Miscellaneous United Kingdom

Castle Water Limited v Farid Nabizada

Official source

Neutral Citation: [2026] EWCC 65

Case No: J1QZ9W1Y

IN THE COUNTY COURT AT WANDSWORTH

76-78 Upper Richmond Road

Putney

SW15 2SU

Date: 23/10/2026

Before:

HHJ MARQUAND

– – – – – – – – – – – – – – – – – – – – –

Between:

CASTLE WATER LIMITED Claimant
– and –
MR FARID NABIZADA Defendant

– – – – – – – – – – – – – – – – – – – – –

– – – – – – – – – – – – – – – – – – – – –

John Boumphrey (instructed by Addleshaw Goddard LLP) for the Claimant

James Sandham (instructed by MTG Solicitors) for the Defendant

Hearing dates: 17 and 18 August 2026 and written submissions, 25 August, 1 September and 7 September 2026

– – – – – – – – – – – – – – – – – – – – –

Approved Judgment

This judgment was handed in open court.

………………………..

HHJ MARQUAND

HHJ Marquand:

Introduction

1. The Claimant, Castle Water Limited, supplies water to the laundry business run by the Defendant, Mr Nabizada. The Claimant alleges that the Defendant has used a volume of water and seeks payment of the debt based upon meter readings. The figure of the unpaid charges is £131,492.16. The total sum claimed including legal costs amounts to £298,566.20 excluding VAT. The Defendant alleges that the meter was over recording and that he has been overcharged, although he accepts that some charges are due. The “high level” issue that I have to decide is whether the meter readings reflect the volume of water consumed and therefore the sums claimed are due. There are a number of factual and legal issues to determine in order to reach my conclusions.

2. The time estimate for the trial was two days and it was possible to have the parties’ opening submissions and deal with the factual and expert evidence within that time. However, it was not practical to hear the parties’ closing submissions and therefore this was dealt with on the papers: the Defendant’s submissions followed by the Claimant’s and a reply from the Defendant. I am grateful to Mr Boumphrey, counsel for the Claimant and to Mr Sandham, counsel for the Defendant for their oral and written submissions.

Background

3. The Claimant is the licensed retailer of water and wastewater services and provides the supply to 11 Fairhazel Gardens, London NW6 3QE (the “Premises”), that being the leasehold premises from which the Defendant’s business operates. Thames Water is the wholesale supplier of water and the owner of the water meter present at the premises. The laundry at the premises consists of seven laundry machines and seven drying machines and serves the residents in the Swiss Cottage area. The Defendant acquired the lease on 16 November 2019 and since then has run a laundry and dry-cleaning business from the Premises (although originally as Camden Laundry Ltd).

4. When he took on the lease, the Defendant did not inform the Claimant that he should now be billed for consumption of water and that did not take place until sometime later. When the Defendant received the invoices he believed that they were far too high. There had been a flood in July 2021 which he believed may have been responsible for the apparent consumption of water, which as events have demonstrated was not in fact the case. The Defendant received a number of invoices for significant sums of money and had the Premises inspected by a plumber, who identified a problem with the meter (the “Old Meter” which has the serial number 13311196), but no leaks. The Claimant arranged for a field operations report, which also identified a problem with the Old Meter and the meter was changed on 7 October 2022 (the “New Meter” which has the serial number 130812007). The replacement of the Old Meter was undertaken by the wholesaler Thames Water and the Old Meter was not tested and is no longer available for inspection. At its highest, the average daily consumption (ADC) of water is calculated at 42.15 cubic meters (m3), that is some 8 times more than the consumption had been for a period of time before the replacement of the Old Meter and for a period of time after insertion of the New Meter.

5. I will go into the detail of the evidence below as the central problem in this case is that the Old Meter has not been tested and is no longer available. The Claimant submits on the facts, despite the Old Meter not being tested the evidence supports that it accurately recorded the volume of water consumed, until it failed. The Claimant also states that as a matter of law under the Water (Meters) Regulations 1988 (the “Regulations”) the meter readings are deemed to be accurate, in the absence of the meter having been tested and been shown to be exceeding the prescribed limits of error. The Defendant submits on the facts the Claimant cannot prove the consumption of water and that the Regulations do not lead to the result that the Claimant alleges. There are also challenges to each other’s expert evidence and submissions that the court should draw adverse inferences due to the absence of evidence in certain respects from both parties and in particular the Defendant alleges due to the unavailability of the Old Meter.

