Civil United Kingdom
Tripwire South LLC v Astor International Limited & Ors
Neutral Citation Number: [2026] EWHC 2646 (KB)
Case No: KB-2025-003647
IN THE HIGH COURT OF JUSTICE
KING'S BENCH DIVISION
Royal Courts of Justice
Strand, London, WC2A 2LL
Date: 16/10/2026
Before :
SIR CLIVE FREEDMAN SITTING AS A DEPUTY JUDGE OF THE HIGH COURT
– – – – – – – – – – – – – – – – – – – – –
Between :
| TRIPWIRE SOUTH LLC | Claimant | |
| – and – | ||
| (1) ASTOR INTERNATIONAL LIMITED (2) ASTOR DEFENCE LIMITED (3) HENRY TURNBULL |
Defendants |
– – – – – – – – – – – – – – – – – – – – –
– – – – – – – – – – – – – – – – – – – – –
Richard Power KC and William O’Hara(instructed byGreenwoods Legal Services Limited) for the Claimant
Bobby Friedman KC and Sym Hunt-Brady (instructed by Withers LLP) for the Defendants
Hearing dates: 28 July 2026
Further notes submitted 5 August 2026, 13 August 2026, 18 August 2026 and 20 August 2026
Transcript received 26 August 2026
Further notes submitted on consequential submitted on 14 and 16 October 2026
– – – – – – – – – – – – – – – – – – – – –
Approved Judgment
This judgment was handed down remotely at 2pm on 16/10/2026 by circulation to the parties or their representatives by e-mail and by release to the National Archives.
………………………..
SIR CLIVE FREEDMAN:
I Introduction
1. This is an application for summary judgment for breach of contract with damages to be assessed, alternatively for an interim payment on account of such damages together with interest. The Claimant (“Tripwire”) and the First Defendant (“Astor”) operate in the explosives industry. Amongst other things, Tripwire and Astor both buy and sell TNT.
2. The claim arises out of back-to-back contracts dated 12 September 2024, whereby: (a)Astor agreed to sell TNT to Tripwire at a unit price of USD 10.50 per kg (“the Astor-Tripwire Contract”); and (b) Tripwire agreed to sell TNT to Global (“the Tripwire-Global Contract”). Tripwire says that there has been a total failure to deliver goods under the contract notwithstanding advance payments made by Tripwire to Astor comprising a sum of about USD 9.45 million.
3. Whilst Astor at first denied any breach of contract, it now admits for the first time a delay in delivery: see para. 6 of Astor’s skeleton argument. Whilst it admits a liability for delay, it denies any broader liability for non-delivery. There is therefore an admission of liability on the part of Astor for breach of contract, but Tripwire says that the breach of contract is not delay, but total non-delivery. In any event, Astor denies an entitlement to any damages because of a set off/counterclaim in a sum of in excess of any damages which could be awarded on the claim.
II Background
(1) The Astor-Tripwire Contract
4. Under the Astor-Tripwire Contract, Astor agreed to sell 6 million kgs to Tripwire in year one and 10 million kgs in year two, at a price of USD10.50 per kg. The deliveries in year one were to be between September 2024 and August 2025. The deliveries in year two were to be between September 2025 and August 2026. The batches were to be made in 1 million kgs quantities every two months unless otherwise agreed by the parties. There was also an option to purchase additional quantities of 10 million kgs in each of years three and four, for deliveries on a date to be agreed based on when the options were exercised.
5. Tripwire was to make an advance payment of 15% for the first year’s quantity (15% x USD10.50 per kg on 6 million), totalling USD 9.45 million (clause 9). Tripwire made that payment: first a payment of USD 1,575,000 on 20 September 2024 and second a payment of USD 7,875,000 on 3 October 2024 comprising a total sum of USD 9,450,000. The sum was to be returned if an export licence was not approved within 60 days of Tripwire providing either a valid end user certificate or an international import certificate. The licence was provided on or around 13 September 2024 to Astor and Mr Turnbull. There was a delivery schedule: a quantity of 1m kgs was due to be delivered each month starting in December 2024.
6. There was provision for payments in the event of late delivery. Astor was liable to Tripwire for a sum equal to 1% per annum that the tranche was undelivered, cumulatively calculated for each month that delivery was delinquent up to a maximum of eight months. After eight months of delinquency, a flat sum of 8% thereafter was to apply. The late delivery sums were expressed to be in addition to any other legal remedies that might be available to Tripwire under the contract: see clause 4(d).
7. Notwithstanding the above payments, there has been no delivery of any TNT by Astor to the order of Tripwire.
(2) The Tripwire-Global Contract
8. Under the Tripwire-Global Contract, Tripwire initially agreed to sell 6m kgs of TNT to Global in year one and 10m kgs in year two, at a price of USD13.50 per kg. Here too, there was an option to purchase additional quantities of 10m kgs in each of years three and four. Global was to make an advance payment of 15% of the price of the year one quantity (i.e. 15% x USD 13.50 on 6 million), totalling USD 12.15 million (clause 10). Global made that payment.
9. On 31 October 2024, Tripwire and Global amended the Tripwire-Global Contract (the “Amendment”) such that: (a) the year one quantity rose to 10m kg (making a total quantity of 20m kgs over the first two years); and (b) the price was reduced to USD 11 per kg. The Amendment was signed on Tripwire’s behalf by Mr Morris. The amendment is referred to in the litigation that Global has brought against Tripwire in Florida (for Tripwire’s breach of the Global-Tripwire PO (the “US Proceedings”). There was no commensurate amendment to the Astor-Tripwire Contract, such that the specified quantities in years 1 and 2 remained 6m kgs and 10m kgs respectively (as opposed to 10m kg per year under the Tripwire-Global Contract).
10. On 3 June 2025, Global and Astor entered into the “Astor-Global Contract”. By that agreement, Astor agreed to sell to Global 6 million kgs of TNT in 2025 and 12 million kgs of TNT in 2026, at a price of USD 9.50 per kg. On 6 June 2025, Global issued what it called a termination notice in respect of the Tripwire-Global Contract: see the Defence and Counterclaim para. 45.1.
11. The evidence of Mr Turnbull, in his sixth witness statement dated 13 April 2026 at para. 7(d), is that “Astor has a direct contractual relationship to supply TNT to Global, and… this has superseded a previous back-to-back arrangement after Global terminated its contract with Tripwire.” There is evidence that TNT is being delivered by Astor to Global and that the Defendants is due a commission on each kilogram delivered pursuant to a variation in the Astor-Global Contract in December 2025, although Mr Turnbull said that it had not been paid: see the sixth witness statement of Mr Turnbull at para. 7(e) and the seventh statement of Mr Turnbull at para. 5.
(3) The Claim
12. The claim is in part a claim for deceit on the basis that it is alleged that in order to induce Tripwire to enter into a contract with Astor, Mr Turnbull represented fraudulently to Mr Morris of Tripwire that it would be necessary for Tripwire to pay a deposit so that this sum could be paid to Astor's Vietnamese supplier and that Astor would use the sum for that purpose in order to fulfil its contract with Tripwire: see Particulars of Claim paras. 5 – 25. In reliance on that representation, it is alleged that Tripwire paid to Astor the sum of USD 9.45 million in two instalments on 20 September 2024 and 3 October 2024. No goods were delivered and the deposit was not paid to the suppliers for the purpose of supplying TNT to Tripwire. It is alleged that the representation was made falsely or recklessly as to its truth in that the intention was to use the down payments for equipment to be supplied by third parties and specifically to purchase 24 supercars, a yacht and a mansion. It is stated in the draft Re-amended Defence and Counterclaim at para. 19.2 and in Mr Turnbull’s third witness statement dated 4 November 2025 that the sum of USD 9.45 million was used to pay GAET, a counterparty of Astor, as part of a deposit due.
13. At para 26 of the Particulars of Claim, there is a claim in unjust enrichment based on a total failure of consideration for the payment of the sum of USD 9.45 million. There is a claim for damages for the tort of unlawful means conspiracy and tortious interference with Tripwire’s contractual relations: Particulars of Claim paras. 30-46. The claim in short is that Global and Astor combined so as to cut Tripwire out of the deal for the delivery of TNT under the Astor-Tripwire Contract through the unlawful means of breach of contract and/or tortious interference with Tripwire’s contract with Global and misrepresentation. There is a further claim in breach of contract in respect of the Orica deal referred to at paras. 47-48 of the Particulars of Claim.
14. It is important to note that whilst the claims in fraud, conspiracy and the like were central to the claim and to the application made to the Court for a freezing injunction, the claim which has given rise to the application for summary judgment/interim payment is only for and by reference to the claim for breach of contract in the following terms:
“27. In breach of the written agreement dated 12 September 2024…, Astor failed to supply the TNT pursuant to Astor's contract with [Tripwire].
28. In the premises, [Tripwire] is entitled to damages to put itself in the position it would have been in had that TNT been supplied, namely the profit it would have made through supplying that TNT to Global- being US USD 108 million (i.e. the profit that [Tripwire] stood to receive under its contract with Global if Global had taken up its full entitlement, as it is to be inferred it would have done given the quantities ordered and its ongoing relationship with Astor and Global).”
15. There were other breach of contract claims at para. 29 and at paras. 47-48 of the Particulars of Claim, but they were separate from the claim at paras. 27-28 of the Particulars of Claim, and the application for summary judgment and for interim payment is not founded on them. Likewise, it is not founded on the claim for unjust enrichment at para.26. A reason for this was said to be a concern that Tripwire may be held to have elected the unjust enrichment alternative claim and be precluded from pursuing the claim for breach of contract.
(4) The defence to the claim in breach of contract
16. In its original form, it was denied that there was a breach of contract as alleged in paras. 27-28 of the Particulars of Claim. It was stated that before a breach of contract can be analysed, it is necessary to identify the full scope of the obligations entered into by the parties and to resolve the issues of the applicable law and jurisdiction. This arose because there was a reference to Tripwire’s terms and conditions and an assertion that Floridian law governed the agreement.
17. This was more a line of inquiry than a defence. The absence of need for the inquiry has been answered by evidence that there were no such terms and conditions (it arose out of a mistaken reference to them in contractual documentation). No terms and conditions have been identified by the Defendants. Likewise, neither is the assertion that Floridian law applies correct, but in any event, no relevant provision differing from English law has been identified.
18. This argument was pursued as recently as 3 July 2026 through the sixth witness statement of Ms Harris at paras. 11-25, but it has not been relied upon in the course of the hearing of the application. This argument has had the effect of causing Tripwire to have to attend to it in its evidence and in a large part of its skeleton argument. With this abandonment of central planks of the Defendant’s argument has come a draft Re-amended Defence and Counterclaim of the Defendants which will be considered below.
19. It was stated in the draft Re-amended Defence and Counterclaim at para. 34.2 that before analysing the merits, it would be necessary “to resolve the issues of applicable law and jurisdiction…”. There are no issues of jurisdiction to resolve because the Defendants submitted to the jurisdiction of this Court by service of the defence and further have pleaded a counterclaim. The contrary was not asserted in the hearing of the application.
20. The Defendants now accept that the terms and conditions point, whilst being reserved for other purposes, is not to be treated as an answer to the application for summary judgment or an interim payment. By way of the draft Re-amended Defence and Counterclaim, the Defendants now say that they accept that there is no defence to the claim that there was a delay in delivery until October 2025 of a total of 7 million kgs.
21. However, they say that it was an implied term of the agreement that each party would not insist on performance of an obligation which they were prevented from carrying out by the other side. As a result of the matters set out in the counterclaim, it is claimed that Tripwire precluded Astor from obtaining the TNT from its suppliers such that Tripwire prevented performance: see draft Re-amended Defence and Counterclaim para. 34.3. It is said by Astor that whereas the Tripwire-Global Contract was terminated for breach on 6 June 2025, there was no termination for breach of the Astor-Tripwire Contract. Thus, it remained alive, and Astor would have performed but for the bringing of the claim in fraud and conspiracy and the freezing injunction obtained on 7 October 2025. This argument appears to have emerged for the first time very shortly before the hearing by the draft Re-amended Defence and Counterclaim.
22. The counterclaim is predicated upon an allegation that Tripwire had pleaded claims in fraud for the sole purpose of damaging Astor’s reputation and seeking a freezing order against it. The alleged consequences included the following. First, it has made it impossible for Astor to perform the Astor-Tripwire Contract because of the impact of the allegations of fraud and the freezing injunction. Second, it has caused the Defendants damage which has exceeded the amounts claimed by Tripwire, giving rise to a set off and/or a counterclaim which operates as a defence for the purpose of and/or defeats the application for summary judgment and/or interim payment.
(5) The response of Tripwire.
