Cassation holds that neither Article L. 480-1 of the Planning Code nor any other text makes the validity of an official report recording an offence conditional on stating the identity of the person who may have committed the acts recorded
(our translation) (Cass. crim., 29 April 2025, No. 24-84.702): the person responsible can be identified later.
The defence therefore begins with a close reading of the official report: date of the inspection, area and nature of the works noted, the permit referred to, photographs. An error on the area changes the permit required, and a wrong date changes the limitation period. Officers can inspect the premises for up to six years after completion of the works (Article L. 461-1); a home, however, can only be inspected in the presence of its occupant and with their consent, between 6:00 and 21:00 (Article L. 461-2), and, if access is refused, the inspection can be authorised by the liberty and custody judge (JLD) (Article L. 461-3). Obstructing officers in their inspection or investigation duties is a separate offence, punishable by six months' imprisonment and a fine of 7,500 euros (Article L. 480-12): the response to a request for an inspection should be prepared with a lawyer. The firm then assists you at the interview and examines without delay whether an application for regularisation is possible.
House, extension, shed
Which permit?
House, extension or garden shed without a permit
The offence depends first on the authorisation that was required: a building permit or a prior declaration.
Constructions, even without foundations, must be preceded by a building permit (Article L. 421-1 of the French Planning Code), except those that the texts exempt from any formality or make subject only to a prior declaration (Article R. 421-1). A new house in principle requires a permit. Outside remarkable heritage sites (sites patrimoniaux remarquables), the surroundings of historic monuments and listed sites or sites being listed, a new construction with a footprint or floor area of more than five square metres, a footprint and floor area of no more than twenty square metres and a height of no more than twelve metres requires a prior declaration (Article R. 421-9). The criminal chamber of the Court of Cassation thus upheld the conviction for a construction of about twenty square metres, since the works, with a footprint of more than five square metres, could not be undertaken without a prior declaration
(our translation) (Cass. crim., 30 June 2026, No. 25-86.445).
For an extension, a permit is required where the works create more than twenty square metres of floor area or footprint, a threshold raised to forty square metres in the urban zones of a local urban development plan (plan local d'urbanisme), unless the extension takes the whole building beyond the ceilings that make it compulsory to use an architect (Article R. 421-14 and Article R. 431-2); below that, a prior declaration may be required, in particular where the works alter the external appearance of the building (Article R. 421-17). In Paris, you need to check whether the plot lies in the surroundings of a historic monument or in a remarkable heritage site, where the exemptions from formalities do not apply: the firm checks this regime first. Carrying out works subject to prior declaration without filing one is the same offence as building without a permit (Article L. 480-4).
Prosecution and limitation
Limitation period
Prosecution and limitation: the date of completion of the works
Six years from completion, and it is for the prosecution to establish that the action is not time-barred.
Prosecution of an offence becomes time-barred after six full years (Article 8 of the French Code of Criminal Procedure). For a construction, the Court of Cassation holds that the offence consisting of the unlawful execution of construction works is committed throughout the time during which they are carried out, so that its commission extends until their completion
(our translation). In the same judgment it reiterates that it is for the prosecution to establish that this action is not extinguished by limitation
(our translation), and quashes the decision that had placed on the defendant the burden of proving the completion date: it was for the judges to ascertain when the offences had been completed according to the date of completion of the works in question
(our translation) (Cass. crim., 20 January 2026, No. 25-83.987).
The completion date is proven by concrete evidence: dated invoices, witness statements, photographs, declaration of completion, utility consumption records, property tax notices. The firm also checks the period covered by the summons: the judges may rule only on the facts referred to them by the summons or by the committal order, unless the defendant expressly agrees to be tried on facts distinct from those covered by the charge
(our translation) (Cass. crim., 1 April 2025, No. 24-80.124). Criminal limitation does not extinguish the municipality's civil action, which has ten years (Article L. 480-14 of the French Planning Code). Further reading: limitation of prosecution before the criminal court (in French).
