Featured in the media

  • Lexbase

Kohen Avocats, expropriation lawyers in Paris

Expropriation lawyer in France: challenge, negotiate, set compensation

Expropriation in France: declaration of public utility (déclaration d'utilité publique, DUP) and transferability order (arrêté de cessibilité), the expropriating authority's offer, written submissions and site visit before the expropriation judge, main and ancillary compensation, appeals, evicted tenants and traders, total taking, the right to require purchase (délaissement) and retrocession: the firm assists expropriated owners, occupiers and businesses, as well as the public authorities and developers that carry out the operation.

The firm can be reached 24/7. The expropriating authority's offer calls for a written reply within one month of its notification (Article R. 311-5 of the French Expropriation Code, Code de l'expropriation pour cause d'utilité publique); the declaration of public utility and the transferability order can be challenged before the administrative court within two months of their publication or notification (Article R. 421-1 of the Code of Administrative Justice, Code de justice administrative).

4,9/5

Average Google rating270 reviews

I received high-quality support from this criminal lawyer. His professionalism, his thorough command of the case and his constant involvement at every stage of the proceedings deserve to be highlighted. Communication was clear, structured and responsive, with precise advice suited to my situation. I recommend this lawyer to anyone looking for a rigorous and effective criminal defence.

Razari A. · Google review, translated from French

Mr Kohen handled my criminal case. I am very satisfied with the work he did and I recommend him to you without any hesitation.

Valérie A. · Google review, translated from French

Excellent criminal defence lawyer, he got me out of trouble in a protection order case brought abusively by my ex

MRK · Google review, translated from French

Very satisfied with the outcome obtained for my defence before the court. All the best

Mohammed Y. · Google review, translated from French

Hassan Kohen is a young, seasoned and highly competent lawyer. He is an excellent listener, with a great deal of empathy and strong human sensitivity. Available and responsive, he has complete command of his profession.

Mohamed Karim C. · Google review, translated from French

I had a very good experience with Hassan Kohen. He took the time to listen to me carefully and to understand my situation properly. He is a lawyer who gives sound advice, kind and available, and who knows how to steer his clients in the right direction. I recommend him without hesitation to anyone looking for an attentive and competent professional.

Adel H. · Google review, translated from French

Mr Kohen advised and supported us well. I thank him for everything he did.

Ridwan B. · Google review, translated from French
Hassan Kohen, lawyer in Paris

Preliminary case review

Send your documents. Get a French property lawyer's analysis.

80 €incl. VAT

Preliminary review of your case. Review of your documents and a first written analysis by Hassan KOHEN within 24 working hours. Payment is made online after this form is submitted.

  • Up to 1 GB of documents in total, folders and sub-folders accepted
  • Secure payment, no card details stored
  • Terms and fee agreement

Click or drag your files here
All formats accepted (PDF, Word, images, etc.)

Sending...

Payment constitutes a request for immediate performance of your analysis. Your data is used solely to process your request.
Terms · Privacy policy.

Hassan Kohen

Lawyer at the Paris Bar: expropriation in the public interest (expropriation pour cause d'utilité publique), setting of compensation, challenges to declarations of public utility and transferability orders.

Official profile in the national directory of French lawyers (CNB) · 4.9/5 on Google (270 reviews)

Page updated on 31 October 2026.

Quick answer

Real property can be expropriated only if the expropriation serves a public utility established after an inquiry, the plots and owners having been identified in an adversarial process, and it gives rise to fair compensation paid in advance (Article L. 1 of the French Expropriation Code, Code de l'expropriation pour cause d'utilité publique). The administrative phase leads to the declaration of public utility and then to the transferability order (Articles L. 121-1 and L. 132-1), which can be challenged before the administrative court within two months (Article R. 421-1 of the Code of Administrative Justice). The judicial phase begins with the order of the expropriation judge (juge de l'expropriation), which transfers ownership where there is no sale by agreement (Article L. 220-1). Failing agreement, the same judge sets the compensation, which covers the whole of the direct, material and certain loss (Articles L. 311-5 and L. 321-1), after an exchange of written submissions, a site visit and the opinion of the government commissioner (commissaire du Gouvernement); the parties must be represented by a lawyer, while the State and local authorities may be represented by one of their officials (Article R. 311-9). Kohen Avocats, in the 16th arrondissement of Paris, acts for expropriated owners, tenants and evicted traders, as well as for expropriating authorities. Contact: +33 6 89 11 34 45.

A public inquiry under way, an offer received, a summons before the judge?

Understanding your situation

Expropriation in Paris and France, explained

Expropriation can be ordered only after a public utility “established beforehand and formally following an inquiry” (Article L. 1 of the French Expropriation Code). How the operation is declared, how to challenge it, how compensation is set, and what tenants, traders and former owners can obtain.

Key points

Four conditions before anyone can be dispossessed

What the administration must have done, and what the expropriated owner can check at each stage.

1

A public utility established beforehand and formally following an inquiry, declared by the competent State authority, and by decree issued after consulting the Council of State (décret en Conseil d'État) for certain operations (Article L. 1 and Article L. 121-1).

2

Plots and owners identified in an adversarial process, then declared transferable by an order listing them, where the list does not already result from the declaration of public utility (Article L. 132-1).

3

A transfer of ownership by sale by agreement or, failing that, by order of the expropriation judge, made on the basis of documents showing that the formalities of the administrative phase have been completed (Article L. 220-1 and Article L. 221-1).

4

Fair compensation paid in advance, set failing agreement by the expropriation judge, a judge of a judicial court (tribunal judiciaire) of the département (Article L. 311-5 and Article L. 211-1).