23. The answer of Tripwire in submissions is that this ignores the underlying facts, not least that there was never any performance of the Astor-Tripwire Contract either before or after June 2025. There were no deliveries before then, and thereafter there was never any attempt to perform it. There is nothing in the contention that it would have been performed after June 2025. On 3 June 2025, there was the Astor-Global Contract which in effect replaced the contracts to which Tripwire was a party as Astor and Global cut out Tripwire from the chain of supply. The contract price was USD 9.50 per kg, but Astor was still making money on the sale of TNT, and in any event, the contract was not at arm’s length because Mr Morales of Global had by this stage acquired a 24% interest in Astor. Further, on 6 June 2025, Global sent a letter of termination of the Tripwire-Global Contract, immediately following the Astor-Global Contract. The Astor-Global Contract was first disclosed with the witness statement of Ms Harris on 3 July 2026. The serial number or type of TNT on that contract, namely MIL-DTL-2480 is consistent with that which appears in the Astor-Tripwire Contract, which is further evidence that the Astor-Global Contract replaced and superseded the Astor-Tripwire Contract.
24. Tripwire submitted that reality should prevail. Irrespective of the claim in fraud, the character of the breach of contract had to be seen in context. The sum of USD 9.45 million had been paid by Tripwire, and yet no delivery of TNT to the order of Tripwire took place prior to June 2025 or at all. The notion that any deliveries under the Astor-Global Contract could be viewed as a belated fulfilment of the Astor-Tripwire Contract is contradicted by the direct dealing of Astor with Global without the involvement of Tripwire and in circumstances where the contract between Tripwire and Global had been terminated by Global. To that extent, the money was used to fulfil a contract between Astor and Global and not between Astor and Tripwire. There is referred to at para. 40 below a quotation from Cotter J in the discharge application that that was as much contractual performance as using the money to purchase a yacht, meaning that it was not done for the purpose of fulfilling a contract with Tripwire.
III Summary judgment: procedural law
25. The following is a quote from the Civil Procedure Rules at CPR 24.2:
“Grounds for summary judgment
"CPR 24.2 The court may give summary judgment against a claimant or defendant on the whole of a claim or on a particular issue if –
(a) it considers that –
(I) that claimant has no real prospect of succeeding on the claim or issue; or
(ii) that defendant has no real prospect of
successfully defending the claim or issue; and
(b) there is no other compelling reason why the case or issue should be disposed of at a trial."
(Rule 3.4 makes provision for the court to strike out a statement of case or part of a statement of case if it appears that it discloses no reasonable grounds for bringing or defending a claim)"
26. The legal principles applicable on an application for summary judgment are well settled and were recently set out by Henshaw J in Lex Foundation v. Citibank NA [2022] EWHC 1649 (Comm), [33]-[35]. The following points bear emphasis which are taken from Tripwire’s skeleton argument:
(1) Under Part 24 of the CPR, the Court may award summary judgment on any issue in dispute, including in respect of one claim or cause of action among many: see e.g. White Book, vol. 1, [24.1.1], [24.1.4].
(2) Pursuant to CPR 24.3, the Court may give summary judgment against a claimant or defendant on the whole of a claim or on an issue if: (a) it considers that the party has no real prospect of success on the relevant claim, defence or issue; and (b) there is no other compelling reason why the case or issue should be disposed of at trial.
(3) The Court must consider whether the respondent to the application has a “realistic” as opposed to a “fanciful” prospect of success: Swain v.Hillman [2001] 1 All ER 91. This means that their case must carry “some degree of conviction” and must be more than merely arguable: ED&F Man Liquid Products v. Patel [2003] EWCA Civ 472, [2003] CP Rep 51, [8].
(4) An application for summary judgment should not be a mini-trial. However, it does not follow that the Court must take at face value and without analysis everything that a party says in their witness evidence: ED&F, [10]. If it is clear that there is no real substance in the factual assertions made, the issue may be susceptible to disposal at an early stage to save cost and delay: ibid.
(5) If an applicant for summary judgment adduces credible evidence in support of the application, the respondent then comes under an evidential burden to prove some real prospect of success or other reason that the matter should go to trial: Sainsbury’s v. Condek [2014] EWHC 2016 (TCC), [13].
(6) A defendant who seeks to resist summary judgment on the basis that further evidence may be available at trial must satisfy the Court that there are reasonable grounds for believing (a) that further evidence may in fact be available later on down the line and (b) that that evidence might affect the outcome of the case: Doncaster Pharmaceuticals Group Ltd v. The Bolton Pharmaceutical Company 100 Ltd [2006] EWCA Civ 661, [2007] FSR 3, [18]. This reflects the law’s disapproval of “a desire to investigate alleged obscurities and a hope that something will turn up” as a basis for defending a summary judgment application; a case that is “all surmise and Micawberism” will not suffice: The Lady Anne Tennant v. Associated Newspapers Ltd [1979] FSR 298, 303 (Sir Robert Megarry V-C). Thus, the Court should not refuse an application for summary judgment, simply to allow one party to wait and to see if mythical contractual documentation might happen to emerge following disclosure: Capita Pension Trustees Ltd v. Sedgwick Financial Services Ltd [2019] EWHC 314 (Ch), [61].
(7) As to the relevance of set-offs and/or counterclaims asserted by a defendant:
i. The start-point is that a defendant is “not entitled to resist an application for summary judgment merely because it raises a set-off or counterclaim”; rather, the Court must “still enquire into the nature of such a set-off or counterclaim, and consider whether the defendant has established that it has a reasonable prospect of successfully defending the claim or issue”: ASI Pipework Ltd v. Saxlund International Ltd [2017] EWHC 1523 (TCC), [12].
ii. A counterclaim that does not amount to a set-off should not prevent judgment being entered: P&O Steam Navigation Co v. Youell [1997] 2 Lloyd’s Rep 136.
iii. Where a claimant’s claim is sufficiently clear-cut as to be susceptible to summary judgment, but the defendant alleges “a cross-claim that overtops the amount of the claimant’s claim, or a legal set-off”, and the defendant’s cross claim is “not very certain – meaning that the defendant could not himself have obtained summary judgment if the roles had been reversed”, the Court will exercise its discretion in accordance with the overriding objective, including in particular the need to do justice between the parties (which “includes expedition and economy”): Swissport (UK) Ltd v. Aer Lingus Ltd [2007] EWHC 1089 (Ch), [2009] BCC 113, [31]. Where both parties are solvent, “it may make sense to give judgment on the claim and leave the defendant to pursue his cross-claim”, on the basis that, “[t]o the extent that [the defendant] succeeds, he will get his money back”: ibid.
IV Summary judgment: discussion
27. For the purpose of the current application, the original speculative matter of the terms and conditions has now been abandoned as has the possibility of the law of Florida applying. It is no longer said that there is the possibility of a jurisdiction challenge.
28. The new challenge that the breach was only in the nature of delay and not in the nature of non-delivery does not have a real prospect of success. This can be seen from considering those facts which are incontrovertible. There was a period of at least seven months or longer from the time when the first delivery was expected until the commencement of proceedings. During that period, there was no delivery despite the sum of USD 9.45 million having been paid by Tripwire to Astor. There is no indication that there was any attempt on the part of Astor to acquire the TNT in order to honour the Astor-Tripwire Contract. Putting to one side the case of fraudulent representations and the case that the part payment was misappropriated, there are the following features which render demonstrably false the case that the breach was merely about delay.
29. First, in view of the back-to-back nature of the two Tripwire contracts, the failure to deliver on the Astor-Tripwire Contract prevented performance on the part of Tripwire of the Tripwire-Global Contract. Second, after a long period of breach, on 3 June 2025, Astor contracted with Global in the terms of the Astor-Global Contract. Whilst the quantities were not identical, and there was a lower price of USD 9.50, there was a sufficient overlap of 6 million kgs and 12 million kgs to lead to an inference that the intention was for Astor to replace Tripwire as the supplier to Global. Third, concomitant with the creation of a contract to cut out Tripwire altogether by the Astor-Global Contract, on 6 June 2025, Global purported to terminate the Tripwire-Global Contract for breach.
30. These facts, which do not require a mini-trial, are a complete answer to the case that Tripwire prevented Astor from being able to deliver according to the Astor-Tripwire Contract. By June 2025 at latest, the die was cast because of the non-delivery by Astor, and by Astor and Global combining to replace Tripwire. At the heart of the case is the substitution of the agreement to supply from Astor to Global culminating in the Astor-Global Contract in substitution for the agreements to which Tripwire was a party with Astor and Global respectively, namely the Astor-Tripwire Contract and the Tripwire-Global Contract. As noted above (para. 11 above) in Mr Turnbull’s sixth statement at para. 7(d), the direct contractual relationship of Astor with Global superseded the “previous back-to-back arrangement after Global terminated its contract with Tripwire.” There was nothing which Tripwire could do. When Astor acquired TNT and to the extent that it delivered to Global, it did so pursuant to the Astor-Global Contract and not pursuant to either Tripwire contract which had both been superseded. This shows that the case that, but for the proceedings, Astor would have continued to supply under the Astor-Tripwire Contract, is contrived and has no foundation.
31. Astor raised a point shortly before the hearing as follows. Whereas there was evidence of an express termination of the agreement between Global and Tripwire by Global, there was no express termination of the agreement between Tripwire and Astor. This is said to fuel the argument that absent a termination for breach, the contract would continue such that the guilty party could have honoured the contract belatedly. In other words, Astor could have fulfilled the contract belatedly, but they were prevented from being able to do this as a result of the impact of the freezing order and the claims in fraud.
32. In my judgment, the losses which are claimed did not depend on a termination on the part of Tripwire. Astor by its conduct in cutting out Tripwire and substituting the Astor-Global Contract deprived Tripwire of the benefit of the Astor-Tripwire Contract and the ability to earn profit through the sale of TNT to Global. That is sufficient to dispose of the point that that this was a delay in delivery case rather than a breach being in the nature of non-delivery. The losses claimed of the benefit of the contract in the nature of damages for non-delivery had already accrued by June 2025.
33. If, contrary to the above, there was a need to terminate the Astor-Tripwire Contract, it was done at latest by the commencement of the proceedings and a claim which was predicated upon losing the benefit of the Astor-Tripwire contract altogether. There was no or no belated attempt by Astor to seek an opportunity to make good under a continuing contract. Any deliveries thereafter of Astor were pursuant to the Astor-Global Contract.
34. It is an artificial construct that after the issue of proceedings or the freezing injunction, Astor could not supply to Tripwire because it is said that the Vietnamese supplier required payment upfront as a result of the proceedings and/or the freezing injunction. The Astor-Tripwire Contract was not performed because of the actions of Astor in cutting out Tripwire from the contracts and the substitution of the Astor-Global Contract. The non-delivery was not due to an inability of Astor to perform it due to a prevention of performance by Tripwire.
35. Astor never sought to supply the TNT to Tripwire. Months before the proceedings, Astor had entered into a contract with Global which superseded the contracts with Tripwire. There is nothing in the suggestion that it was deprived of being able to do so because of the claim in fraud and conspiracy and the freezing injunction. The loss had occurred by June 2025 with the termination on the part of Global and the contract between Astor and Global.
36. It therefore follows that Astor was in breach of the Astor-Tripwire Contract as pleaded at paras. 27-28 of the Particulars of Claim and that there is no real prospect of success in defending the claim. The Astor-Tripwire Contract was therefore not performed, not because of the proceedings or a freezing injunction, but because of Astor’s action in cutting out Tripwire. There was never any attempt on the part of Astor to repent from the cutting out of Tripwire by Astor and Global acting together.
37. The breach was therefore not delay, but non-delivery. In my judgment, not only is there no real prospect of a defence to the claim for breach of contract, but also there is no other compelling reason for the case to go to trial. The desire to find out if anything may turn up at a later stage to support the purported defence ignores the context in which Tripwire was cut out of the contractual dealing. The notion that despite all of that, somehow Astor did not breach the contract and deprive Tripwire of its benefit is removed from reality.
38. Applying the procedural law set out above, there is no real substance in the factual assertions made such as prevents a disposal at an early stage. There is no evidence to satisfy the call that there are reasonable grounds for believing that further evidence may in fact be available later on down the line and that evidence might affect the outcome of the case. There will now be consideration of the effect of the counterclaim on the application for summary judgment.
V The counterclaim
39. It is necessary to understand the counterclaim in context. Tripwire commenced the present proceedings in October 2025 and sought a freezing injunction on a without notice application. The freezing injunction was ordered by Constable J and then continued in November 2025 by Cotter J. It remains in place (subject to amendments that have been agreed or ordered in the meantime). On the return date before Cotter J, it was argued on behalf of the Defendants that the injunction should be discharged on a broad basis including the absence of an arguable case, the absence of a real risk of dissipation, that it was not just to continue the injunction and that it should be set aside for failure to give full and frank disclosure. Cotter J refused to discharge the injunction and rejected the arguments raised by the Defendants, finding that there was an arguable case including of fraudulent misrepresentation. He found that there was a real risk of dissipation and he continued the freezing injunction on the same terms, finding that in the exercise of his discretion he should do so.