The Law

6. The burden to prove the claim is on the Claimant and the standard of proof is the balance of probabilities. However, any party making an assertion must prove it.

Expert evidence

7. Mr Boumphrey agreed the summary of the applicable legal principles for expert evidence and I therefore reproduce what Mr Sandham included in his written closing submissions:

“5. The court's approach to expert evidence is governed by CPR Part 35 and the principles summarised in Kennedy v Cordia [2016] UKSC 6 and TUI UK Ltd v Griffiths [2023] UKSC 48. The court must evaluate: (a) whether the expert evidence is within the witness's expertise; (b) whether it is based on proved or assumed facts; (c) the quality and coherence of the reasoning; and (d) whether it genuinely assists the court on matters outside the judge's own knowledge.

6. The court is not bound by an expert's conclusion and must examine the underlying reasoning, assumptions, and methodology. Where an expert's opinion depends on an assumption that is not made out on the evidence, the opinion carries correspondingly less weight. Answers to Part 35 questions form part of the expert's report.”

8. I add from Tui Lord Hodge’s at paragraph 38:

“I agree with the statement of Jacob J in Routestone Ltd v Minories Finance Ltd [1997] BCC 180, 188 (cited by Lewison LJ in Kingley Developments Ltd v Brudenell [2016] EWCA Civ 980(‘Kingley Developments’) at para 30 and in this case by Nugee LJ at para 83): ‘What really matters in most cases is the reasons given for the opinion. As a practical matter a well-constructed expert’s report containing opinion evidence sets out the opinion and the reasons for it. If the reasons stand up the opinion does, if not, not.’”

Adverse inference

9. In Wisniewski v Central Manchester Health Authority [1998] PIQR P324 Lord Justice Brooke reviewed the authorities and derived four principles (P340) as follows:

“1. In certain circumstances the court may be entitled to draw adverse inferences from the absence or silence of a witness who might be expected to have material evidence to give on an issue in an action.

2. If the court is willing to draw such inferences, they may go to strengthen the evidence adduced on that issue by the other party or to weaken the evidence, if any, adduced by the party who might reasonably have been expected to call the witness.

3. There must, however, have been some evidence, however weak, adduced by the former on the matter in question before the court is entitled to draw the desired inference: in other words, there must be a case to answer on that issue.

4. If the reason for the witness’s absence or silence satisfies the court, then no such adverse inference may be drawn. If, on the other hand, there is some credible explanation given, even if it is not wholly satisfactory, the potentially detrimental effect of his/her absence or silence may be reduced or nullified.”

10. The submission of Mr Sandham is that any adverse inference must be realistic, take account of existing evidence and not be punitive. Mr Boumphrey relies upon Manzi v King's College Hospital NHS Foundation Trust [2018] EWCA Civ 1882 at [30] where the judgment of Sir Ernest Ryder, Senior President, makes it clear that there is a discretion to draw an adverse inference where the four principles in Wisniewski are engaged.

The Water (Meter) Regulations 1988

11. The Water (Meter) Regulations 1988/1048 at the relevant paragraphs provide as follows:

“Testing of meters

6. —(1) The undertakers or any person duly authorised by them may at any time, and shall if so requested in writing by the customer, test the accuracy of any meter which has been installed.

(2) A meter shall be tested in accordance with Regulation 6(2) and (4) of the 1988 Regulations in order to determine whether it falls within the prescribed limits of error (whether or not it is a meter to which those Regulations apply).

(3) The undertakers or any person duly authorised by them may remove a meter from premises where it is necessary to do so for the purpose of testing.

(4) The equipment used for testing shall comply with clause 4.6 of BS 5750: Part 3: 1987((5)).

(5) The undertakers shall provide the customer with a copy of the results of the test. Expenses of testing

7. Where a test is carried out in accordance with Regulation 6 at the request of the customer, and the meter on being tested falls within the prescribed limits of error, the undertaker may recover from the customer the expenses reasonably incurred by them in carrying out the test, not exceeding:—

(a) where the test is carried out by removing the meter from the premises, £70;

(b) in any other case, £20.

Method of proof and effect of meter reading

8. —(1) Where undertakers fix charges in relation to any premises by reference to volume, a reading from the meter installed in relation to those premises proved in accordance with this regulation shall be evidence of the volume of water supplied to those premises, unless the meter is proved to register incorrectly.

(2) A reading from a meter may be proved by producing the certificate of a person duly authorised by the undertakers to read the meter and certify the reading.

(3) A meter shall be regarded as registering incorrectly if on being tested it is found to exceed the prescribed limits of error.