The timetable is regulated. The act declaring public utility must be adopted no later than one year after the close of the inquiry, a period extended to eighteen months where a decree issued after consulting the Council of State is required (Article L. 121-2). It sets the period allowed for carrying out the expropriation, which may not exceed five years, or ten years if the operation is provided for by a local urban development plan, a limit that does not apply to a declaration made by decree issued after consulting the Council of State (Article L. 121-4). If the initial period does not exceed five years, an act adopted in the same form may extend it once, for no longer than the initial period and without a new inquiry if there are no new circumstances; any other extension requires a decree issued after consulting the Council of State (Article L. 121-5).

This time limit protects the owner. The Court of Cassation (Cour de cassation) holds that “the expropriation judge may not order the transfer of ownership where, at the date of the judge's order, the declaration of public utility of the operation has lapsed” (our translation) (Cass. 3e civ., 9 April 2026, No. 24-17.155); it dismissed the appeals brought by the expropriating municipality. The expropriation order, by itself and from its date, extinguishes all rights in rem and personal rights over the property, and the rights of registered creditors are transferred to the compensation (Articles L. 222-2 and L. 222-3).

The expropriating authority may notify its offers as soon as the preliminary inquiry opens, if it is able to identify the plots concerned (Article R. 311-4). Exchanges therefore often begin before the declaration of public utility: this is the time to gather title deeds, leases, plans and comparable sales. See our article on the judicial phase and the setting of compensation by the judge.

The administrative phase

Challenging the declaration of public utility and the transferability order

The administrative court reviews the procedure and the cost-benefit balance of the operation; its decisions determine the fate of the expropriation order.

Public inquiry

The preliminary inquiry is governed by the Expropriation Code or, for operations likely to affect the environment, by the Environmental Code (Article L. 110-1). The inquiry commissioner's conclusions are disclosed to interested persons on request (Article L. 112-1).

Declaration of public utility

It is issued by the competent State authority no later than one year after the close of the inquiry, eighteen months if a decree issued after consulting the Council of State is required, and specifies the period allowed for carrying out the expropriation (Articles L. 121-2 and L. 121-4).

Transferability order

It identifies the plots or rights in rem whose expropriation is necessary for the operation (Article L. 132-1).

Challenge

The administrative court is seised by an application against the decision, within two months of its notification or publication (Article R. 421-1 of the Code of Administrative Justice).

Plea of illegality

In support of a challenge to the transferability order, the applicant may plead the unlawfulness of an extension of the declaration of public utility, which forms a single complex operation (opération complexe) with that declaration and with the order (CE, 12 October 2018, No. 417016).

Annulment and the expropriation order

If the annulment of the declaration of public utility or of the transferability order becomes final, any expropriated owner may ask the judge to find that the expropriation order has no legal basis, within two months of notification of the decision or of the information given by the expropriating authority (Article L. 223-2, Articles R. 223-2 and R. 223-3).

Review focuses first on the cost-benefit balance. The Council of State (Conseil d'État) recalls that an operation can be declared of public utility only if the harm to private property, the financial cost and, where relevant, the social drawbacks or the harm to other public interests are not excessive in relation to the interest it presents. Ruling as the court of cassation, it upheld the assessment of the administrative court of appeal, which had annulled the declaration of public utility of an urban boulevard whose cost and impact on a remarkable landscape were excessive, and which had also found that the inquiry commissioner had shown initial bias, expressed in the press the day after the inquiry opened (CE, 28 June 2021, No. 434150).

The sanction then moves to the ordinary courts. The expropriation order can be challenged only by an appeal on points of law (pourvoi en cassation), for lack of jurisdiction, abuse of power or procedural defect (Article L. 223-1). The Court of Cassation quashed, without remitting the case, an order for partial expropriation made without a prior survey document, pointing out that “a survey report (procès-verbal d'arpentage) must first be drawn up, so that the plots taken are designated according to the numbering resulting from that document” (our translation) (Cass. 3e civ., 28 May 2025, No. 23-19.940). Conversely, it now holds that “the forthcoming annulment of the declaration of public utility or of the transferability order does not give rise to cassation of the expropriation order for loss of legal basis” (our translation) (Cass. 3e civ., 16 January 2025, No. 23-21.174). This rule applies immediately, unless a final annulment was notified before that judgment; as no final annulment had occurred in that case, the ground was declared inadmissible and the expropriated company's appeals were dismissed. The expropriated owner must then use the procedure under Article L. 223-2.

Both fronts are pursued together: the administrative court's decision determines the fate of the expropriation order, while compensation is argued before the expropriation judge. See our article on challenging the declaration of public utility and the compensation, and our public law page.

Both sides

You are being expropriated, or you are carrying out the operation

The same rules read differently depending on whether you are subject to the expropriation or pursuing it.

You are an owner, occupier or business operator

  • Check the declaration of public utility, its duration, the transferability order and the notification of the acts.
  • Reply to the offer within one month with a detailed, costed claim, item of compensation by item.
  • Prepare the written submissions, the comparable sales and the site visit, then respond to the government commissioner's conclusions.

You are a public authority, developer or public body

  • Secure the inquiry, the declaration of public utility, the plot survey (état parcellaire) and the period for completion.
  • Notify offers that distinguish main compensation from ancillary compensation, and draft the written submissions referring the case to the judge.
  • Justify the classification and the comparables used, and prepare sales by agreement.