40. It was argued that the moneys paid by Tripwire to Astor had been used to acquire TNT. Since the evidence was that insofar as the moneys were used. it was to acquire TNT for the purpose of a supply under the Astor-Global Contract, the subject of the conspiracy allegation made by Tripwire against the Defendants, Cotter J said (at para. 134 of his judgment) that this was “as much dissipation… as using funds to buy a yacht as the money was not retained until used for the proper purpose and has now been “lost” to Tripwire (there has been no suggestion of repayment/payment) and used for the purposes unconnected, indeed effectively damaging, to the legal obligations to Tripwire.”
41. Subsequently, there was an application on behalf of the Defendants to set aside or discharge the injunction in view of what was said to be a change of circumstances. Among other things, it was submitted that there was no longer any real risk of dissipation. That application was heard by Mansfield J who dismissed the application with the effect that the injunction was continued.
42. By way of counterclaim, the Defendants seek to say that there was a conspiracy to injure them through the proceedings and by making a claim in fraud and through the freezing injunction. An effect of this is to cause harm to their business and standing. In particular, it is said that this in itself constituted a breach of contract in preventing Astor’s ability to perform their contract with Tripwire. It is contended that by virtue of the present proceedings, Astor was rendered unable to pay GAET, its Vietnamese supplier, which was essential in order to obtain TNT in order to supply to Tripwire.
43. The contention that the proceedings and/or the freezing injunction caused Astor to be unable to perform its contract with Tripwire has already been rejected. Astor chose not to perform that contract and in June 2025 entered into the Astor-Global Contract to supersede the contracts with Tripwire. It follows that the proceedings and the injunction in October 2025 did not have any effect on the Astor-Tripwire Contract. The losses of Tripwire in respect of the breach of the Astor-Tripwire Contract had already crystallised by June 2025 and in advance of the proceedings. The instant case was to seek a remedy for the losses which had occurred. Within these proceedings, summary judgment is being given for the breach of the Astor-Tripwire Contract. It follows that there was nothing unlawful in bringing proceedings to obtain relief in respect of a breach of contract which is now established.
44. The counterclaim also relies on various facts and matters to support an inference that Tripwire combined with Mr. Clark, a former employee of Astor and Marine Lumber International LLC (“Marine Defense”), a competitor of Astor. Mr Clark is said to have harvested 4,900 confidential documents and to have joined Marine Defense in breach of a restrictive covenant. There is no evidence that Tripwire was a party to this.
45. It is said that from around February 2025, Mr Turnbull became aware that Mr Clark was planning to oust him from Astor. This is said to be evidenced by documents on the computer that was issued for Mr Clark’s use by Astor. It is said that Mr Clark deleted numerous documents in April 2025 and downloaded the above 4,900 documents. It is said that from June 2025, Mr Clark was employed by Marine Defense in breach of a restrictive covenant which he had agreed with Astor, and thereafter he began to compete aggressively with Astor for its customers.
46. It is said that Mr Turnbull told Mr Morris about his difficulties caused by Mr Clark and that Mr Morris offered to assist Mr Clark and that he contacted the police which led to an investigation in the USA. It is said that Tripwire joined this combination some months later, which may have been at the time of or before the proceedings in autumn 2025. It is said that Astor has been informed by Tripwire that its pursuit of these proceedings is reliant on funding from another of Astor’s competitors. Further, it is said that the same competitor has exploited Astor’s confidential information (harvested by a disgruntled employee whose employment was terminated by Astor) to further damage Astor’s business. This all forms the backdrop to Astor’s counterclaim / Part 20 Claim.
47. A further part of the alleged conspiracy alleged against Tripwire is an allegation that Marine Defense is funding Tripwire’s pursuit of the claim. In that regard:
(1) Marine Defense is alleged to be funding Tripwire’s pursuit of the claim. However, there is no direct evidence to support this. Astor relies on an alleged Signal conversation between Mr Patrick O’Shaughnessy and Mr Kenny Hassinger of Tripwire: see draft Re-amended Defence and Counterclaim para. 74.4. This has been denied by Mr McGrath, the CEO of Marine Lumber International LLC and its affiliates in his first witness statement at paras. 5, 6 and 9 and in an email dated 15 April 2026. He stated that there is not and never has been a funding agreement or a commercial relationship between any of the entities within the Marine Group and Tripwire.
(2) Mr Morris denies in his first witness statement at para. 31 that Marine Defense is funding the litigation or that he or Tripwire have been receiving funding from an outside source for the purposes of funding the litigation. It has also been denied by the fifth witness statement of Mr Wallis at para. 29.2, the partner of the firm of solicitors acting for Tripwire. He states that his firm has been investigating the possibility of securing third party funding.
(3) In his judgment, Mansfield J, whilst saying that he could not decide the issue of whether there was funding, stated at para. 74 of his judgment that “the fact of funding changes nothing as to the merits of the claim”. In my judgment, the allegation that there was funding is very slender, a conversation without any written evidential support either contemporaneous or in a witness statement against a plethora of denials including from the solicitors themselves. If, contrary to the above, an arguable case of funding was established, I respectfully agree with Mansfield J, that this does not change anything as regards the merits of the claim.
48. Other allegations of the alleged conspiracy is an allegation about Tripwire being involved in writing an inaccurate and misleading article to harm the Defendants. This is a reference to is a news article uploaded by a US law firm Ballard Spahr on 16 January 2026 concerning the freezing order. It is alleged that Tripwire and/or Marine Defense caused that article to be published. However, in his judgment in these proceedings at paras 76 to 77, Mansfield J set out the case theory which at its highest involved an attorney not acting for Tripwire deliberately writing an inaccurate and misleading article in order to harm the defendants. Mansfield J regarded that as “highly unlikely and not something I am prepared to assume took place without cogent evidence. In any event, there is no evidence to connect Tripwire to the article.” I agree with that analysis.
49. It is said that Marine Defense in April 2026 agreed an exclusivity arrangement with a Vietnamese company called 83 Mec, having allegedly learnt from Tripwire that Astor was in the process of negotiating such an arrangement. Mansfield J held at para 78 that there was “nothing to connect this to Tripwire”. I agree with that analysis.
50. Astor alleges that Tripwire has in these proceedings pleaded claims in fraud for the sole purpose of damaging Astor's reputation and seeking a freezing order against it. It refers in the skeleton argument (para. 64(d) to the “injunction and the existence of Tripwire’s (wildly overcooked) fraud claims [being] obviously intended to cripple our stores market position and interfere with particular streams of business (which they have done).” The skeleton argument boldly refers to “this abusive litigation” which is “a core pillar of the campaign against Astor” (para. 64(f)) and to “the pursuit of trumped up fraud claims bolstered by a freezing injunction” (para. 64(g)).
51. This invective has to be seen in the light of the facts which have given rise to the fraud case. Tripwire’s case in fraud has been held to be properly arguable by two High Court judges, namely Constable J and Cotter J. Cotter J at para. 122 held that Tripwire had cleared “by some margin the hurdle of establishing that there were serious issues to be tried in relation to the procuring of contracts and funds by fraudulent misrepresentation, and interference by unlawful means/conspiracy. Events and/or evidence have only made Tripwire’s case stronger”.
52. The conclusion that the fraud case is arguable, and indeed by some margin, is justified particularly in the light of the following features, namely.
(1) Whilst the existence of a breach of contract case does not by itself found a claim in fraud, it is a relevant building block to the plea of fraud. For the reasons given above, it has been found that the breach of contract is established and the suggestion that there was simply a delay on the part of Astor, which delay is in any event unexplained, has been rejected. Further, even on the case of delay, there is no evidence that at the end of the period of the “delay”, Astor repented for its breach and expressed an intention or desire to perform under the Astor-Tripwire Contract. That would have been at odds with the facts, namely the replacement of the Astor-Tripwire Contract with the Astor-Global Contract, cutting out Tripwire.
(2) It is a disturbing feature of the breach of contract case that Astor received a sum of USD 9.45 million and took no steps to deliver or acquire TNT to the order of Tripwire, and that this occurred over a period of months. Irrespective of whether the moneys received were held on trust, the receipt of such a large sum of money without steps being taken to use the money or its equivalent to deliver or acquire TNT to the order of Tripwire at lowest raises a question as to whether Astor at any time had the intention to perform the Astor-Tripwire Contract.
(3) It is a further disturbing feature how it came about that instead of performing the Astor-Tripwire Contract, Astor entered into a contract with Global which appears to have been intended to cut out Tripwire altogether. The evidence is to the effect that the beginnings of the association between Astor and Global were proximate in time to the back-to-back contracts. As Cotter J observed at para. 96 of his judgment, Mr Turnbull has now admitted that in October 2024, he met with Mr Morales, the CEO of Global, in a private meeting without Mr Morris at which the issue of Global buying Astor was discussed. It is also known that Mr Morales did go on to purchase a 24% share in Astor.
(4) The case in fraudulent misstatement is that there was a representation by Astor that the money to be paid under the Astor-Tripwire Contract would be utilised to acquire the TNT which in turn would enable Tripwire to fulfil the back-to-back the Tripwire-Global Contract. It is not a quantum leap from the other fact in the case that such a statement was made.
(5) Further, in the events which have occurred, namely the failure to deliver or acquire TNT over many months and the absence of explanation in respect to the same coupled with the association between Astor and Global at a time when Astor ought to have been fulfilling or preparing to fulfil its contractual obligations to Tripwire, there is reasonable scope for an inference at least that the alleged representation was made dishonestly.
53. The judgments of the High Court Judges who have looked at this case have come to conclusions (with which I respectfully agree) to the effect that the fraud claim was arguable or that it cleared the margin by some distance or that the events/the evidence made Tripwire’s case stronger. This is consistent with and reflective of the matters set out in the five sub-paragraphs of paragraph 52 above.
54. Sometimes it is the case that a plea in fraud is not justified and there may arise a case to the effect that the plea was based on malice and a deliberate abuse of process. Even then, it does not follow that the absence of an arguable case in fraud proves that there was malice or a deliberate abuse of process. There is the particular hurdle referred to in JSC Bank of Moscow v. Kekhman & Ors [2015] EWHC 3073 (Comm), as adverted to by Flaux J (as he then was) who stated at para. 20 that in deciding whether there is a valid plea of fraud “the correct test is whether or not, on the basis of the primary facts pleaded, an inference of dishonesty is more likely than one of innocence or negligence”. Much more has to be shown in order to found an inference of “abusive litigation” or “the pursuit of trumped up fraud claims bolstered by a freezing injunction” than the dismissal of the case in fraud and even on the basis that the facts did not prove an inference of fraud.
55. Despite the characterisation of Tripwire’s case in the skeleton argument of Astor as set out in para. 50 above as being “the pursuit of trumped up fraud claims bolstered by a freezing injunction”, the more precise way in which Astor pleads its conspiracy allegation is by asserting that even if there was a case of fraud, Tripwire has pursued claims in fraud when the real substance of its claim is in contract. It says that the pleaded case exceeded that which would have been necessary for the protection of any legitimate interest and that the real reasons why Tripwire has pleaded fraud has been to obtain a freezing injunction and weaponise it and to injure the Defendants. This was said to be with the predominant purpose to cause damage to the Defendants as part of a conspiracy to injure: see para. 102 of Reamended Defence and Counterclaim.
56. At this stage and on the evidence presented, there is no reason to believe that Tripwire’s claim was brought with the predominant purpose of causing damage to the Defendants. It has already been found that there is an arguable case, particularly in the context of the large pre-payment not having been used for the purchase of TNT and without evidence as to how it was that in the months prior to June 2025 there were no steps to deliver any TNT pursuant to the Astor-Tripwire Contract. Likewise, there is an arguable case that there was a combination of Astor and Global to cut out Tripwire and thereby to interfere with contractual relations. Whether or not these claims will succeed at trial is a different matter, but at this stage there is no real prospect of being able to show that the claims were brought with the predominant purpose of causing damage to the Defendants.
57. There is nothing in the contention that the real substance of the claim was in breach of contract. One only has to consider the numerous arguments raised in the interim payment application referred to below to see the fallacy of this argument. Factually, this was not simply a breach of contract in failing to deliver, but it involved allegations of fraudulent misrepresentation causing the moneys paid by Tripwire to Astor and a combination of Astor and Global to cut out Tripwire. There are possible answers to the more limited way in which damages are calculated for breach of contract which do not apply to damages for torts based on deliberate wrongdoing such as fraud and conspiracy including remoteness, causation and the liability for the wrong of a conspirator or joint tortfeasor. It therefore follows that there is nothing in the argument that the pleaded case exceeded what was necessary whether in law or on the facts of the case for the protection of any legitimate interests of Tripwire. It is therefore a circular argument that a freezing injunction may not have been appropriate for a pure breach of contract allegation even although in each case the Court would look at the substance of the allegation and not simply the cause of action.