(4) Except where it is proved to have begun to register incorrectly on some later date, a meter which is found to exceed the prescribed limits of error shall be deemed to have done so since the last occasion but one on which the undertakers or any person duly authorised by them last read the meter for the purpose of ascertaining the volume of water supplied to the premises in relation to which it is installed.

Adjustment of charges

9. —(1) Subject to paragraphs (2) and (3), an account shall be taken of the sums payable by the undertakers or by the customer for any period during which the meter has or is deemed to have registered incorrectly; and the balance shall be paid or allowed by the undertakers or paid by the customer, as the case may be.

(2) Where a meter which is connected to a supply of water to a house is proved to have registered less than the volume of water supplied to that house, the balance payable by the customer shall not exceed an amount reflecting the charge for the volume of water which would ordinarily have been supplied to the house during the six months preceding the last occasion on which the undertakers or any person duly authorised by them last read the meter for the purpose of ascertaining the volume of water supplied to the house, less any sums already paid in respect of that period.

(3) Nothing in this regulation shall affect the liability of the customer or the undertakers in respect of any period of account commencing before 11th July 1988.”

12. The Regulations where considered by the Court of Appeal in B & D Clays & Chemicals Limited v Castle Water Limited [2026] EWCA Civ 171. As can be seen, this case involved the same party as the Claimant in this case. Castle Water Ltd brought proceedings to recover charges for water supplied of just over £28,000. Clays argued that a meter was over recording and relied upon the evidence of a jointly instructed expert witness. In the case the meters had been tested in accordance with the requirements of the Regulations and were found to be operating within the prescribed limits. Nevertheless, the expert maintained that there were other circumstances that could affect a water meter. In particular, he stated that the digital dials (I have referred to them as “wheels”) or the meter itself could become enveloped with lime scale and cause it to advance by two digits at a time instead of one. The expert stated that he had been able to infer it on several occasions and he had observed it himself once. Lord Justice Lewis concluded that the proper interpretation of Regulation 8 was that it provided a comprehensive code by which the volume of water supplied to any premises is to be measured and hence how charges are to be determined. At paragraph 41 of the judgment it states:

“In my judgment, read naturally, and in context, Regulation 8 is providing a comprehensive code by which the volume of water supplied to any premises is to be measured and hence, how charges are to be determined. If a properly certified reading is taken from a meter that is found on testing to be registering correctly, the reading shows the volume of water supplied to the premises and is the basis upon which charges may be determined and recovered. Neither regulation 8, nor any other regulation, contemplates that different evidence may be utilised to determine if the meter was functioning correctly or to measure the volume of water supplied in some other way.”

Lord Justice Peter Jackson also concluded that the legislation had all the characteristics of a comprehensive scheme and that there was no indication that any part of the charging regime fell outside its statutory footprint. Lord Justice Peter Jackson stated starting at paragraph 85:

“Parliament is most unlikely to have contemplated the existence of such a state of affairs after a meter has been tested and found to be working within tolerances. …there is no evidence to suggest that customers would readily, or without good reason, embark upon the costly exercise of obtaining expert evidence to challenge the reading from a meter that has passed a test. …A system that allowed parties (customers or suppliers) to deploy lay and expert evidence in an attempt to override tested meter readings would inevitably lead to attempts to do so, …

…

87. My conclusion is that, on a true construction of the legislation, evidence other than that obtained by statutory testing, is not admissible to show that a water meter is unreliable or that the volume of water supplied should be measured in some other way. Any other construction would be unworkable and anomalous.”

13. Lord Justice Lewis stated that customers are given the right to have the meter tested if they considered that the readings do not reflect their water usage. He also stated that there is nothing to indicate that the Regulations contemplated the use of evidence other than readings from meters because of the possibility of an intermittent fault and stated:

“It is always possible for primary or secondary legislation to be drafted differently, or for matters to be expressed more clearly. But the task for the court is ascertain objectively the meaning of the language under consideration.”