The amount claimed binds the judge. Under Article R. 311-22, the judge rules within the limits of the parties' claims, and a defendant that has not notified its reply within six weeks is deemed to stand by its offers or its reply to the offers. The Court of Cassation infers that, where the expropriated owner has made a claim, “the judge may not award more than that amount, even where the government commissioner's proposal is higher” (our translation) (Cass. 3e civ., 9 October 2025, No. 24-12.637). Conversely, an expropriated owner who has remained silent may obtain more than the offer, without exceeding the government commissioner's proposal; in that case, the expropriating authority's appeal was dismissed. A claim costed too low limits the judge: the firm sets it after a full review of the property.

The points the firm examines in every case:

Validity of the DUP Transferability order Reference date Actual use Building land Comparable sales Reinvestment allowance Time limits for challenges Business eviction Total taking

The judicial phase

The expropriation judge and the setting of compensation

A written procedure, with short time limits, that turns on valuation dates and comparables.

Offer

The expropriating authority notifies its offers, distinguishing the main compensation from each item of ancillary compensation, and invites the person concerned to state in writing, within one month, either acceptance or the detailed amount claimed (Article L. 311-4 and Article R. 311-5).

Referral to the judge

Failing agreement within that period, the more diligent party refers the matter to the judge by written submissions sent to the court registry; the parties must be represented by a lawyer (Article R. 311-9). The expropriated owner may refer the matter to the judge once the expropriation order has been made (Article L. 311-6).

Written submissions

The defendant has six weeks to reply to the claimant's submissions; the submissions state the amount of each item of compensation and are accompanied by the supporting documents (Articles R. 311-11 and R. 311-12).

Government commissioner

On pain of inadmissibility, the government commissioner notifies the conclusions at least eight days before the site visit, with the comparable sales used and a reasoned valuation (Article R. 311-16).

Site visit

The judge visits the property within two months of the order setting the date of the visit, the parties being notified fifteen days in advance, and then holds the public hearing (Articles R. 311-14, R. 311-15 and R. 311-18).

Judgment and appeal

The judgment distinguishes the main compensation from the ancillary compensation (Article L. 321-3). An appeal must be lodged within one month of notification of the judgment and does not suspend its effects (Articles R. 311-24 and R. 311-25).

Two dates govern the valuation. The judge takes the property as it stood at the date of the expropriation order, without compensating improvements made in order to obtain higher compensation, which are presumed to have been made for that purpose after the inquiry opened (Article L. 322-1). The property is valued at the date of the first-instance judgment but, subject to the rules specific to building land and reserved sites, only its actual use one year before the inquiry opened counts, save for particular dates, and increases in value caused by the announcement of the project are disregarded (Article L. 322-2). In a partial expropriation, the classification of the land is assessed “by reference to the whole plot from which the portion taken was detached, and not on the basis of the portion taken alone” (our translation); the Court of Cassation dismissed the appeal of the expropriating metropolitan authority (Cass. 3e civ., 6 March 2025, No. 23-22.427).

Classification as building land (terrain à bâtir) requires a zoning that allows construction and actual servicing by networks of adequate capacity (Article L. 322-3). In a zone earmarked for comprehensive development, where only the capacity of the networks is in dispute, “it is for the expropriating authority, which is responsible for developing that zone and alone holds the information from the file referred to in Article R. 112-5 of the Expropriation Code, to prove that inadequacy” (our translation) (Cass. 3e civ., 8 January 2026, No. 24-22.726). The opposite limit also applies: “only loss based on a legally protected right on the date of expropriation can be compensated” (our translation), so that a building erected unlawfully on a plot where construction is not allowed gives no right to compensation, even where the action for demolition is time-barred (Cass. 3e civ., 15 February 2024, No. 22-16.460).

The reinvestment allowance (indemnité de remploi) covers the costs normally incurred in buying a property of the same kind, unless the property was well known to be intended for sale or was put up for sale in the six months before the declaration of public utility (Article R. 322-5). The Paris Court of Appeal granted it to a company that had acquired the property after the declaration, holding that “nor has it been shown that the property was well known to be intended for sale within the meaning of Article R. 322-5 of the Expropriation Code cited above” (our translation), and set it at €422,800 (CA Paris, pôle 4, ch. 7, 8 January 2026, No. 24/08024). See our article on the procedure for setting and calculating compensation.

Other parties concerned

Tenants, traders, total taking, the right to require purchase and retrocession

Expropriation also affects those who occupy or run a business on the property, and leaves rights after the transfer.

The owner must inform the expropriating authority of tenants, agricultural tenants and holders of rights of use or easements (Article L. 311-2); other interested parties who do not come forward after the collective public notice lose any right to compensation (Article L. 311-3).

The judge awards separate compensation to the parties who claim it on different grounds (Article L. 321-2).

The expropriating authority may offer an evicted trader, craftsman or industrial operator equivalent premises in the same built-up area, and the judge settles disputes over whether the premises are equivalent (Article L. 322-12).

Removal allowances for expropriated owners, tenants and evicted occupiers are payable notwithstanding any objection by creditors (Article L. 323-1).

An expropriated owner whose remaining part of a building can no longer be used under normal conditions may request a total taking (emprise totale), within one month of notification of the offers (Article L. 242-1 and Article R. 242-1).

One year after publication of the declaration of public utility, the owner may serve formal notice on the expropriating authority to acquire the property within two years; failing agreement, the judge orders the transfer and sets the price (Articles L. 241-1 and L. 241-2). The owner of land on a reserved site or in a concerted development zone (zone d'aménagement concerté) has a comparable right to require purchase (droit de délaissement): failing agreement on the price within a year, the expropriation judge orders the transfer and sets the price (Articles L. 152-2, L. 311-2 and L. 230-3 of the French Planning Code).