58. The same applies in respect of the application for a freezing injunction. At the interim stage, the need for the injunction has been upheld by three High Court Judges, that is at the without notice stage, on the return date and on the application to set aside. On the material available at this stage, there is no reason to believe that the freezing injunction was brought abusively or maliciously or predominantly to injure the Defendants. There is sufficient evidence to support a risk of dissipation of assets, in that just as there was evidence of fraudulent conduct in the underlying case, so there is a risk that assets would be dissipated to cheat Tripwire out of the fruits of a judgment.
59. The evidence of dishonesty was buttressed by other evidence in the case not directly relevant to the particular plea of fraud, but which provides further evidence against Astor and Mr Turnbull. This will be relied on both as further evidence on which to found the allegation of fraud relating to the representation prior to the payment of the sum of USD 9.45 million and to justify the application for a freezing injunction. It includes that there was an arrangement in February 2025 between Tripwire and Astor that Astor would supply EDC-4 explosives to the MOD, and when the MOD had paid for the explosives, Astor would pay Tripwire immediately so that the goods could be produced by Tripwire and supplied to the MOD. In April 2025, the MOD concluded a written contract for the supply to it by Astor of ECD-4 explosives for £4,862,180. In order to fob off Tripwire about payment from Astor to Tripwire, Mr Turnbull represented to Mr Morris of Tripwire at least on 21 July 2025 and on 21 August 2025 that the MOD had paid Astor months earlier. He now accepts that he knew that that was untrue. In addition to that being relied upon as a part of a separate case of Tripwire against Astor, it is evidence at this time of an admitted lie on the part of Mr Turnbull. It therefore provided further evidence of dishonesty on which Tripwire was entitled to rely which was relevant to the case of the risk of dissipation.
60. Each of Constable J, Cotter J and Mansfield J found on the totality of the evidence that the case that there was a real risk of dissipation was made out. They did so in part by reference to the nature of the causes of action and also due to the nature of the large sums of money in which Astor dealt. This was particularly evident in connection with the diverted contracts from Tripwire to the Astor-Global Contract.
61. Here too, there is a similar analysis. There was objectively a sufficient reason to apprehend a real risk of dissipation of assets sufficient to justify a freezing injunction, and the Court found not only at the without notice stage but thereafter that the threshold for such an injunction had been satisfied. Further, Tripwire has satisfied the Court including at the inter partes stages that there is at least an arguable case of fraud and significantly more than an arguable case and that there is a basis for apprehending a real risk of dissipation. In these circumstances, I find that even on a summary application that there is no real basis to the case of Astor that Tripwire alleged fraud or applied for a freezing injunction in furtherance of a conspiracy to injure the Defendants.
62. I have also considered the question as to whether there are reasonable grounds to believe that further down the line there may be further evidence to suggest that the case in fraud and the application for the freezing injunction were abusive or for the predominant purpose of injuring the Defendants . There are no such reasonable grounds.
63. The counterclaim is pleaded both in conspiracy by unlawful means. The case that Tripwire has been a party to the conspiracy by unlawful means has been rejected to the standard required at a summary stage. The case that Tripwire has been a party a conspiracy to injure by lawful means with a predominant intention to injure has been likewise rejected to the same standard. The various unlawful conduct alleged has all been rejected as lacking in evidence and substance and having no real prospects of success. There is nothing to indicate that Tripwire was not pursuing the litigation, making the claims in fraud and economic torts and seeking freezing injunctions in order to protect its legitimate commercial interests, and this is irrespective of whether at trial Tripwire’s claims in fraud and economic torts will ultimately succeed. That is the case both as regards the claim for conspiracy by unlawful means where there is no basis to show that Tripwire was party to a conspiracy or that it had an intention to injure. A fortioiri for the case as regards conspiracy by lawful means that there is no basis to show not simply that it was party to a conspiracy or that it had an intention to injure, but that such intention was the predominant intention.
64. It follows that there is nothing in the counterclaim which provides a basis for deferring a summary judgment or for being used to defer an order for an interim payment. The Defendants point to a without notice application which was made before Master Stevens who on 14 July 2026 gave permission to serve out of the jurisdiction the counterclaim on the First and Second Part 20 Defendants (Mr Clark and Marine Lumber). This does not affect any of the conclusions. Master Stevens did not have before her the same detailed consideration which I have had on this on notice application and which has enabled me to reach the conclusions which I have reached.
65. The Court is not striking out the Counterclaim against Tripwire at this stage. There is no application before the Court to do so. Nevertheless, in my judgment on the material before the Court it does not raise a case with a real prospect of success against Tripwire nor is there any reason to form a view that there is other material which will found the basis of a counterclaim against Tripwire in due course.
66. If and insofar as it may be relevant, I have considered in the alternative whether the counterclaim provides a basis of set off against the claims of Tripwire. The counterclaim not being a claim for a liquidated sum, there is no question of a legal set off. There is no real prospect of an equitable set off because the counterclaim is not so closely connected with the claim that it would be manifestly unjust to allow the claimant to enforce payment without taking into account the cross claim: see Geldorf Metaalconstructie v Simon Carves [2010] EWCA Civ 667, [2011] 1 Lloyd’s Rep 517. The breach of contract started in 2024 and by early June 2025, Global and Astor had purported to cut out Tripwire from the supply chain. That followed collaboration between Astor and Global for some time prior to that and apparently as early as in 2024.
67. It is apparent from the papers that the proceedings and the injunction came months thereafter. Further, as set out above, it is apparent that if there was a combination involving Astor on the pleaded case, this was not until shortly prior to the instant proceedings, again months after June 2025. There is therefore no temporal connection between a clear and established breach of contract and months thereafter a counterclaim arising out of claims in fraud and conspiracy and a freezing injunction in connection with the same. The fact that the proceedings were for the breach of contract, which it has been found to be established, does not provide a sufficiently close connection between the claim for breach of contract and the counterclaim herein such as to make it so closely connected that it would be manifestly unjust to allow the Claimant the ability to enforce the claim without taking into account the alleged counterclaim. There is therefore no real prospect of establishing either a legal set off or an equitable set off.
VI Summary judgment: disposal
68. For these reasons, I find that Tripwire is entitled to summary judgment in respect of its claim for breach of contract in paras. 27-28. There is no real of prospect of success in any defence or any other compelling reason why that part of the case should go to trial. I find also that the alleged counterclaim does not provide a basis for denying Tripwire summary judgment.
VII Interim payment: procedural law
69. The following is a quote from the Civil Procedure Rules at CPR 52.20(1)_and 25.23
“Court’s powers
25.20(1) The court must not order an interim payment of more than a reasonable proportion of the likely amount of the final judgment.
Grounds for interim payment
“25.23. The court may only make an interim payment order where any of the following conditions are satisfied—
(a)the defendant against whom the order is sought has admitted liability to pay damages or another sum of money to the claimant;
(b)the claimant has obtained judgment against that defendant for damages to be assessed, or for another sum of money (other than costs) to be assessed;
(c)it is satisfied that, if the claim went to trial, the claimant would obtain judgment for a substantial amount of money (other than costs) against the defendant from whom they are seeking an interim payment, whether or not that defendant is the only defendant or one of several.”
70. As to interim payment, the applicable legal principles may be summarised as follows. The threshold conditions for awarding an interim payment are set out in CPR 25.23. They are as follows:
(1) Pursuant to CPR 25.23(b), the Court may make an interim payment order against a defendant where “the claimant has obtained judgment against that defendant for damages to be assessed, or for another sum of money (other than costs) to be assessed”.
(2) Generally, it will be inconsistent to order unconditional leave to defend and an interim payment, but not inconsistent to make leave conditional on the making of an interim payment: see Andrews v Schooling [1991] 1 WLR 783 (CA).
(3) Generally, interim payment procedures are not suitable where factual issues are complicated or where difficult points of law arise but this does not prevent an award being made in respect of part of a complex claim where there is evidence establishing with reasonable certainty the minimum sum likely to be recoverable (sometimes referred to as the minimum sum undisputably due: seeChiron Group v Murex Diagnostics Ltd (No.13) [1996] F.S.R. 578 (Walker J)
(4) Pursuant to CPR 25.23(c), the Court has the power to make an interim payment where “it is satisfied that, if the claim went to trial, the claimant would obtain judgment for a substantial amount of money (other than costs) against the defendant from whom they are seeking an interim payment, whether or not that defendant is the only defendant or one of several”. In other words, a claimant seeking an interim payment must establish, on the balance of probabilities and by reference to the material before the Court, that they would succeed on their claim and obtain judgment for a substantial amount at trial: Test Claimants in FII Group Litigation v. Revenue & Customs Commrs [2012] EWCA Civ 57, [2012] 1 WLR 2375, [38]. In conducting this analysis, the Court should take into account the existence of any valid set-off, which might provide a defence to the claimant’s claim.
(5) At the time of considering whether the conditions in CPR 25.23(b) and 25.23(c) are satisfied, “it is not enough if the court were to be satisfied (to the standard of a balance of probabilities) that it was ‘likely’ that the claimant would obtain judgment or that it was ‘likely’ that he would obtain a substantial amount of money.” per Aikens LJ in HMRC v GKN Group [2012] 1 WLR 2375 at [38].
(6) If the Court is satisfied that a condition is met, the Court should go on to consider whether, in its discretion, to order an interim payment. The Court must not order an interim payment of more than a reasonable proportion of the likely amount of the judgment.
(7) At this second discretionary stage:
(i) The Court should take into account any defence of set-off or counterclaim (including counterclaims not available as a defence): see CPR r. 25.20(2): see Peak Hotels and Resorts Ltd v Tarek Investments Ltd [2015] EWHC 1997 (Ch) at [156]; see also Shanning International Ltd v. George Wimpey International Ltd [1989] 1 WLR 981, 990 under the RSC where it was sufficient that the set-off or counterclaim was genuinely arguable.
(ii) When fixing the amount of an interim payment, the Court must not order an interim payment of more than a reasonable proportion of the likely amount of the final judgment (CPR 25.20(1)).
(iii) A “fundamental feature of the jurisdiction” is to identify “an irreducible minimum”: Ultraframe (UK) Ltd. v Eurocell Building Plastics Ltd [2005] EWHC 2111 (Ch) at [7]). This may be expressed as “what sum it can safely be assumed the claimant will recover in any event” (per Kitchin J (as he then was) in Alan Nuttall Limited v Fri-Jado UK Limited [2010] F.S.R. 37 at [11]).
(iv) The Court may award no more than a reasonable proportion of the abovementioned amount—but it may be a high proportion, provided the assessment has been conservative: see Eeles v Cobham Hire Services [2009] EWCA Civ 204; [2010] 1 WLR 409
(v) Where the condition in CPR 25.23(c) is met (i.e. where the Court is satisfied that a claimant would obtain a judgment for a substantial sum of money), the Court should usually grant an interim payment order, unless there is sufficient specific reason not to: Test Claimants in FII Group Litigation [47].
(8) In all cases, the Court will need to consider the justness of making an order, and exercise its discretion, taking into account all of the relevant factors. As explained in the White Book (Vol. 2) at 15-119: “The emphasis on the broadness of the discretion can be seen as simply reflecting the fact that the circumstances in which its exercise may be called into play can vary enormously”.
(9) Amongst the reasons why it may not be just to make an order, one relevant factor is where: “if a defendant's resources are such that an order for interim payment would cause irremediable harm which cannot be made good by an eventual repayment”:British & Commonwealth Holdings Plc v Quadrex Holdings Inc [1989] Q.B. 842 at [867]. It is a relevant feature. It is not a decisive feature. Everything will depend on the justice of each case.
VIII Interim payment: discussion
1) The amount of the damages claimed
71. The way in which the claim for an interim payment has been made has been by reference to the part of the claim for which a summary judgment has been claimed. This is for the breach of contract of claim in respect of the Astor-Tripwire Contract pleaded at paras. 27-28 of the Particulars of Claim. It is not the claim for unjust enrichment (failure of basis) pleaded at para. 26 of the Particulars of Claim. It is not for the claim for damages for deceit or for negligent misstatement at paras. 5-25, nor for tortious interference and/or unlawful means conspiracy at paras. 30-46, nor for breach of contract claimed in paras.20 and 29 and in paras. 47-48 of the Particulars of Claim, which is not the same contract as that referred to at paras. 27-28.