Fine and liability
Penalties incurred
The fine incurred and the persons prosecuted
A fine calculated on the area built, and possible prosecution of everyone involved.
Carrying out works in breach of the obligations of the Planning Code or of the requirements of a permit or of a decision taken on a prior declaration is punishable by a fine of between 1,200 euros and, for a construction creating floor area, 6,000 euros per square metre of area built, demolished or rendered unusable, or 300,000 euros in other cases; for a repeat offence, six months' imprisonment may be added. These penalties can be imposed on the users of the land, the beneficiaries of the works, architects, contractors or other persons responsible for carrying them out (Article L. 480-4 of the French Planning Code). Legal entities can also be held liable (Article L. 480-4-2). The same sanctions apply to breaches of the local urban development plan (Article L. 610-1).
Intent is largely inferred from the facts: the mere finding of a knowing breach of a statutory or regulatory requirement implies on the part of its author the criminal intent required by Article 121-3, paragraph 1, of the Criminal Code
(our translation) (Cass. crim., 29 April 2025, No. 24-84.702). The defence therefore often focuses on whether the person was a beneficiary of the works, on the area actually created, on the authorisation required and on the sentence. The case may also be dealt with by a criminal penalty order or by a guilty plea procedure (comparution sur reconnaissance préalable de culpabilité), procedures in which demolition or bringing into compliance can be ordered in the same way (Article L. 480-5): you need to know this before accepting a proposal.
Demolition or compliance
Restoration
Demolition or bringing into compliance: what the court must check
A measure attached to the property, which requires the mayor's opinion and can be challenged in light of the right to respect for one's home.
Upon conviction, the court rules, in light of the written observations or after hearing the mayor or the competent official, either on bringing the premises or structures into compliance, or on their demolition or the restoration of the land to its previous use (Article L. 480-5 of the French Planning Code). A demolition ordered without the mayor or the prefect having been heard or invited to submit observations is quashed (Cass. crim., 20 January 2026, No. 25-83.987). These measures are measures attached to the property intended to bring an unlawful situation to an end and not criminal penalties
(our translation): they cannot be imposed as a principal penalty (Cass. crim., 18 March 2025, No. 24-82.569). Restoration of the premises, a measure attached to the property, is left to the discretion of the judges
(our translation), who must respond to submissions alleging a disproportionate interference with the right to respect for private and family life (Cass. crim., 13 May 2025, No. 24-81.666).
This proportionality review has its limits: The proportionality of the interference caused by this measure with the defendant's fundamental rights may be examined before it is ordered, except where it applies to unlawful constructions in a natural hazard zone
(our translation) (Cass. crim., 24 June 2025, No. 24-83.658), and it can no longer be raised against the rate of the daily penalty at the recovery stage; for a house in a high-risk flood zone, it was rejected (Cass. crim., 16 January 2018, No. 17-81.884). Nor can the court extend restoration to an older construction that was not prosecuted without establishing an indivisible whole, which presupposes a set of elements that cannot subsist without one another
(our translation) (Cass. crim., 16 May 2023, No. 22-83.634). The court sets a time limit for compliance and can impose a daily penalty of up to 500 euros per day of delay; it can later waive payment of part of the daily penalties to take account of the conduct of the convicted person and the difficulties encountered (Article L. 480-7).
Regularisation
Regularisation
Regularising a building without a permit
Regularisation does not erase the offence, but it can prevent demolition.
Obtaining a permit or a decision of non-opposition after the event does not erase the offence already committed: the criminal chamber holds that the intentional element of the offences is inferred from the knowing breach of the statutory and regulatory provisions and that the subsequent partial regularisation of certain offences does not erase it
(our translation) (Cass. crim., 16 January 2018, No. 17-81.157). It can, however, save the structure. According to the Court of Cassation, the subsequent grant of a tacit permit, although it does not erase the completed offence, precludes an order to demolish the structure as long as that permit has not been annulled for abuse of power or its illegality has not been established by the administrative courts
(our translation) (Cass. crim., 30 June 2026, No. 25-85.934). Likewise, regularisation by a decision of non-opposition to a prior declaration of the works initially undertaken unlawfully and which had led to a conviction precluded the restoration
(our translation) of the building concerned (Cass. crim., 2 June 2026, No. 25-83.001).