For a trader, compensation follows the loss actually suffered. The Court of Cassation lays this down as a principle: “The evicted business operator may claim compensation for the business disruption resulting from the expropriation, provided that it is distinct from the loss compensated by the award of the total value of the business and by the reinvestment allowance.” (our translation) It adds that partial eviction may also affect the business continued outside the land taken; it quashed the judgment that had refused any compensation on that ground (Cass. 3e civ., 4 July 2024, No. 23-15.027). For an evicted pharmacy, the Paris Court of Appeal set total compensation at €1,651,843, adopting for the business disruption, on the facts of the case, “the customary method of 15 days of average turnover over the last three years” (our translation) (CA Paris, pôle 4, ch. 7, 12 December 2024, No. 23/04939).

After the transfer, the right of retrocession (rétrocession) remains open: if the property has not been put to the intended use within five years of the expropriation order, or has ceased to be put to that use, the former owners or their universal successors may ask for it to be handed back for thirty years, unless a new declaration of public utility is required (Article L. 421-1). The Court of Cassation specifies when a waiver is possible: “The expropriated owner may waive the right of retrocession, which is a matter of protective public policy, once that right has accrued.” (our translation) The right accrues five years after the order if the property has not been put to its intended use, or earlier if the project carried out is incompatible with the one declared of public utility; a waiver agreed before that date has no effect (Cass. 3e civ., 19 January 2022, No. 20-19.351). The Court is strict on time limits: the claim must be brought within two months of notification of the expropriating authority's refusal and within thirty years of the order, and the prior request does not interrupt the thirty-year limitation period; the former owners lost (Cass. 3e civ., 19 September 2024, No. 23-20.053).

A commercial lease follows its own rules outside expropriation: see our commercial lease page. Where a public authority acquires by pre-emption, the price is set, failing agreement, by the expropriation court, without a reinvestment allowance (Article L. 213-4 of the French Planning Code): see our pre-emption right page.

FAQ

Frequently asked questions

Fourteen detailed answers, based on the legislation in force and on verified decisions.

What does an expropriation lawyer in France do, and when should you consult one?

As soon as the project becomes concrete: the opening of the public inquiry, a first approach from a land agency, the notification of an act. Expropriation can be ordered only if it serves a public utility “established beforehand and formally following an inquiry”, after the plots have been identified in an adversarial process and the owners traced (Article L. 1 of the French Expropriation Code). The expropriating authority may notify its offers as soon as the inquiry opens (Article R. 311-4), and the person concerned then has one month to accept or to state the amount claimed (Article R. 311-5).

Two fronts open. Before the administrative court, the declaration of public utility and the transferability order can be challenged within two months of their publication or notification (Article R. 421-1 of the Code of Administrative Justice). Before the expropriation judge, compensation is argued through written submissions, and the parties must be represented by a lawyer (Article R. 311-9 of the Expropriation Code).

The firm checks that the procedure is lawful, values the property with you, drafts the reply to the offer and the written submissions, attends the site visit and, where appropriate, negotiates a sale by agreement. It also advises the public authorities and developers that carry out the operation. See our article on expropriation in Paris.

Can you challenge a declaration of public utility (DUP) in France?

Yes, before the administrative court, by an application lodged within two months of its publication or notification (Article R. 421-1 of the Code of Administrative Justice). The transferability order is challenged in the same way, and the applicant may then plead the unlawfulness of an extension of the declaration of public utility, which forms a single complex operation with that declaration and with the order (CE, 12 October 2018, No. 417016).

The grounds concern both procedure and substance. Procedure: the regularity of the inquiry (Article L. 110-1 of the French Expropriation Code), the one-year period between the close of the inquiry and the declaration (Article L. 121-2), and the period of validity and its extension (Articles L. 121-4 and L. 121-5). Substance: the Council of State accepts public utility only if the harm to private property, the financial cost and the other drawbacks are not excessive in relation to the interest of the operation. Ruling as the court of cassation, it upheld the assessment of the administrative court of appeal, which had annulled a declaration for a road project whose cost and impact on the landscape were excessive, also taking into account the inquiry commissioner's bias expressed in the press (CE, 28 June 2021, No. 434150).

Whether a challenge is worthwhile depends on the file: it may bring down the operation, or carry weight in the negotiation. The administrative court does not set compensation, which is a matter for the expropriation judge alone. See our public law page.

What happens to an expropriation if the DUP is annulled after the expropriation order?

If the declaration of public utility or the transferability order is finally annulled by the administrative court, any expropriated owner may ask the expropriation judge to find that the order transferring ownership has no legal basis and to annul it; the judge then rules on the consequences (Article L. 223-2 of the French Expropriation Code).

The time limit is short. The expropriated owner must refer the matter to the judge within two months of notification of the final decision annulling the act, on pain of inadmissibility, or, if not a party before the administrative court, within two months of the information the expropriating authority must send (Articles R. 223-2 and R. 223-3). The file includes the annulment decision, the expropriation order and, where applicable, the decision setting the compensation (Article R. 223-1). If the property can be returned, the judge specifies what goes back to the expropriated owner and the sums the owner must repay; otherwise, the claim is settled by damages (Article R. 223-6).