72. As pleaded at paras 27-28 of the Particulars of Claim, the claim is for damages to put the claimant “in the position it would have been in had that TNT been supplied, namely the profit it would have made through supplying that TNT to Global – being USD 108 million (i.e. the profit that the Claimant stood to receive under its contract with Global if Global had taken up its full entitlement, as it is to be inferred it would have done given the quantities ordered and its ongoing relationship with Astor and Global.)”
73. In the application for the interim payment, an interim payment of USD 48 million alternatively USD 9.45 million plus interest is sought. Those sums are calculated as follows:
(1) the claim of USD 108 million is by reference to the loss of profit that it is said would have been earned in the event that Global had taken up not only the quantities for year one and year two, but also the options for the third and fourth tranches. It is said that the options would have been taken up but for the conspiracy between Astor and Global;
(2) The interim payment of USD 48 million is calculated by reference to the loss of profit on the agreed quantities for year one and year two alone, and it is by reference to the difference between a purchase price of USD 10.50 per kg and a sale price of USD 13.50 per kg, that is a margin of USD 3.00 per kg. That is in respect of deliveries of 6 million kgs in the first year and 10 million kgs in the second year, that is to say 3 x 16 million = USD 48 million. This avoids having to make any decision as to whether at trial the alleged conspiracy will be established which is the basis of the assumption that Global would have exercised its option.
(3) The alternative of an interim payment of USD 9.45 million is by reference to the sum which was paid by Tripwire to Astor on the assumption that the minimum damages which would be obtained would be sufficient to recoup that expenditure. In other words, it does not depend upon the contract having been profitable, but “on the basis that the Claimant will, on any view, obtain a final judgment on the breach of contract claim for at least this sum, since had the contract been performed it would have received TNT worth at least the value it had paid for it.”: see the fourth statement of Owen Huw Wallis at para. 26.
(2) The claim for an interim payment of USD 48 million
74. The claim for an interim payment of USD 48 million has been challenged by the Defendants among other reasons because it is predicated upon a resale price of USD 13.50 per kg. The Defendants point to the amended purchase order of Global which was signed on behalf of Tripwire and contained a resale price of USD 11.00 per kg, It is a curiosity in the Particulars of Claim that the claim for USD 48 million does not acknowledge the amended purchase order.
75. In the US Proceedings, Tripwire has admitted that it signed the amended purchase order. The Reply at para. 9 refers to the case of Tripwire as to the background to the amendment of the purchase order. It is said that Mr Turnbull instructed Mr Morris to accept the amended purchase order on the basis that there would be a profit between the purchase price of Astor and sale price of Astor to Global which was USD 3.80 per kg. This would be split 50-50 between Astor and Tripwire so that each would receive USD 1.90 per kg. Tripwire's case is that Mr Morris signed the amended purchase order in the belief that this was the result of Global's own position rather than a conspiracy between Global and Astor.
76. It follows that Tripwire's position is that it is still entitled to the difference of USD 3.00 per kg. This is in effect part of or closely allied to the case in fraud and conspiracy. It involves having to set aside the amended purchase order and reverting to the sum of USD 13.50 per kg. In my judgment, this opens up the same or similar issues to the fraud and conspiracy case which deliberately does not form a basis of the claim for an interim payment because no finding can be made without a trial or a mini-trial.
77. There is an alternative case of Tripwire’s loss of profit is USD 1.90 per kg (being one half of the difference between Astor’s purchase price of USD 7.20 and the amended purchase order of Global of USD 11.00 per kg, that is one half of USD 3.80 per kg) and not USD 0.50 per kg (being the difference between the purchase price of Tripwire of USD 10.50 per kg and the amended sale price of USD 11.00 per kg). This was not the way that the case was pleaded in the Particulars of Claim, although it was mentioned in the Reply at para. 9 by reference to Signal messages from Mr Turnbull to Mr Morris dated 29 and 30 October 2024. It was said that the amended purchase order was signed on the basis of Mr Turnbull's agreement to share his profit with Tripwire. This is said (in the Reply) to be an alternative claim, albeit it is not clear whether it is against Astor or Mr Turnbull or both.
78. On the basis of the amended purchase order without any side agreement and without any conspiracy, it is said that the loss of profit would still have been USD 8 million, that is to say 16 million x USD 0.50 per kg. There was a suggestion that the true loss of profit would have been USD 10 million, but in the course of submissions Mr Power KC on behalf of Tripwire was prepared to restrict the case for the purpose of the instant application to the smaller sum of USD 8 million.
79. It is difficult to understand the basis of the claim for USD 48 million or at least why the Particulars of Claim make no reference to the amended purchase order with the much lesser purchase price and therefore reduced profit. In my judgment, it is not possible to form a view to a standard required for an interim payment application that the true resale price was the original price of USD 13.50 or that there was a profit sharing arrangement of the kind described or that there had been a conspiracy.
80. Tripwire has rightly left out of the USD 48 million the higher claim pleaded which begs the question of whether the options would have been exercised or, put another way, whether the failure to exercise the options was a consequence of the breach. Those are matters which could not be determined without a trial, and a mini-trial is inappropriate. It follows that the starting point for considering loss of profit at this summary stage must be the reduced price contained in the amended purchase order with Global and not the purchase order before it was amended or any revised arrangement between Astor and Global or the higher sum of profit which may have been earned if the options had been exercised.
(3) The evidence in respect of the loss
81. It is necessary to revert to the pleaded claim in para.28 of the Particulars of Claim set out above. That contained a reference to the position Tripwire would have been in if the TNT had been supplied and the position in which the Claimant would stand to be having received money under the Tripwire-Global Contract which would have at resulted in profit. It is axiomatic if that is the case that it would have reimbursed the price paid including the part payment made by Tripwire to Astor.
82. The points made against Tripwire include the following:
(i) The margins under the amended purchase order were so small that there might not have been a profit after taking into account costs saved;
(ii) By reference to the pleadings in the US Proceedings, there is no probability that the TNT would have been capable of being delivered to Global or that Global would have received the same;
(iii) There is no case raised of what would have happened if the Tripwire-Global Contract did not proceed and of the ability to obtain a third party sale;
(iv) Tripwire is attempting to recover through the back-door its claim for unjust enrichment but that is not proper or fair because it has not been the basis of the applications which are limited to damages for breach of contract, especially at paras. 27-28 of the Particulars of Claim.
(i) The low margins
83. Astor submits that the profit from the USD 8 million stands to be reduced by the costs saved by Tripwire due to the contract not proceeding. Astor says that Tripwire would know what costs have been saved, but it has not adduced any detailed evidence. Astor submits that the import of TNT is a complicated matter and relevant documentation or licences have to be obtained and inspection protocols have to be observed. It is said that such evidence will become apparent as a result of disclosure in the case, witness evidence and cross-examination including forensic accounting expert evidence. Without such evidence, it is said that the Court cannot safely estimate for the purpose of an interim payment any sum at all since the contract may have been unprofitable.
84. It is said also that Mr Morris’s affidavit of 7 October 2025 must be considered here. He said that the effect of the discussions leading to the amendment of the Tripwire-Global Contract was that that this “mostly wiped out the margin that Tripwire had hoped to make”: see the affidavit at para. 66. In the next paragraph 67, Mr Morris said that the difficulty that Tripwire was that it would have no end buyer “if we fell out with Global” and they were trying to find another end buyer “because the agreement that Astor had reached with Global had meant that we were barely breaking even on the contract.”
85. As regards trying to find another buyer for the TNT following the amended Global purchase order, this did not occur: there was no third party supplier. Tripwire says it wished to have a greater profit on the contract, but it did not mean that Global would not have performed under the Tripwire-Global Contract if held to it by Tripwire. This assertion cannot be taken at face value on a summary application for an interim payment.
86. Astor submitted that there was a danger that Global might have made a further attempt to reduce the price if they did not have their contract with Astor directly. That price in June 2025 in the Astor-Global Contract was USD 9.50 per kg. In view of the unsuccessful attempt on the part of Tripwire to obtain a better price in the market, the position of Tripwire would have been vulnerable if Global had played “hardball”. It already had form for this with the amended purchase order.
87. Tripwire says that there was no indication that Global would do such a thing. Further and in any event, Tripwire would not have accepted a change to the contract which made it loss-making and would have enforced its legal rights. It says that there was a difference between accepting a reduced profit and accepting a loss making contract. It also says that the price of USD 9.50 per kg is not indicative because it was entered into in a contract not at arm’s length having regard to the 24% shareholding of Mr Morales in Astor.
88. Tripwire says that it should not have to prove a negative and that there are no substantial costs saved. In its Reply and Defence to Counterclaim at para. 31, Tripwire stated “As to paragraph 35.7.1, it is unclear what costs the Defendants say would have been incurred in circumstances where the TNT was to be delivered directly to Global by Astor. The only costs occasioned by the contract that the Claimant [Tripwire] is aware of are the costs incurred in relation to the testing of the product. Those costs have already been incurred and would not have been incurred again.”
89. Further, in the Tripwire-Global Contract, it was stated: “Delivery terms: FOB Vietnam seaport, loaded into leased 20ft hazmat certified shipping containers. GMP will provide the end user statement at each release.” On the basis of these delivery terms, Tripwire did not have substantial transportation costs. Tripwire therefore submits that it is safe to assume that the sum of USD 8 million plus interest would represent the profit even on the basis of the amended purchase order and that enough money would have been received in order to recoup the advance of USD 9.45 million.
90. If the Court were satisfied on the balance of probabilities that there would be large profits (e.g. USD 48 million as per the primary case), then there would be scope for finding that there might be some additional costs, but they would not turn a large profit into loss. However, the amended purchase order mostly wiping out the margin was to transform that position and this was coupled with the concerns of Mr Morris and what would happen if Tripwire fell out with Global. Global had renegotiated a first time in October 2024 leading to the amended purchase order. In the end, upon cutting out Tripwire, it obtained a lower purchase price of USD 9.50. Even if Astor had not been in breach of contract, there is a concern as to what would have happened if Global had renegotiated a second time. The profit margin on Mr Morris’s evidence was so tight that very little would make it a loss making contract. That led in turn to the attempts, albeit unsuccessful of Tripwire, to find a substitute buyer. The failure of that search is at least evidence that there may not been anything better in the market.
91. In those circumstances, there is a concern about acting on mere assertions about the contract remaining profitable, or about the assertion that in the event that there was a further attempt to renegotiate, Tripwire would have stood on its rights. So small was the profit margin that the assertion that it was still profitable cannot be established with the level of conviction required for an interim payment.
92. There is scope for greater inquiry about the level of the margins and what might have affected them and about what would have happened if Global had renegotiated for a second time. There is no satisfactory evidence that absent Global, a price could have been obtained in the market to break even and recoup the moneys paid to Astor. This is in the light of unsuccessful attempts on the part of Tripwire to find an alternative buyer to Global and the price of USD 9.50 agreed between Astor and Global. This aspect of the case as to the ability or otherwise to recoup the expenditure from the value of the TNT is considered in the section below headed (iii) “Ability to find alternative customer other than Global”.
(ii) The US Proceedings: ability to collect from Global
93. The Defendants point to the US Proceedings between Tripwire and Global and submit that the case of Tripwire in the US is inconsistent with its case in these proceedings in England and Wales. They say that the effect is that for the purpose of the instant application, Tripwire ought to be held to its case in the US Proceedings or at least that such inconsistency ought to be explored through disclosure and oral evidence at trial. They say that through their solicitors Withers, they iterated this position in correspondence in July 2026 shortly before the hearing and that there was no adequate response. In other words, they gave fair warning of this point in advance of the hearing. The correspondence will shortly be referred to in more detail.
94. In the US Proceedings, Global alleges that Tripwire is in breach of the Tripwire-Global Contract for non-delivery. The Defendants point to the case of Tripwire in the US Proceedings that non-delivery by Astor did not put Tripwire in breach of the Tripwire-Global Contract. Tripwire answered Global’s case that it was in breach by relying on contractual failures of Global: see paras. 9 and 10 of its Amended Counterclaim:
“Tripwire’s performance obligations were expressly conditioned upon GMP’s [Global’s] timely provision of valid end-user certificates, import licenses, and governmental clearances, together with prompt payment of staged deposits and cooperation with inspection and release procedures…Tripwire stood ready, willing, and able to perform its contractual duties, but GMP repeatedly failed to meet these contractual prerequisites, inter alia, GMP submitted defective EUCs, GMP delayed required export certifications, and GMP attempted to unilaterally alter delivery destinations, inspection protocols, and payment terms—contrary to the Contract’s express provisions.”