Regularisation only applies to the works it covers: in the case decided on 2 June 2026, the restoration order remained in force for the second building, which was still non-compliant. It also requires the project to comply with the applicable planning rules, and merely filing an application is not enough: the firm checks these points with you before anything is filed. For a construction completed more than ten years ago, a refusal cannot in principle be based on the original irregularity, but this protection does not apply, in particular, where the construction was built without any permit being obtained although one was required, or where a demolition action has been brought under the conditions laid down in Article L. 480-13 (Article L. 421-9 of the French Planning Code). Further reading: sanctions, demolition and regularisation of a building without a permit (in French).
Town hall sanctions
Administrative route
Administrative fine, formal notice and daily penalty imposed by the mayor
Independently of criminal prosecution, the town hall can impose sanctions itself, after hearing you.
Where an official report has been drawn up, the authority competent to grant permits can, independently of criminal prosecution and after inviting the person concerned to submit observations, order payment of a fine of up to 30,000 euros and give them formal notice, within a time limit it sets, either to bring the construction into compliance or to file an application for a permit or a declaration seeking to regularise it. The time limit can be extended by up to one year to take account of the difficulties encountered. The formal notice can be accompanied by a daily penalty of up to 1,000 euros per day of delay, the total of which cannot exceed 100,000 euros; a further fine of up to 30,000 euros can be ordered if the formal notice is not complied with (Article L. 481-1 of the French Planning Code).
The same article provides that an objection lodged with the administrative court against the enforcement order does not have suspensive effect, and that, where the formal notice has had no effect by the end of the time limit set, the competent authority can carry out the prescribed measures itself, at the expense of the person concerned, for installations that present a definite risk to safety or health or that are located outside urban zones; complete demolition of these installations further requires that no technical means allow them to be regularised and the authorisation of the president of the judicial court. The decisive moment is when observations are requested before the decision: the firm responds in writing, disputing whether the offence was actually committed, the proportionality of the fine and the time needed to regularise. This administrative side is handled with the firm's planning law practice.
Municipality, purchase, inheritance
Civil courts
Action by the municipality, purchase and inheritance of a non-compliant property
The irregularity follows the property: it should be checked before buying, selling or dividing an estate.
The municipality or the inter-municipal body responsible for the local urban development plan can apply to the judicial court for an order to demolish or bring into compliance a structure built without the required permit or in breach of it, for ten years from completion of the works (Article L. 480-14 of the French Planning Code). Nor does the extinction of the prosecution on the death of the defendant prevent demolition or bringing into compliance: if the criminal court had not yet been seised, the matter can be brought before the judicial court by the public prosecutor, at the mayor's request, until the day on which the prosecution would have become time-barred, with the heirs joined to the proceedings (Article L. 480-6).
A building constructed without the required permit cannot be permanently connected to the electricity, water, gas or telephone networks, notwithstanding any contractual clause to the contrary (Article L. 111-12), and new works on the construction may come up against its original irregularity (Article L. 421-9). Before buying, selling or dividing a property that includes an extension or an annexe for which no permit can be found, the firm compares the authorised plans with what exists, dates the works and assesses the risks that remain open. For an inherited property: inherited house built without a permit (in French).
Frequently asked questions
Frequently asked questions
Frequently asked questions for a building without a permit lawyer in Paris
You are looking for a lawyer for building without a permit in Paris because an official report has been drawn up, a summons has arrived or you are buying a non-compliant property: here are the answers to the questions clients most often ask the firm.
What are the penalties for building without a permit in France?