An annulment that is merely pending no longer makes it possible to seek cassation of the order for loss of legal basis. The Court of Cassation holds that “the forthcoming annulment of the declaration of public utility or of the transferability order does not give rise to cassation of the expropriation order for loss of legal basis” (our translation) (Cass. 3e civ., 16 January 2025, No. 23-21.174); the rule applies immediately, unless a final annulment was notified before that judgment, and the expropriated owner must use Article L. 223-2. In that case, there being no final annulment, the ground was declared inadmissible and the appeals were dismissed. The order can still be challenged on points of law for lack of jurisdiction, abuse of power or procedural defect (Article L. 223-1).

I have received the expropriating authority's offer: how long do I have to reply, and what should I say?

Within one month of notification, in writing: either you accept, or you state the detailed amount you claim. The offer must distinguish the main compensation, any offers in kind and each item of ancillary compensation (Article R. 311-5 of the French Expropriation Code). Failing agreement within that month, the more diligent party may refer the matter to the judge (Article R. 311-9). If the expropriating authority notifies no offer, any interested party may serve it with formal notice to do so once the transferability order has been made (Article R. 311-7).

The content of the reply matters as much as its timing. The judge rules within the limits of the parties' claims (Article R. 311-22), and the Court of Cassation draws a clear consequence: where the expropriated owner has made a claim, “the judge may not award more than that amount, even where the government commissioner's proposal is higher” (our translation) (Cass. 3e civ., 9 October 2025, No. 24-12.637). A claim costed too low can therefore cap the compensation.

To cost the claim, the tax authorities provide expropriated owners, on request and without charge, with the land values declared in sales over the last five years (Article L. 322-10). The firm gathers these comparables, examines the condition, floor area, letting situation and classification of the property, then drafts a reply that sets out each item of compensation and reserves the request for a total taking, which must be made within the same month (Article R. 242-1).

How do proceedings before the expropriation judge work in France?

They are written and quick. The judge is seised by written submissions sent to the registry of the court for the place where the property is located, and the parties must be represented by a lawyer (Article R. 311-9 of the French Expropriation Code). The defendant has six weeks to notify its reply (Article R. 311-11). Each set of submissions sets out the arguments, attaches the documents and states the amount claimed or offered for the main compensation and for each item of ancillary compensation (Article R. 311-12).

The judge then sets, by order, the date of the site visit, which takes place within two months but after the six weeks have expired (Article R. 311-14). The parties are notified at least fifteen days in advance and the visit takes place in their presence (Article R. 311-15). The government commissioner notifies the conclusions at least eight days before the visit, on pain of inadmissibility, with the comparable sales relied on (Article R. 311-16). The public hearing follows the visit (Article R. 311-18); the parties may only develop points made in their written submissions (Article R. 311-20). For a property that is difficult to value, the judge may appoint an expert (Article R. 322-1).

The expropriating authority alone bears the costs of the first-instance proceedings (Article L. 312-1). The firm prepares the visit as it would a hearing: plan, photographs, annotated comparables, written reply to the government commissioner's conclusions. See our article on the judicial phase.

How is the main expropriation compensation calculated in France?

It makes good the loss of the property, under a general principle: compensation covers the whole of the direct, material and certain loss caused by the expropriation (Article L. 321-1 of the French Expropriation Code). The judge takes the property as it stood at the date of the order (Article L. 322-1) and values it at the date of the first-instance judgment, taking into account, subject to the rules on building land, only its actual use one year before the inquiry opened, save for particular reference dates, and disregarding increases in value caused by the announcement of the operation (Article L. 322-2).

The valuation relies on comparable sales taken from transfer deeds, which the government commissioner must reference in the conclusions (Article R. 311-16). The judge takes into account agreements reached by consent within the perimeter of the operation, and uses them as the basis where they cover a sufficient share of the owners and of the land areas (Article L. 322-8). The judge may not exceed the administration's valuation if a transfer less than five years earlier gave rise to a final tax valuation or to a lower declared value, unless it is shown that the valuation does not properly reflect market trends (Article L. 322-9). The cost of works ordered by a safety or public health measure and not carried out is deducted, although compensation may not be reduced to the value of the bare land (Article L. 322-7).

Two decisions mark the limits. In a partial expropriation, the classification is assessed “by reference to the whole plot from which the portion taken was detached” (our translation) (Cass. 3e civ., 6 March 2025, No. 23-22.427). By contrast, an unlawful building on a plot where construction is not allowed is not compensated, for want of a legally protected right (Cass. 3e civ., 15 February 2024, No. 22-16.460).

Can my land be classified as building land (terrain à bâtir)?

The classification is decisive for the value. It is reserved for land which, one year before the inquiry opened, is both located in a sector designated as buildable by the planning document, or in a currently built-up part of the municipality where there is no such document, and actually served by an access road, an electricity network, a drinking water network and, where the rules so require, a sewerage network, located in the immediate vicinity and of a capacity suited to the building potential (Article L. 322-3 of the French Expropriation Code). Otherwise, the land is valued solely according to its actual use.

Proof is open to debate. In a zone earmarked for comprehensive development, the capacity of the networks is assessed by reference to the whole zone, and the Court of Cassation holds that, where only that capacity is disputed, “it is for the expropriating authority, which is responsible for developing that zone and alone holds the information from the file referred to in Article R. 112-5 of the Expropriation Code, to prove that inadequacy” (our translation); it upheld the classification as building land against the municipality (Cass. 3e civ., 8 January 2026, No. 24-22.726).

The valuation then takes into account the legal and actual building potential at the reference date and any easements, unless the expropriating authority acted with fraudulent intent (Article L. 322-4). Land on a reserved site is valued as if it were no longer included in it (Article L. 322-6). The firm reconstructs the planning and servicing position at the right date, with supporting documents.

What ancillary compensation can an expropriated owner claim in France?