95. There was then pleaded in Tripwire’s Amended Counterclaim from para. 12 onwards a course of breaches of contract of the Tripwire-Global Contract on the part of Global. In particular, it included the following:
“12. By March 2025, GMP’s internal communications reflected doubts about its resale commitments. Rather than cure its own nonperformance, GMP began attempting to circumvent Tripwire by approaching Astor directly to procure TNT supply.
13. In or about April 2025, GMP employees, acting without Tripwire’s knowledge or authority, contacted Astor directly, falsely asserting that Tripwire was in default and urging Astor to enter into a replacement contract with GMP.
14. These unauthorized communications caused Astor to suspend production for Tripwire pending clarification, resulting in delayed manufacturing runs, disrupted logistics, and significant commercial harm to Tripwire.
15. GMP has disseminated false statements alleging Tripwire’s “default,” to pressure Astor into breaching its supply commitments, and to withhold performance of its own contractual obligations.”
96. The context by then appears to have been the lead up to the Astor-Global Contract. The importance for this purpose is that Global was prepared to breach its contract with Tripwire in the respects there set out. The way in which it is pleaded is that Global was the lead force intent on breaching the Tripwire-Global Contract rather than following the lead of Astor.
97. Further, there was a plea of force majeure that “to the extent any delay or non-performance occurred, it was the result of factors beyond Tripwire’s control including third-party export restrictions, supplier disruption, and interference by plaintiff [Global] and therefore excused under the doctrines of impossibility and force majeure.”: see para. 4 of the US Answer of Tripwire. On this basis, there could not be performance of the Tripwire-Global Contract with the alleged effect that Tripwire could not rely upon the contract price agreed with Global and would have had to make a fire sale in lieu of the agreed contract.
98. It is also contended by Tripwire in the US Proceedings that Global’s breaches led to damages including lost profits and consequential losses (paras. 30-31). This is said to mean that any non-delivery by Astor did not put Tripwire in breach of the Tripwire-Global Contract. It is said that this central tenet of the claim for damages for breach of contract i.e. the alleged loss of profit under the Tripwire-Global Contract must fall away or that there is at least a real prospect that this is the case.
99. Further, Astor draws attention to para. 10 of the defence in the US Proceedings where Tripwire stated it “stood ready, willing and able to perform” under the Tripwire-Global Contract. On this basis, it is to be inferred, says Astor, that Tripwire was not dependent on Astor to perform and was therefore culpable in not delivering to Global. In short, any breach of Astor in non-delivery did not cause the loss claimed of not being able to honour the Tripwire-Global Contract.
100. These points were flagged in correspondence between the parties, particularly in a letter dated 20 July 2026 from Withers on behalf of the Defendants sent to Greenwoods on behalf of Tripwire. In short, the letter posited how it could be said that the Tripwire-Global Contract could not be performed due to impossibility and force majeure or due to breach of contract on the part of Global in meeting contractual prerequisites to performance. The response of Greenwoods on 21 July 2026 was any queries should be adopted to lawyers in the USA, namely Taft Law. That did not address this position.
101. Further correspondence did not elucidate the position of Tripwire other than to refer to the fifth witness statement of Mr Wallis dated 17 July 2026 at paras. 41-43. Mr Wallis said that nothing in the US Proceedings undermined the position in the instant proceedings in this jurisdiction. He said:
“41. The key points in Ms Harris’ narrative seem to be (i) that the pleaded positions in the US proceedings differ from those in these proceedings….
42. First, it is not surprising that there are differences in the two sets of pleaded cases. Those differences do not relate to the underlying facts but to the framing of the position, in a different jurisdiction. For example, in the US proceedings there is an allegation that Global interfered with the relationship between Tripwire and Astor, whilst in the UK proceedings the allegation is that Astor interfered with Tripwire’s relationship with Global. This is not surprising given the relevant parties to each of the proceedings and the relevant applicable law being different. The nature of the claims pleaded (conspiracy/fraud) typically requires disclosure in order for the exact position to be known. No doubt those pleaded cases will develop if and when further facts come to light.
.
43. Regardless, the two sets of proceedings have a common theme, namely, that Astor and Global have conspired to damage Tripwire and Tripwire has suffered as a result of that collusion. This application, however, relates only to Astor’s breach of contract. The matter of Astor’s collusion with Global will be decided at trial.”
102. It is not a sufficient answer to say that the proceedings in different jurisdictions have to be contextualised by the particular allegations in that jurisdiction or by the particular issues. Where the effect of an allegation in one jurisdiction has or may have a necessary effect in the other jurisdiction or may be relied upon to test a case, such contextualisation is not decisive at least at the stage of a summary application. There is no reason, at least at this summary stage, to accept that matters can be compartmentalised in this way. In my judgment, the approach of the evidence of Mr Wallis quoted above is inadequate as regards the impact of the case being run by Tripwire in the US on the way in which damages is pleaded at para. 28 of the Particulars of Claim in this jurisdiction.
103. This is apposite as regards the allegations of the conditions precedent to performance by Tripwire under the Tripwire-Global Contract. Tripwire alleged that they can be waived and would have been waived in the event that the TNT had been delivered by Astor. However, it is not possible on the evidence to evaluate whether that would have been possible. As noted above in the quotation from paras. 9 and 10 of Tripwire’s Counterclaim in the USA, the conditions precedent included “valid end-user certificates, import licenses, and governmental clearances, together with prompt payment of staged deposits and cooperation with inspection and release procedures” It was a matter of submission rather than evidence that any of these requirements could be waived. The failures included submitting defective end-user certificates, delaying in the provision of export certifications and attempting unilaterally to alter delivery destinations and inspection protocols.
104. The law is that not every condition precedent can be waived by the party seeking to sue on a contract. In Chitty on Contracts 36th Ed. para. 4-208, it is stated:
“Where a condition is inserted entirely for the benefit of one party, that party may waive the condition. If they do so, they can then sue and be sued on the contract as if the condition had occurred. Obviously, this rule does not apply to cases falling within the category of cases discussed in para.4-201 above, in which there is no contract at all before the condition occurs. Nor can the party for whose benefit the condition was inserted waive it (so as to enforce the contract) after the other party has duly exercised a right, conferred by one of its other terms, to terminate the contract.”
105. There was no evidence that such failure to meet contractual pre-requisites could be waived by either party. In the context of a contract for the supply of TNT, they appear prima facie at least in part to be required for the purpose of satisfying governmental and/or regulatory authorities. The public interest in the identity of an end user in respect of TNT seems obvious and the notion that one party could simply waive the need for an end user certificate seems unlikely. Likewise matters pertaining to export certifications, delivery destinations and inspection protocols are matters which appear to be matters at least in part for the purpose of satisfying third parties, namely government and/or regulators. These are matters on which the Court at this summary stage cannot reach a conclusion without considering in depth the how these matters are developed in law and in fact against Global and the impact on the case that there would nonetheless have been no effect on the income stream from Global on which para.28 of the Counterclaim is founded.
106. Likewise, the case of force majeure or the doctrine of impossibility relates to third party restrictions. They have not been defined, but they must be taken at face value at the stage of an interim payment application. On the basis that the third party restrictions caused force majeure or impossibility of performance, then the Tripwire-Global Contract could not have been performed.
107. As to whether the consequence was that Global was in breach of contract by reason of these matters and there would have been a possible action against Global for these matters, this cannot be determined without a trial or a mini-trial. The case that the Tripwire-Global contract was profitable and the case as to damages for breach of contract relied upon in para. 28 of the Particulars of Claim in the instant proceedings is to the effect that Tripwire would have honoured the Tripwire-Global Contract. From this income stream, a profit and at least a reimbursement of the moneys paid by Tripwire to Astor would have been achieved. The whole tenor of the US Proceedings is to the effect that Tripwire-Global Contract would not have been honoured and that the cause of this was Global.
108. It is not the same that Tripwire could have held Global to its contractual obligations. That involves speculation as to what would have occurred in relation to the matters to be determined in the US Proceedings, which is inappropriate for an interim payment application. It also involves consideration of a hypothesis which is complicated and also inappropriate at this stage. It involves how (on the hypothesis of delivery by Astor) Tripwire would have funded the purchase of the Astor-Tripwire Contract without an income stream from Global. All of this raises a real prospect that no profit would have been received by Tripwire, and it would not have received money to reimburse such moneys as it had or would have to pay to Astor.
109. At this stage, it does not suffice to say that this is simply to excuse non-delivery against Global and that it does not affect the case against Astor. It cannot be ignored simply because it is for the purpose of a different claim in a different jurisdiction. The ability to waive the conditions precedent cannot be assumed at this stage. All of this at face value affects the ability of Tripwire to receive money from Global. If money were not received from Global, then unless there were some other source of money on a sub-sale, then there would not be a source of income stream on which this part of the claim hinges.
110. Mr Power KC reminded the Court, particularly at the end of the discretion stage of his submissions, that Astor has received a part payment of USD 9.45 million and it failed to deliver the TNT and entered into a contract with Global designed to cut out Tripwire. He submitted that the Defence and Counterclaim in the US Proceedings are to be viewed in that light. Whilst there is some force in that submission, it is a part of the bigger picture of the claims for fraud, deceit and conspiracy. It is also a part of the claim in unjust enrichment referred to in greater detail below. These causes of action are not the subject of or a part of the application either for summary judgment or for an interim payment. Accordingly at this stage, the interim payment has to be seen through the prism of the breach of contract claim as pleaded at paras. 27-28 of the Particulars of Claim.
111. There is the further point made in the US Proceedings that Global’s breaches led to damages including lost profits and consequential losses (paras. 30-31). Given that judgment is not being sought on the conspiracy case, the question has to be asked in the breach of contract case as to whether if Astor had performed the contract, would Global have honoured the Tripwire-Global Contract? It is not an obvious inference that that would have been the case. On Tripwire’s pleaded case, Global was willing to be in breach of contract through cutting out Tripwire. The allegations of Tripwire in the US Proceedings are to the effect that with or without Astor, Global was not going to honour the Tripwire-Global Contract. The Court cannot dismiss at this stage as lacking a real prospect of success Tripwire’s case in the US Proceedings that Global’s breaches (irrespective of Astor) led to damage on the part of Tripwire. The effect of that would have been that the very income stream from Global to recoup expenditure to Astor and to earn profit might not have materialised.
112. In that event, the Astor-Tripwire Contract would or might have been loss making and so there is a real prospect that it would be shown that Tripwire would have been unable to be reimbursed from proceeds of sale from Global. Whilst there would be the possibility of recouping the expenditure in proceedings against Global, there would be the possibility of Tripwire suffering serious losses in the event of being out of pocket having to pay to Astor and whilst suing Global. Whether the contract was loss making would require a trial or a mini-trial and assumptions which cannot be made without a far more extensive examination than is appropriate other than at a trial.
113. Having reached that conclusion, it is not necessary to rule on the argument by reference to the words “ready, willing and able” to supply TNT to Global. Contrary to the submission of Astor, it appears to be directed to the position of Tripwire in September 2024 at the contractual stage and on the premise that Astor was going to honour its contractual obligations. The fact that under the amended purchase order there would have been a need to find an additional 4 million kgs would not affect the proposition that at the contractual stage, Tripwire expected to find a supplier for the additional quantity.
(iii) Ability to find an alternative customer other than Global
114. In the event of the failure of being unable to recoup the expenditure from Global under the Tripwire-Global Contract, there is no specific evidence on behalf of Tripwire that it could have found another purchaser in the market which would have paid enough to recoup the expenditure. On the contrary, there is evidence that Tripwire looked for a purchaser who would have been prepared to pay more than Global but could not find one. Further there is evidence of the price agreed between Astor and Global of USD 9.50 per kg. Whilst that may be a contract not made at arm's length due to the shareholding of Mr Morales in Astor, it is still evidence which might indicate that the market value of the TNT had become less than USD 11.00, thereby fuelling the argument that Tripwire would have been unable to recoup its expenditure or obtain profit from proceeds of a sale in the open market.
115. The absence of evidence about a buyer other than Global or a market in which a higher price could have been obtained equal to or greater than the price payable to Astor has the effect that there may not be a loss of profit claim and that there may have not been an ability to recover the moneys paid out to Astor from a buyer. This aspect of the case might for certain purposes be determined by the law relating to which party bears the onus of proof. Where there is an argument about an unreasonable failure to mitigate, it is the contract breaker which must show that if reasonable steps had been taken, the loss would have been avoided in whole or in part. In the instant case, the onus for the purpose of an interim payment application might be on Tripwire to satisfy the Court that it would have been able to recoup the expenditure whether from Global or from a third party alternative purchaser. The question about recoupment of expenditure or making a profit does not turn of this stage on the onus of proof. There is sufficient material before the Court for a real issue to be tried as to whether there would have been a recoupment of expenditure or any profit whether by reference to money to be received from Global or the market value of the TNT.