Building without the required building permit or prior declaration, or in breach of the permit obtained, is an offence punishable by a fine of between 1,200 euros and 6,000 euros per square metre of area built, demolished or rendered unusable, or 300,000 euros in other cases; for a repeat offence, six months' imprisonment may be added (Article L. 480-4 of the French Planning Code). The court also rules on bringing into compliance, demolition or restoration, in light of the observations of the mayor or the competent official (Article L. 480-5), and can set a daily penalty of up to 500 euros per day of delay (Article L. 480-7). Independently of any prosecution, the mayor can order an administrative fine of up to 30,000 euros and a daily penalty (Article L. 481-1), and the municipality can bring a demolition action before the judicial court for ten years after completion (Article L. 480-14). The amount actually imposed depends on the area, the location of the property and whether regularisation is possible.
Can a house built without a permit be demolished in France?
Yes, but demolition is neither automatic nor a penalty. The criminal court chooses between bringing into compliance and demolition after obtaining the observations of the mayor or the competent official (Article L. 480-5 of the French Planning Code); the Court of Cassation quashes a demolition ordered without the mayor having been heard or invited to submit observations (Cass. crim., 20 January 2026, No. 25-83.987). These are measures attached to the property, intended to bring an unlawful situation to an end, and cannot be imposed as a principal penalty (Cass. crim., 18 March 2025, No. 24-82.569). Where the house is your home, the court must respond to the argument that there is a disproportionate interference with the right to respect for private and family life (Cass. crim., 13 May 2025, No. 24-81.666), except in a natural hazard zone, where this review is excluded (Cass. crim., 24 June 2025, No. 24-83.658). A regularisation permit obtained before judgment can also prevent demolition.
What is the limitation period for building without a permit in France?
Under criminal law, prosecution of an offence becomes time-barred after six full years (Article 8 of the French Code of Criminal Procedure). For a construction, time runs from completion of the works, because the offence continues as long as they are being carried out; the Court of Cassation specifies that it is for the prosecution to establish that the action is not time-barred and for the judges to date completion (Cass. crim., 20 January 2026, No. 25-83.987). Two other time limits must be distinguished. The municipality can ask the judicial court for demolition for ten years from completion (Article L. 480-14 of the French Planning Code). And although the irregularity of a construction completed more than ten years ago can no longer, in principle, justify the refusal of a new permit, this rule does not apply to a construction built without any permit although one was required (Article L. 421-9). A house built without a permit therefore does not become lawful through the mere passage of time.
Do I need a building permit for a house extension in France?
It depends on the area created and the location of the land. An extension creating more than twenty square metres of floor area or footprint requires a building permit; in the urban zones of a local urban development plan, this threshold is raised to forty square metres, except where the extension takes the whole building beyond the ceilings that make it compulsory to use an architect (Article R. 421-14 of the French Planning Code and Article R. 431-2). Below that, a prior declaration may be required, in particular where the works alter the external appearance of the building (Article R. 421-17). An extension built without the required authorisation exposes you to the sanctions of Article L. 480-4, whether a permit or a simple declaration was required. In Paris, check whether the plot lies in the surroundings of a historic monument or in a remarkable heritage site, where the rules are stricter, before assessing the risk. An extension without a permit can be the subject of an application for regularisation where the project complies with the rules in force, preferably before any hearing.
Can a building without a permit be regularised in France?
Yes, where the project complies with the applicable planning rules, and only for the works that the new permit covers. Regularisation does not erase the offence already committed: the Court of Cassation holds that subsequent regularisation does not erase the intentional element (Cass. crim., 16 January 2018, No. 17-81.157). But it protects the structure: a tacit permit granted subsequently prevents demolition as long as it has not been annulled or its illegality has not been established by the administrative courts (Cass. crim., 30 June 2026, No. 25-85.934), and a decision of non-opposition to a prior declaration has been held to prevent restoration of the regularised building (Cass. crim., 2 June 2026, No. 25-83.001). An application should therefore be prepared before the hearing. If the town hall gives you formal notice to regularise, the time limit it sets can be extended by up to one year (Article L. 481-1 of the French Planning Code).