Any compensation that makes good a direct, material and certain loss caused by the expropriation (Article L. 321-1 of the French Expropriation Code). The judgment distinguishes it from the main compensation and states its basis (Article L. 321-3), as the offers must also do (Article R. 311-5).

The reinvestment allowance is the most common: it covers the costs of all kinds normally incurred in acquiring a property of the same kind at a price equal to the main compensation, taking into account the tax advantages linked to the replacement purchase, but it is not due if the property was well known to be intended for sale or was put up for sale in the six months before the declaration of public utility (Article R. 322-5). The Paris Court of Appeal granted it, noting that “nor has it been shown that the property was well known to be intended for sale within the meaning of Article R. 322-5 of the Expropriation Code cited above” (our translation), and set it at €422,800 for a property complex (CA Paris, pôle 4, ch. 7, 8 January 2026, No. 24/08024).

Depending on the case, removal costs may be added, payable despite creditors' objections (Article L. 323-1), as well as relocation costs, business disruption or loss of stock for a business. The Paris Court of Appeal thus compensated an evicted pharmacy for business disruption, loss on wages and charges, stock and redundancies (CA Paris, pôle 4, ch. 7, 12 December 2024, No. 23/04939). For a building in co-ownership where the declaration of public utility provides for the land taken to be removed from the original property, the judge also sets compensation for the consequences of that removal (Articles L. 122-6 and L. 321-4). The firm lists every head of loss from the reply to the offer onwards, because the judge rules only on what is claimed (Article R. 311-22).

What are my rights as a tenant or trader in an expropriated building in France?

You are entitled to compensation separate from the owner's (Article L. 321-2 of the French Expropriation Code). The owner must inform the expropriating authority of your existence (Article L. 311-2). Come forward yourself without waiting: other interested parties, who are neither owners nor declared by them, lose any right to compensation if they do not come forward after the collective public notice (Article L. 311-3).

For a trader, craftsman or industrial operator, the expropriating authority may offer equivalent premises in the same built-up area instead of compensation, in which case the tenant may receive, in addition to the removal allowance, compensation for loss of use; the judge settles disputes over equivalence (Article L. 322-12). Otherwise, compensation makes good the whole of the direct, material and certain loss (Article L. 321-1), starting with the loss of the business. The Court of Cassation accepts compensation for a distinct business disruption, including in the case of partial eviction, provided the operator proves it; it quashed the judgment that had refused it (Cass. 3e civ., 4 July 2024, No. 23-15.027). The Paris Court of Appeal set the compensation of an evicted pharmacy at €1,651,843, also finding, on the facts of the case, that the operating company “must be compensated for the loss on wages and charges” (our translation) (CA Paris, pôle 4, ch. 7, 12 December 2024, No. 23/04939).

Commercial, craft, industrial or agricultural tenants may obtain an advance of 50% of the offers, under the conditions of Article L. 323-3. Owner-occupiers on modest incomes have a priority right to rehousing (Article L. 423-1). See also our commercial lease page.

Only part of my property is being expropriated: can I require the whole to be taken?

You can ask the judge, who decides, in the cases provided for by law. Where the expropriation covers only part of a building and the remaining part can no longer be used under normal conditions, the expropriated owner may ask the judge for a total taking; the same applies to a plot of bare land reduced to a quarter of its area, if the owner has no immediately adjoining land and the remaining area is less than ten ares (Article L. 242-1 of the French Expropriation Code). If the request is granted, the judge sets the expropriation compensation and the price of the additional portion acquired (Article L. 242-2). Other cases of total taking concern agricultural plots and holdings that can no longer be farmed under normal conditions or whose structure is compromised (Articles L. 242-3 and L. 242-4).

The time limit is one month from notification of the offers (Article R. 242-1), and the notifications must mention it (Article R. 311-5). The request is therefore prepared at the same time as the reply to the offer, and the other consequences of the partial taking are costed as direct, material and certain loss (Article L. 321-1).

Partial expropriation also needs to be monitored upstream. The Court of Cassation annulled an order for partial expropriation made without a prior survey document designating the plots resulting from the division: “The order is therefore vitiated by a procedural defect which must lead to its annulment.” (our translation) (Cass. 3e civ., 28 May 2025, No. 23-19.940). For valuation purposes, the classification of the land is judged on the whole of the original plot, not on the portion taken alone (Cass. 3e civ., 6 March 2025, No. 23-22.427). The firm examines the plot survey, the division and the use of the remaining land before replying to the offer.

When do you have to leave the property, and when is the compensation paid?

The expropriation order gives the expropriating authority possession, but only once it has paid the compensation or, if there is an obstacle to payment or a refusal to accept it, deposited it, or once the offer of replacement premises has been accepted or approved (Article L. 222-1 of the French Expropriation Code). Occupiers must leave within one month of that payment, deposit or acceptance; this period cannot be changed, even by a court, and eviction may then be enforced (Article L. 231-1).

An appeal against the judgment setting compensation does not suspend its effects, but a judgment given before the order has become final cannot be enforced before the transfer of ownership (Article R. 311-25). In the meantime, owners who occupy residential or professional premises may obtain, once the judge has been seised and the order made, an advance of 50% of the expropriating authority's offers, limited to 50% of the administration's valuation if the offers exceed it, unless the expropriating authority provides rehousing or relocation (Article L. 323-3).

If compensation set by a final decision is neither paid nor deposited within one year, the expropriated owner may ask for its amount to be determined afresh (Article L. 323-4). The firm monitors these dates and asserts these rights with the expropriating authority.

How do you appeal a judgment setting expropriation compensation in France?