116. It follows that for the purpose of an interim payment, this is not a case where the Court can be satisfied to the level required in an interim payment application that Tripwire would have made a profit or recouped expenditure in the event that Astor honoured the Astor-Tripwire Contract.
117. In the formulation of the application for an interim payment, Tripwire has submitted that the loss of profit was in the order of USD 48 million. As set out above, a lost profit of that order or by reference to that is not established to the level required for an interim payment. In the alternative, and by reference to the amended purchase order a loss of profit claim in the order of USD 8 million has been advanced. For the reasons set out above, this involves making a number of assumptions in favour of Tripwire. They are not assumptions which the Court is prepared to make at this stage without a trial or a mini-trial. The consequence is that there is not the required degree of confidence required for the purpose of an interim payment application: there is no ‘irreducible minimum’ which the Court is satisfied would be awarded.
(iv) To what extent may the application for an interim payment take into account the claim for unjust enrichment?
118. There is a claim for unjust enrichment in para. 26 of the Particulars of Claim. It is pleaded as follows:
“Claim in unjust enrichment against Astor
26. Paragraph 12 above is repeated. Further, or alternatively, the Claimant is entitled to the return of the sum of US $9.45 million from Astor in unjust enrichment, there having been a total failure of consideration for the payment.”
119. There then follows the claim for breach of contract in the following terms at paras. 27-28 referred to above which has been set out above and is by reference to the sums which would have been received by Global if it had taken up its full entitlement.
120. The application for summary judgment is specifically by reference to the claim for breach of contract at paras. 27-28 of the Particulars of Claim: it is not by reference to the claim for unjust enrichment. Likewise, the application for an interim payment is also so limited.
121. The draft order attached to the application contains the following:
“Summary judgment is entered in respect of the Claimant’s claim (as pleaded at paragraphs 27 and 28 of the Particulars of Claim) that the First Defendant acted in breach of contract by failing to deliver TNT to the Claimant pursuant to a purchase order dated 12 September 2024, with damages to be assessed.
By way of interim payment on account of such damages, the First Defendant do pay the Claimant the sum of [US $48 million/ $9.45 million] within 14 days of the date of this Order, plus interest at the US Prime Rate from 1 January 2025 to the date of this Order, being […..] (emphasis added).”
122. The evidence in support, the fourth statement of Mr Wallis, is that the TNT would have been sold to Global or on the open market and would have been sold for sufficient to enable Tripwire to recover its expenditure to Astor. It is expressed as follows:
“24. As to quantum, it is accepted by the Defendants (at para 35.1 of the Defence) that in a claim for breach of contract, the Claimant is entitled to be put in the position it would have been in had the contract been performed. It is therefore entitled in respect of the first two tranches under the contract to the difference between the value of the TNT Astor was required to supply (16,000KG at $10.50) and the value of that TNT in the market, being the amount Global had agreed to pay for it, namely $13.50, being a total of $48 million [OHW4/72-75]. As regards the remaining two tranches, those were options Tripwire would have exercised but for the breach of contract. Tripwire would have earned a further $60 million in profit (being the difference between the contract value of the TNT and the value Global had agreed to pay).
25. On that basis, pursuant to CPR 25.20, the Claimant seeks an interim payment in the sum of $48 million, plus interest at the US Prime Rate.
26. Alternatively, if the Court is not willing to grant an interim payment now for that sum, the Claimant seeks an interim payment of $9,450,000 plus interest thereon at the US Prime Rate on the basis that the Claimant will, on any view, obtain a final judgment on the breach of contract claim for at least this sum, since had the contract been performed it would have received TNT worth at least the value it had paid for it (emphasis added).”
123. In supplementary written submissions after the hearing dated 6 August 2026, Tripwire stated that “it would at least be entitled to recover the sums paid to the First Defendant by way of a claim in unjust enrichment (which the Court is entitled to take into account when considering whether to award an interim payment).”
124. In a responsive submission of the Defendants dated 12 August 2026, it was stated:
“57. Finally, at paragraph 20(b), C’s Note seeks to rely on unjust enrichment. As explained at the hearing, the Application was not brought on the basis of unjust enrichment, and in fact that was specifically disavowed in the Application itself; see also, for example, Tripwire’s skeleton at paragraph 63.2(b)(iii), which confirms that Tripwire seeks only “summary judgment and an interim payment on its ‘vanilla’ breach of contract claim”.[1]
58. Astor has therefore not had the opportunity to put in evidence in response to any such suggestion (as it would have done). Nor has it had the opportunity to develop all of the factual and legal arguments that it would have raised in response to the same.
59. It was Tripwire’s decision specifically to limit its application only to breach of contract, disavowing unjust enrichment. The fact it has now tried to rely on a matter that was not in the Application, speaks to the fact that the Application in fact has no merit. It would not be appropriate for Astor to be bounced into dealing with unjust enrichment without any application in relation to it, and without there being evidence in respect of it (as the Application specifically was not premised on unjust enrichment such that this issue was not addressed). Any finding in Tripwire’s favour on the basis of unjust enrichment would therefore be inappropriate, not least in circumstances where unjust enrichment is irreconcilable with the claim (for damages for breach of contract) upon which the plea for an interim payment is based; this is amongst numerous other arguments that would be deployed in due course in response to the unjust enrichment claim at trial (emphasis added.)”
125. In oral submissions, it was submitted for Tripwire that there was a ‘slam dunk’ claim for unjust enrichment. It was recognised that this had not been the basis of the application for summary judgment or an interim payment, but it was relevant to the exercise of a discretion in that the Court could have complete confidence that one way or another, Tripwire would obtain a final judgment for USD 9.45 million. If necessary, it could be relied upon at the first stage. It was stated that “the reason we do not bring it before the court is if we did so and said we want the money back it would be said that we are disavowing the contract, or it might be said, and that we can therefore no longer get damages for breach of contract.” It was said that it was grossly unjust to allow Astor to retain the sum of USD 9.45 million, that the legal frontage or niceties of their case should be torn away.
126. Tripwire has chosen to bring the application for summary judgment based solely on the breach of contract claim at paras. 27-28 of the Particulars of Claim. It has chosen to make the application for interim payment by reference to the breach of contract claim and has not invoked the claim for unjust enrichment. It has had in mind the possibility of election, and Astor raises the point about election both in the Amended Defence (para. 33.3) and in oral submissions and invokes the fact that it has not had a full opportunity to consider how it would defend the claim for unjust enrichment or that it would have pleaded to it in the draft Re-Amended Defence and Counterclaim. It is not an answer to say that unjust enrichment comes at the discretion stage: that is to conflate or elide the discretion stage with the first stage. Tripwire is unable to prove the claim for breach of contract to the level required for an interim payment, and so the second stage of discretion does not arise. In my judgment, it would be wrong to allow Tripwire to alter the basis of the applications by allowing the claim for unjust enrichment to be raised at the first stage.
127. Astor submits that if the interim payment application included the unjust enrichment claim, then they would have considered the evidence and the submissions differently. They would have focussed on the arguments about election and other arguments specific to an unjust enrichment.
128. I am satisfied that it is not available at this stage for Tripwire to change the basis of the application and for the unjust enrichment claim to come in for consideration either through the front door of the first stage of the application or through the back door of the exercise of discretion. In the event, the first stage has not been satisfied.
v) Can the same sum be recovered as a claim for wasted expenditure
129. The Claimant’s alternative claim is on the following premises:
(1) the claim for damages as set out in para. 28 of the Particulars of Claim is for Tripwire “to put itself in the position it would have been in had that TNT been supplied”. If the TNT had been supplied, then not only would Tripwire have made a profit, but in the first instance it would have recouped the expenditure of USD 9.45 million.
(2) in the evidence in support of the application for an interim payment was in the fourth Statement of Owen Huw Wallis at para. 26 as follows:
“… the claimant will, on any view, obtain a final judgment on the breach of contract claim for at least this sum [USD 9.45 million] since had the contract been performed it would have received TNT worth at least the value it had paid for it.”
(3) A more specific way of expressing this is following the wording of para. 28 of the Particulars of Claim, the submission is that the projected income stream from the sale to Global ought to be sufficient to be able to recover the monies paid to Astor of USD 9.45 million. Even if no profit were ultimately made, the expenditure would have been recouped.
130. A way of characterising that was that there was a wasted expenditure element of the claim. A complication about that was that in a wasted expenditure case, the monies cannot be recovered in the event that the contract was a loss making contract such that the wasted expenditure would never be recovered.
131. Although this way of formulating the claim for damages for breach of contract has an overlap with, and is possibly duplicative of, the claim for unjust enrichment, it is freestanding in that it does not depend upon the claim for unjust enrichment. It is embraced within the pleaded case in paragraph 28 of putting itself into the position it would have been in had the TNT been supplied. If the TNT had been supplied, Tripwire’s case is that it would have earned profit. That must be predicated on recouping expenditure from the moneys paid by Global.
132. The ability to rely on a claim to recover the moneys paid to the counterparty under the contract as damages for breach of contract and not to have to rely on a total failure of consideration was discussed in Havila Kystruten v Abarca [2022] EWHC3196 (Comm) at para. 321 et seq. Henshaw J rejected the submission that reliance loss refers to expenditure vis-à-vis third parties and that it cannot include money paid to the counterparty. He held at para. 327 that such a claim is not limited to a claim in unjust enrichment and is not dependent on a total failure of consideration. It is subject to the usual defence available to the wrongdoer “if it can establish that due performance of the contract would still not have led the innocent party to recover value equivalent to the claimed reliance loss (the onus in that regard being on the party in breach] see Chitty 29-027, citing C.C.C. Films London Ltd v Impact Quadrant Films Ltd [1985] Q.B. 16).” He held at para. 335 that “there is no authority or principle supporting the proposition that money paid to the party in breach cannot be recovered as reliance loss, subject to satisfying the requirements ordinarily applicable to such a claim: and the decision in Cardiorentis is persuasive authority that it can be.”
133. This point was made crisply by Andrews, Tettenborn and Virgo in Contractual Duties: Performance, Breach, Termination and Remedies 4th Ed. at para. 21-048: “The second, and more common, type of reliance loss involves a slightly different situation. Here the claimant’s argument is not that he made the expenditure in reliance on the contract, but that the breach of the contract has caused existing expenditure of his to be wasted.” The footnote (n.148) then stated: ““[W]asted expenditure can be recovered when it is wasted by reason of the defendant’s breach of contract.” Lord Denning MR in Anglia Television Ltd v Reed [1972] 1 Q.B. 60 at 64. See too McRae v Commonwealth Disposals Commission (1951) 84 C.L.R. 377 at 413–414 (Dixon and Fullagar JJ).”
134. There is no question of the damages for loss of profit and wasted expenditure being duplicative. This was expressed as follows by Sir Ross Cranston in A v B [2018] EWHC 2325 (Comm); [2019] 1 Lloyd’s Rep. 385 at para. 89 as follows:
“…the leading texts recognise situations where wasted expenses up to contract’s date of termination can be claimed, along with loss of profit, if the latter is calculated net of the expenses incurred: see McGregor on Damages, 20th ed, 2017, para. 4-024; Chitty on Contracts, 32nd ed, 2017, paras. 26-029, 44-423. The claimant is not overcompensated in such cases provided there is no overlap in recovery. The net loss of profits must have been calculated by deducting from the expected gross returns the cost of performance, expenditure to the date of termination and the cost of the further expenditure which would have been incurred if the contract had run its full course. Compensation of a claimant in this type of case requires the award of both the wasted expenditure and the net loss of profits. There is nothing inconsistent in doing this with Cullinane v British “Rema” Manufacturing Co Ltd [1954] 1 Q.B. 292.”
135. On this basis, it follows that even if there was no profit which would have been made, the money might be recovered as damages for breach of contract by reference to wasted expenditure without any assumptions about level of profit.
136. There has been discussion as to where the onus of proof lies in a wasted expenditure case. In such a case, the wasted expenditure is recoverable subject to the wrongdoer proving that it would have been lost in any event due to the loss-making nature of the contract. Here too the question of onus of proof arises at the interim payment stage. There is an argument in this case that the onus would still be on Tripwire to prove that it would have received the income stream from which it would have deducted the expenditure. Put that way, the onus would be on Tripwire to establish the loss of the income stream. At this summary stage and on the facts of this case, it is an unnecessary complication to identify on whom the onus would lie at trial.