Who can record a building without a permit?
Judicial police officers and agents, as well as sworn State and local authority officials and agents commissioned by the mayor or the minister responsible for planning (Article L. 480-1 of the French Planning Code). Their official reports are valid until proven otherwise: they can therefore be challenged with photographs, dated invoices or witness statements, in particular as to the area and the completion date. The competent mayor who becomes aware of an offence is required to have an official report drawn up, which is sent without delay to the public prosecutor (procureur de la République). The official report does not have to state the identity of the person who carried out the works, who can be traced afterwards (Cass. crim., 29 April 2025, No. 24-84.702). A home can only be inspected with the occupant's consent or, failing that, with the authorisation of the liberty and custody judge (Article L. 461-2 and Article L. 461-3), but obstructing officers in their duties is a separate offence, punishable by six months' imprisonment and a fine of 7,500 euros (Article L. 480-12). If you receive a visit or a summons, the firm advises you on how to respond and prepares the interview.
Can the town hall impose a fine without going to court?
Yes. Under Article L. 481-1 of the French Planning Code, in its wording in force since 28 November 2025, the authority competent to grant permits can, where an official report has been drawn up and independently of criminal prosecution, order payment of a fine of up to 30,000 euros, after inviting the person concerned to submit observations. It can also give them formal notice to bring the construction into compliance or to file an application for regularisation within a time limit it sets, accompany that formal notice with a daily penalty of up to 1,000 euros per day, up to a limit of 100,000 euros, and order a further fine if the formal notice is not complied with. An objection lodged with the administrative court against the enforcement order does not have suspensive effect. Where the formal notice has no effect, the authority can carry out measures itself for installations that present a definite risk to safety or health or that are located outside urban zones; their complete demolition further requires that there be no technical means of regularisation and the authorisation of the president of the judicial court. The written response to the observations requested by the town hall is a useful moment to discuss the time limit and the amount.
What happens before the criminal court?
The case can come before the court by a summons to appear, a direct summons or after a criminal penalty order against which an objection was lodged within forty-five days of its notification (Article 495-3 of the French Code of Criminal Procedure). At the hearing, the firm first argues limitation and the scope of the case referred to the court, then the legal classification and the sentence, and finally the restoration measure. The court can rule on demolition or bringing into compliance only in light of the written observations or after hearing the mayor or the competent official (Article L. 480-5 of the French Planning Code), and it must set a time limit for compliance if it imposes a daily penalty (Cass. crim., 26 March 2024, No. 23-81.499). A judgment delivered after an adversarial hearing can be appealed within ten days of its delivery (Article 498 of the French Code of Criminal Procedure). See also our page on defence before the Paris criminal court.
Can the architect or the contractor be prosecuted?
Yes. The penalties for carrying out works without a permit or in breach of it can be imposed on the users of the land, the beneficiaries of the works, architects, contractors or other persons responsible for carrying them out (Article L. 480-4 of the French Planning Code). Companies can also be held criminally liable, with the fine applicable to legal entities and certain additional penalties, including a ban on the activity in the course of which the offence was committed (Article L. 480-4-2). Intent is established where the rule was breached knowingly (Cass. crim., 29 April 2025, No. 24-84.702). For a professional, the defence often focuses on their exact role on the site, on the instructions received from the project owner and on the permit they could reasonably believe had been obtained. The firm also examines possible claims between the parties involved once the criminal side has been settled.
Is a garden shed or a swimming pool without a permit an offence?