The appeal is lodged by the parties or by the government commissioner within one month of notification of the judgment, by a declaration made or sent by registered letter to the registry of the court of appeal, together with a copy of the decision (Article R. 311-24 of the French Expropriation Code). It does not suspend the judgment's effects (Article R. 311-25).

The time limits for written submissions are enforced by the court of its own motion. In the version in force since 1 October 2026, the appellant must notify its submissions to the other parties' lawyers and file a copy with the registry within three months of the declaration of appeal, failing which the appeal lapses; the respondent has three months from that notification, on pain of inadmissibility, and must lodge any cross-appeal within the same period; the government commissioner submits within the same period and subject to the same sanction (Article R. 311-26). Documents are disclosed at the same time as the submissions. The parties must be represented by a lawyer (Article R. 311-27), and the court rules on the written submissions (Article R. 311-28).

Before the court of appeal too, the property is still valued at the date of the first-instance judgment (Article L. 322-2), and the limit set by the parties' claims applies (Article R. 311-22). An appeal is therefore prepared as soon as the judgment is read: heads of loss refused, comparables rejected, errors of date or classification. The firm drafts the submissions within the time limit and responds to those of the expropriating authority and the government commissioner.

The project was never carried out: can you get your expropriated property back?

Yes, through the right of retrocession. If the property has not been put to the intended use within five years of the expropriation order, or has ceased to be put to that use, the former owners or their universal successors may ask for it to be handed back for thirty years from the order, unless a new declaration of public utility is required (Article L. 421-1 of the French Expropriation Code). The price is assessed under the rules of expropriation, and the repurchase must be signed and paid for within one month of the price being set, on pain of forfeiture (Articles L. 421-2 and L. 421-3).

The procedure requires a request to the expropriating authority and then, where the dispute concerns the claimant's right, an action before the judicial court within two months of notification of its refusal, on pain of forfeiture (Article R. 421-6). The Court of Cassation applies this strictly: “the court action for retrocession must be brought within two months of receipt of notification of the administrative decision of refusal and within thirty years of the expropriation order” (our translation), and the prior request does not interrupt the latter period; the former owners lost (Cass. 3e civ., 19 September 2024, No. 23-20.053).

A waiver signed too early is invalid: the right can be given up only once it has accrued (Cass. 3e civ., 19 January 2022, No. 20-19.351). When the expropriating authority decides to sell, it must offer retrocession; where the former owners are identified, silence for two months counts as a waiver (Articles R. 421-1 and R. 421-3), and otherwise a notice is published and the right must be declared within three months, on pain of forfeiture (Articles R. 421-4 and R. 421-5).

What fees does an expropriation lawyer charge?

Except in cases of urgency or force majeure, fees are set out in a written fee agreement, in accordance with Article 10 of the Law of 31 December 1971: before you commit, you know what the engagement covers and what it costs. The agreement specifies the amount of the fees, or how they are calculated, for the foreseeable work, as well as the expected costs and disbursements. The fixed fee is set after reading the relevant documents: declaration of public utility, transferability order, the expropriating authority's offer, title deed or lease, comparable sales.

The firm prefers a fixed fee for each stage: analysis of the procedure, challenge to the declaration of public utility or the transferability order, reply to the offer and negotiation, written submissions before the expropriation judge and site visit, appeal, retrocession. Expert fees are added to the fees. Any new work is covered by an amendment to the agreement, with no unexpected billing. Before the expropriation judge, the expropriating authority alone bears the costs of the first-instance proceedings (Article L. 312-1 of the French Expropriation Code); the lawyer's freely agreed fees are not part of those costs, since lawyers' remuneration is included in court costs (dépens) only to the extent that it is regulated (Article 695 of the Code of Civil Procedure).

For an initial opinion based on your documents, the preliminary case review at €80 incl. VAT, through the form on this page, leads to a written analysis within 24 working hours. First contact: +33 6 89 11 34 45.

References

Official texts and related pages

The sources for this page, checked on 31 October 2026, and the firm's related areas of practice.

Official texts

Decisions cited

A public inquiry, an offer received, compensation to defend?

The firm can be reached 24/7. Send the declaration of public utility or the inquiry notice, the transferability order, the expropriating authority's offer, your title deed or lease and any documents you have: Hassan Kohen reviews the procedure, the classification of the property and the time limits, then tells you which route suits your case: a challenge before the administrative court, a reply to the offer, negotiation, written submissions to the expropriation judge, an appeal or retrocession.

Latest news.

What our clients say

4,885 Google reviews
Share your review
Contact Mobile
3 weeks ago

Very satisfied! I would like to thank Maître Esther Cornu here, who managed to resolve a very complicated dispute in a divorce and family law matter...Thanks to Maître Cornu, a judgment was handed down in my favour even though it was far from a foregone conclusion...So I recommend this law firm

Google review translated from French

Claude Frasson
3 weeks ago

A precise and concrete analysis and an immediate response. Excellent.

Google review translated from French

Basel Alali
3 weeks ago

I highly recommend this lawyer for his professionalism, honesty, and transparency. He helped me successfully and guided me through the process with great care and expertise. What I particularly appreciated was his honest approach and the fact that he recommended practical, cost-effective options instead of immediately pushing for the most expensive solution. He genuinely focused on finding the right approach for my situation. I’m very grateful for his support and would definitely recommend him to anyone looking for a trustworthy and professional lawyer in France.

beatrice lefevre
3 weeks ago

Thank you for this detailed, precise help, with a proposal at the end on whether or not to continue (very quick response as well)

Google review translated from French

Jean-pierre Steinmetz
1 month ago

Very good advice given by Maître Cornu during our meeting on 16 October.