137. On either view at this stage, the effect of the combination of the evidence of barely breaking even, of an unsuccessful attempt to find another buyer, of the lower sale price in the Astor-Global Contract and of the case of Tripwire against Global in the US Proceedings are such that the Court is not satisfied to the extent required for an interim payment that this was not a loss making contract. The matters relating to Global including a course of conduct of breaches of contract referred to in the discussion about the US Proceedings above give rise to a serious risk that Global would have refused to honour the terms of the Tripwire-Global Contract even without Astor being in breach. For the reasons given above, it is not an answer that Tripwire could have satisfied their position by bringing proceedings against Global, having regard to the cash flow consequences of not having money to pay a hypothetically compliant Astor (for this purpose) and the complicated nature of such litigation against Global. It follows that it makes no difference whether the interim payment sought is by reference to claim for the recovery of the USD 9.45 million from the moneys recovered from a sale to Global or a sale to a third party or for damages for wasted expenditure. On either approach, there is not the required degree of confidence required for the purpose of an interim payment application: there is no ‘irreducible minimum’ which the Court is satisfied would be awarded.
(vi) An account of profits as a route to recovery
138. Following the hearing, the Court asked a question as to whether in the claim for damages that could be considered (putting to one side an unjust enrichment) whether an account of profits or disgorgement damages could be awarded for breach of contract irrespective of whether the contract was or would have been profitable for the claimant? There was presented to the Court a longer discussion about this than expected. In summary, the position is as follows:
(1) damages by way of an account of profits is a recognised form of damages. However, it is exceptional. The starting point is the very unusual case of Attorney-General v Blake [2001] 1 AC 268 at 285F-G. It is not sufficient that the breach was cynical and deliberate or that the breach enabled the defendant to earn more money in another contract or that by entering into such a contract the defendant put it out of his power to perform another contract.
(2) it is not impossible that an account of profits may be awarded in a commercial contract, but it is so unusual that it ought to be left for consideration at a trial.
139. It was not raised in the pleading as a remedy or a way of compensating for loss. As such, I accept that in the circumstances where the case of disgorgement damages was first articulated in the course of submissions following a judicial question post-hearing and where such damages are so unusual, it is not appropriate to make any interim payment by reference to the possibility of such damages.
(vii) The effect of a profit-sharing agreement
140. It is strictly unnecessary to consider this argument in view of the above reasoning, but I shall set out my conclusions. Astor refers to a profit-sharing agreement between Mr Morris, Mr Turnbull, Mr O'Shaughnessy and Mr O'Higgins which formed part of the evidence for the Claimant in the application for an injunction. It was a part of Tripwire's case that “Tripwire stood to make a profit of at least USD 27 million (reflecting Tripwire's share of the total potential profit that the four partners' stood to receive of USD 108 million depending on whether Global took up its full entitlement)”. It was by reference to this calculation that the maximum sum in the freezing order was the sum of USD 27 million. This had to be reduced in the light of the amended price in the Tripwire-Global Contract. Astor submits that any claim for damages for loss of profits must be deducted to take into account the profit-sharing agreement, that is by 75%.
141. The answer of Tripwire is that the profit-sharing agreement applied to profits of each of the partners. It is not an answer to a claim that there is an obligation to pay a part of the moneys received to a third party: the correct analysis is that the obligation of the innocent party to pay a third party does not affect the liability of the guilty party to the innocent party: see Slocom Trading Ltd v Tatik Inc. [2013] EWHC 1201 (Ch) at paras. 24 – 36. In the instant case, Tripwire points out that it was not a partner to any profit-sharing agreement. On the basis of the above, it was Mr Morris personally and not Tripwire and so the arrangement can have no bearing on the matters at issue. Likewise in further and better information provided by Astor, the parties to the profit-sharing agreement did not include Tripwire or Astor.
142. In any event, it is difficult to see how the profit sharing arrangement could share the distribution of the amounts received from a sale of goods. In order for the partnership to work, each partner would have to make recovery against the wrongdoer. Until and unless each partner made recovery against a wrongdoer, it would not be known what, if anything, were the profits. Further, if the venture involved a number of different contracts, there would have to be an account of all of the contracts. All of this supports the conclusion that the partnership stands separate from the distribution of moneys under a partnership.
143. In any event, to the extent that the claim is for the recovery of the sum of USD 9.45 million paid to Astor, that would not give rise to a profit, but to reimbursement of an expense by way of damages. It follows that an interim payment of a lesser sum than USD 9.45 million is not a payment of a profit and so it does not stand to be shared with Astor or anyone else.
144. It follows that the way in which Tripwire calculated its damages for the purpose of fixing a maximum sum in the freezing order does not affect the profit sharing point. For each of the reasons above, I would have rejected this argument that the quantum of any interim payment was subject to an adjustment for a share of the profits.
(viii) The risk of double recovery
145. It is also not necessary for the Court to consider the question as to whether an award of an interim payment against Astor carries with it the risk of a double recovery. The particular concern was that there are concurrent proceedings of Global against Tripwire where in respect of certain causes of action Astor and Global are alleged to be joint tortfeasors or otherwise to have overlapping liabilities. It might be that by the time of the adjudication in the US Proceedings which will or might precede trial in the UK, Tripwire will have received compensation such that the interim payment will no longer be required. At that stage, there is said to be a danger that Tripwire will be unable to return the money. It is submitted on behalf of Tripwire that it would be expected in any judgment of the US Court or compromise of the US Proceedings, there will be factored into it what might occur at trial in this action.
146. This is a complicating feature which would have had to be considered in the exercise of discretion at the second stage. It has an overlap with the case that having regard to the number of proceedings in which Tripwire is involved, there are concerns that it might not be able to return an interim payment. There are many scenarios to take into account which might or might be capable of being taken into account in any award or compromise in the US Proceedings. If there had been an exercise of a discretion, this might have been a relevant factor.
(ix) Conclusions on interim payment at the first stage
147. The following conclusions therefore arise:
(1) the basis of application for an interim payment by reference to a loss of profit claim of USD 48 million or thereabouts or a lower sum and in particular USD 8 million is rejected;
(2) it would require a trial or a mini-trial to reach the threshold required for an interim payment;
(3) by reference to the sum of USD 9.45 million paid by Tripwire to Astor the application must also fail because there are too many questions not capable of resolution without a trial or a mini-trial as to whether sufficient money would have been recovered from Global or a third party in order to recoup all or part of the expenditure paid by Tripwire to Astor as well as whether there would have been profit from the Astor-Tripwire Contract;
(4) in short, the claim for the recovery of the sum of USD 9.45 million in breach of contract is not a sum which is undisputably due or is a sum in respect of which there is the required degree of confidence that it will be found at trial to be due;
(5) the claim for payment by reference to unjust enrichment has deliberately not been made a basis of application for an interim payment due to concerns about election. Since this was not the basis of the application as set out above, it cannot be invoked at this stage;
(6) there is no claim for an account of profits and it is not appropriate in any event for an interim payment.
IX Interim payment: the exercise of discretion
148. In view of the failure of the application for an interim payment at the first stage, it is not necessary to consider how the discretion would be exercised if that stage had been reached. They will be considered very briefly. If the discretionary stage had arisen, the Court would then have had to consider the justness of making an order, and exercise its discretion, taking into account all of the relevant factors, reflecting the emphasis of the broadness of the discretion and reflecting the particular circumstances of the instant case.
149. The Defendants have listed in their skeleton argument seven arguments which should weigh against the exercise of the Court’s discretion if it is prima facie minded to order an interim payment. They will be summarised with the Court’s assessment of each factor.
150. First, it is said that there is a principle that an order should not cause irremediable harm and that an interim payment should be refused here as being disproportionately prejudicial, indeed existential. This is overstating the position: it is a relevant factor and not a principle, if a defendant’s resources are such that an order would cause irremediable harm: see B & C Holdings plc v Quadrex Holdings Inc [1989] QB 842, 867. This means that this factor must be seen in the round and is not necessarily decisive. I should have been minded to admit the evidence now relied upon about inability to make an interim payment. There will be no detailed findings in view of the fact this does not arise for determination. Nevertheless, there would have been concern about how thin the evidence was about (a) the utilisation of the sum of USD 9.45 million, (b) timing of the profits to be received from the Astor-Global Contract, with contradictions about how much would be received and a shortage of evidence as to when it would be received and as to how much would be received at each stage, and (c) a failure to explain why the receipt of such money would be so late and whether the money to be received could have been accelerated through third party finance. These concerns might have resulted in the Court not treating this evidence as decisive against ordering an interim payment.
151. Even if an interim payment were ordered and not paid, that would be equivocal because it might reflect an unwillingness to throw good money after bad. It might in the alternative be because Astor was unable to pay its creditors irrespective of whether an interim payment were ordered.
152. Second, as indicated above, it is said that there are serious doubts over Tripwire’s ability to repay if ordered to do so. It is said that whilst impecuniosity does not disentitle a claimant from an order (see Swissport (UK) Ltd v. Aer Lingus Ltd above at para. 31 of the judgment), the amount specified in the order should reflect the possibility of that a claimant may not be able to comply with an adjustment order thereafter: see the White Book para. 15-111. This point might have been a factor relevant to the amount of the interim payment, but it might have been outweighed by the totality of the factors in favour of an interim payment.
153. Third, the prospect of double recovery is relied upon in respect of discretion. For the reasons stated above, there is a concern about how the orders in the two sets of proceedings would interact. The concern was less about double recovery than the risk that an interim payment, if ordered, would not have been returned. In this way, this second factor has an overlap with this third factor.
154. Fourth, there is reliance on the profit sharing agreement. For the reasons set out above, it is not a relevant factor to the making or quantum of an interim payment, particularly as regards the alternative claim for the sum of USD 9.45 million in respect of the recoupment of expenditure.
155. Fifth, Tripwire has the benefit of a freezing injunction which is said to be a significant comfort. This argument is rejected in that a freezing injunction is not a form of security nor does an injunction enable a claimant to receive money in advance of a final judgment. The fact that a defendant is restrained from dissipating assets does not confer on a claimant the same advantages.
156. Sixth, the Court is asked to take into account the weaknesses of the arguments deployed both as to causation and loss, and also as to quantification if some loss has been caused. This point has prevented the making of an interim payment at the first stage. That is not the same as saying that the arguments were weak, rather that they did not reach the standard required for an interim payment.
157. Seventh, Astor considers that it will be entitled to the costs of the claim as regards at least the fraud and conspiracy claims, regarded by Astor as being “outlandish” claims at this stage. There is no basis to come to such a view at this stage or to reach a final view. The possibility that
Astor might have success on other aspects of the claim might be a relevant, if not very weighty, factor in the balance to be struck at the discretionary stage.
158. As for what was said to be the overriding point about the fact that Astor has received the sum of USD 9.45 million, the Court has set out why that is not a decisive point on an interim payment by reference to the breach of contract damages and it is unnecessary to repeat the more detailed reasons above.
X Interim payment: disposal.
159. For all the reasons set out above, the Court has granted summary judgment on the claim for breach of contract under paras. 27-28 of the Particulars of Claim. The Court refuses to order an interim payment to be made whether on the basis of condition CPR 25.23(b), alternatively condition 25.23(c).
XI Recent development
160. At a time when this draft judgment had been virtually completed for the purpose of hand-down to the parties, the Court received correspondence from the parties to the effect that on 25 September 2026 HMRC had issued a petition against Astor and the hearing of the petition is fixed for 11 November 2026. By a letter to the Court dated 8 October 2026 sent by email on behalf of the Defendants, Withers notified the Court that the petition was served on 7 October 2026. It was stated that steps were now being taken to obtain specialist advice as to the consequences of the petition. It was also said that the effect of section 127 of the Insolvency Act 1986 rendered void, unless validated by the Court, any disposition of the property of a company made after the commencement of the winding up. Astor therefore requested a deferment of the handing down of the judgment to obtain advice.
161. By a letter in response of Greenwoods on behalf of Tripwire dated 9 October 2026, it was stated that the request for a deferment had conflated the handing down of a judgment with whether any interim payment ordered to be paid may be lawfully ordered to be paid. The question of whether any interim payment ordered to be paid may be lawfully ordered to be paid may be considered as part of the consequentials.
162. In my judgment, it is not appropriate to defer the handing down of the judgment in draft. On the contrary, the Court requires the consequentials to be concluded at the earliest opportunity. The Court requires a hand down and order to take place and be made this week, namely the week commencing on 12 October 2026.
163. The Court wishes to thank Counsel and solicitors for the oral and written submissions and for the assistance which they have given to the Court.
Notes
[1] Full text of 62.2(b)(iii) was “Thirdly, Astor might argue that there is a sufficient link between claim and cross-claim, because one of the allegations pleaded in support of the latter is an allegation that Tripwire has (wrongfully) brought fraud claims in this litigation. But this gets Astor nowhere. Even if that were a sufficient connection (which it plainly is not), Tripwiredoesnotseekanysummaryjudgmentorinterimpaymentin respect of its fraudclaims on this application. Rather, it seeks summaryjudgmentandaninterimpaymentonits‘vanilla’breachof contract claim.” (emphasis added)