Yes, where a prior declaration or a permit was required. Outside remarkable heritage sites, the surroundings of historic monuments and listed sites or sites being listed, a new construction with a footprint or floor area of more than five square metres, a footprint and floor area of no more than twenty square metres and a height of no more than twelve metres requires a prior declaration (Article R. 421-9 of the French Planning Code); the criminal chamber upheld the conviction for a construction of about twenty square metres built without a declaration (Cass. crim., 30 June 2026, No. 25-86.445). For a swimming pool, the same article makes a pool of no more than one hundred square metres subject to prior declaration if it is uncovered or its cover is less than one metre eighty high, while a pool of no more than ten square metres is exempt from any formality outside these protected areas (Article R. 421-2). Works carried out without the required declaration are subject to the same sanctions as building without a permit (Article L. 480-4). In Paris, the location of the plot in a protected area can change the answer.
What should I do if I buy or inherit a house built without a permit in France?
First, date the works and compare what exists with the permits found at the town hall. Even where criminal prosecution is no longer possible, the municipality can ask the judicial court for demolition or bringing into compliance for ten years from completion (Article L. 480-14 of the French Planning Code). A building constructed without the required permit cannot be permanently connected to the electricity, water, gas or telephone networks (Article L. 111-12), and a construction built without any permit although one was required does not benefit from the ten-year rule for new works (Article L. 421-9). The death of the person who carried out the works does not prevent an order for demolition or bringing into compliance, with their heirs joined to the proceedings (Article L. 480-6). Before a sale or the division of an estate, an application for regularisation, where possible, is an option to consider. See also: inherited house built without a permit (in French).
How much does a building without a permit lawyer cost in Paris?
Fees depend on the stage at which you seek advice and on what is at stake: preparing an interview, responding to the observations requested by the town hall, filing an application for regularisation with an architect, pleading before the criminal court, appealing or challenging the enforcement of a daily penalty do not require the same work. The area concerned, whether demolition is being sought and the number of procedures running in parallel also affect the cost. The firm sets its fees as a fixed fee per stage or on a time-spent basis, and always formalises them in a written fee agreement signed before any action is taken. The first step is a written analysis of your documents, the price of which is shown in the form on this page. The cost of the defence is usefully compared with the quantified risk of the case: a fine calculated per square metre (Article L. 480-4 of the French Planning Code), the cost of demolition or bringing into compliance, and a daily penalty of up to 500 euros per day of delay (Article L. 480-7).
Articles L. 480-2, L. 480-4, L. 480-5 and L. 480-6 of the French Planning Code are marked on Légifrance as subject to deferred repeal on 1 January 2029, the date on which a new wording amends, in particular, their cross-references to the Code of Criminal Procedure; Articles 8, 495-3 and 498 of that code bear the same deferred repeal notice for that date. This page describes the law in force on 15 October 2026.
Our method
The same method for every case
The firm pleads before the Paris criminal court and the courts of the Paris region, before the Paris Court of Appeal, and before the judicial court when the municipality brings a demolition action. Hassan Kohen, avocat at the Paris Bar, personally studies the official report, the summons and the documents sent, then sets a strategy with you before any step is taken: a prepared interview, an application for regularisation, a response to the town hall, defence at the hearing or an appeal.
The first stage is always the same: dating the completion of the works, identifying the authorisation that was required, calculating the time limits still open and assessing what bringing the works into compliance would cost. The firm then proposes a course of action, sets out the foreseeable time frames and costs, and formalises the engagement in a written fee agreement. You can also send your documents using the form at the bottom of the page to receive a first written analysis.
First appointment
First step with the firm
Call the firm or send your documents using the form at the bottom of this page: Hassan Kohen studies them personally and sends you a first written analysis. For a building without a permit case, send first the official report or the letter from the town hall, the summons if you have received one, and any document that dates the completion of the works. The appointment takes place at the firm's office in Paris 16 or by video call.
Discover our expertise in criminal planning law
lawyer
Official report of the offence
paris
lawyer
House and extension without a permit
paris
lawyer
Limitation of prosecution
paris
lawyer
Criminal fine
paris
lawyer
Demolition and compliance
paris
lawyer
Regularisation
paris
lawyer
Town hall sanctions
paris
lawyer
Purchase and inheritance
paris