Google review translated from French

John Roberts
1 month ago

Very professional and responsive service. The lawyer quickly and carefully checked the validity of my wife’s residence permit in light of a specific legal regime. His work gave us clarity, whereas the usual administrative procedures were long and ambiguous. I appreciated his efficiency and professionalism, and I recommend his services.

Google review translated from French

Jean-François PAPA
1 month ago

I would like to warmly thank Maître Esther Cornu for her professionalism, her availability and the quality of her support. In a case of particular importance for my professional future, she showed great responsiveness, rigour and a gift for explaining things, taking the time to answer my questions precisely and to explain the various legal steps to me. I particularly appreciate the clarity of her analyses, her seriousness and her commitment in following up my case. Many thanks to Maître Esther Cornu for listening and for her support. I highly recommend!

Google review translated from French

Sandra Imbert
1 month ago

A huge thank you to Maître Esther Cornu from Kohen Avocats for her support during a particularly difficult time. Her attentiveness, empathy, and humanity touched me deeply. She was able to answer my questions with clarity and sensitivity, while demonstrating great professionalism and fully respecting the confidentiality of the case. Beyond her professional qualities, I met a deeply humane lawyer whose support made a real difference. I sincerely recommend her.

Google review translated from French

Djamel Haddouche
1 month ago

I am facing a dispute with my employer, and the support provided by Maître Hassan COHEN as well as Maître Esther Cornu is excellent. The answers are clear and well-thought-out, they genuinely listen, and interactions are very pleasant. Thank you again, I highly recommend.

Google review translated from French

Nima Sdc
1 month ago

A law firm that is attentive to its clients. Maître Kohen and his team are very, very professional and truly master their field.

Google review translated from French

jules p
1 month ago

I highly recommend Cabinet Kohen, and particularly Maître Esther Cornu, who supported me throughout my case. She skillfully combined attentiveness and expertise to guide me through these difficult and stressful times. She was always available to answer all my questions with precision and responsiveness. Thanks to her preparation work, I was able to approach the situation with much greater peace of mind. Her kindness and humanity made me feel at ease throughout our exchanges. I am very grateful to her for her support and professionalism. You can trust her with your eyes closed.

Google review translated from French

Jocelyne Chassard
2 months ago

I have just spoken on the phone with Monsieur Chahdi from your law firm: I wanted to congratulate you on your online article regarding order no. 519225 of the Conseil d’État dated August 30, 2026. You clearly explained the content of this order, which does not grant prefectures a general blank check to replace a demonstration ban with a restrictive receipt modifying one or more circumstances of a demonstration, but which, in a specific case, held that the applicants had not sufficiently demonstrated a serious and disproportionate infringement on the fundamental freedom to publicly express opinions. As I told Mr. Chahdi, I am facing this restrictive receipt issue in Reims for a demonstration scheduled for tomorrow afternoon in front of the judicial court: the organizer has just filed an urgent fundamental freedom petition (référé-liberté) before the Châlons-en-Champagne Administrative Court. Monsieur Chahdi initially seemed surprised by the call from an 'ordinary citizen', but he listened to me and answered with courtesy.

Google review translated from French

Menah'em
3 months ago

I would like to express my gratitude to the Kohen Avocats law firm and especially to Maître Chahdi. From our very first phone call, Maître Chahdi was available, attentive, and offered remarkable advice. The firm's reception and follow-up reflect a very high level of standards and expertise. Many thanks to the entire team for their support and impeccable professionalism.

Google review translated from French

Мария Двирник
3 weeks ago
Moula Brahimi
3 weeks ago

Good experience. And good work, thank you for everything.

Google review translated from French

Faiza Traduction
1 month ago
Alain Arsaut
1 month ago

Saw Hassan on the TV news

Google review translated from French

TOULEIMAT HACHEM
1 month ago
emilie lepicard
1 month ago
إبراهيم عيسى
1 month ago
Monique Firmin
2 months ago

Excellent phone reception. Great professionalism.

Google review translated from French

Louna Sisi
2 months ago

Excellent

Google review translated from French

Sophie Lascar
3 months ago
Solal Gaillard
3 months ago
Preliminary case review

Send your documents. Receive an analysis.

Send us the documents in your case. Hassan KOHEN reviews them personally and sends you a first written analysis of your situation within 24 working hours.

  • Written analysis by the lawyer, €80 incl. VAT
  • Personal reply within 24 working hours
  • 100% confidential, legal professional privilege guaranteed
  • Up to 1 GB of documents in total, folders and sub-folders accepted
80 €incl. VAT

Preliminary review of your case. Review of your documents and a first written analysis by Hassan KOHEN within 24 working hours. Payment is made online after this form is submitted.

  • Up to 1 GB of documents in total, folders and sub-folders accepted
  • Secure payment, no card details stored
  • Terms and fee agreement

Click or drag your files here
All formats accepted (PDF, Word, images, etc.)

Sending...

Payment constitutes a request for immediate performance of your analysis. Your data is used solely to process your request.
Terms · Privacy policy.

Free legal AI

A question of French law? Ask Judith.

Judith searches the French codes, the Constitution, the European Convention on Human Rights and the courts’ decisions, then shows you the texts and the passages of rulings that may answer your question, with their official source. Free, no account; she writes nothing for you. Questions and results are in French. Discover Judith, the firm’s free legal AI.

Three searches a day. Your question is recorded and reviewed by the firm to improve the tool: do not enter names or sensitive information.