14. Lord Justice Snowden gave a dissenting judgement on this aspect of the case. He concluded that whilst a certificate under Regulation 8(2) was evidence of the volume of water supplied to the premises, it was not the only admissible evidence of the volume of water supplied. The Regulation did not state that any reading “shall” be the only admissible evidence and this suggested that the meter reading was not meant to be the only evidence by which the volume of the supply of water to a customer could be proved. Furthermore, Regulation 8(1) did not set out exhaustively the manner in which a customer can prove that a meter is registering incorrectly. The Regulation did not state that the only evidence by which the volume of water supplied to a customer could be proved to be registering incorrectly was pursuant to the test in accordance with Regulation 6. Counsel for Castle Water in that case accepted that a customer would not be permitted to adduce other evidence to challenge a vastly increased bill. Lord Justice Snowden stated, starting at paragraph 70:

“Indeed, the logic of this argument would be that no matter how high the meter reading might be – even if so high that it could not sensibly be thought that the volume of water measured could have been supplied in the relevant period – the same result would necessarily follow and the customer would be liable to pay the bill, no matter how exorbitant and ruinous that might be.

71. Such an interpretation of the Regulations would be absurd and manifestly unjust. I do not consider that such an extreme intention should be attributed to the legislature unless it was necessary to make the regime under the 1988 Act of charging by the volume of water supplied, rather than by rateable value, workable. But in my judgment it is not.”

15. It is not apparent from the judgment that consideration was given to the situation where a meter was not tested at all. All three judgments indicate that under the Regulations the burden is on the customer to establish that the meter reading that has been certified is incorrect.

The Evidence

The Old Meter readings

16. There is no dispute about the actual readings from the Old Meter. The Old Meter was not read regularly but estimated readings are excluded. The most useful figure for comparison is the ADC measured in m3. This figure is a simple calculation of the volume of water represented by the meter readings between the two dates divided by the number of days between the reading of the meter. The table below is derived from the Claimant’s report from Mr Godley as follows:

Date Days between
readings
ADC
(m3)
25 August 2015 249 5.3
27 November 2015 94 5.67
27 May 2016 182 5.26
26 November 2016 183 4.74
31 May 2017 186 4.93
2 December 2017 185 4.88
30 May 2018 179 4.25
26 November 2018 180 4.57
30 May 2019 185 4.20
16 November 2019 170 7.58
17 May 2021 548 33.67
6 December 2021 203 42.15
22 July 2022 228 20.11
13 September 2022 53 2.17
7 October 2022
The New Meter was installed on this day and at that point the reading would have been “0”.
24 1.46
15 November 2022 39 11.10
15 December 2022 30 8.07
21 January 2023 37 4.86
17 February 2023 27 5.30
17 March 2023 28 3.39
18 April 2023 32 3.63
21 May 2023 33 3.48
20 June 2023 30 4.13
22 July 2023 32 3.50
21 August 2023 30 3.37
20 September 2023 30 2.80
21 October 2023 31 7.35
23 November 2023 33 0.24
16 December 2023 23 4.96

17. Mr Godley calculated averages first on the ADCs from 25 August 2015 up to and including 30 May 2019 which gave a figure of 4.87 m3. Secondly, Mr Godley averages the November and December 2022 ADCs at 9.58 m3. I calculate an ADC for all these readings including 15 November 2022 onwards at 4.73 m3.

18. The Defendant relied upon a report from Mr Marshall. Mr Marshall had plotted these ADCs on a chart (the “Chart”) and a lot of reference was made to the Chart during the evidence and it is reproduced below:

19. There is no dispute that the meter failed and was replaced on 7 October 2022. On replacement a different type of meter was used. As can be seen from the meter readings themselves and the Chart, the meter readings taken after replacement were more frequent than that prior to replacement.

20. The Particulars of Claim plead the meter readings actually recorded (it also pleads estimated readings which I do not need to consider) for 16 November 2019 (which must be the last reading from the former occupier), 17 May 2021, 6 December 2021, 13 September 2022 and 7 October 2022. It does not refer to the reading on 22 July 2022 for some reason, but the parties have proceeded with their arguments including this reading. The Defence avers that the readings are inaccurate due to a faulty meter. The disputed readings on the pleadings are therefore those of 16 November 2019 to 7 October 2022. However, there is now no dispute that the readings of 13 September 2022 and 7 October 2022 are inaccurate, but rather than representing over consumption reflect under recording due to the failure of the Old Meter. The readings in dispute concerning over recording are therefore those of 16 November 2019, 17 May 2021, 6 December 2021 and 22 July 2022 (the “Disputed Readings”).

The Old Meter and how it worked.

21. The Old Meter was a Sensus 620 rotary piston with a 25 mm connection size. Inside the external body of the meter are two components that undertake the recording of the volume of water that flows through the meter. First, the measurement chamber and secondly, the meter register. The measurement chamber has a water inlet port and a water outlet port. Within the chamber is a piston and as the water flows into the measurement chamber the piston is turned around and the water exits the outlet port. There are holes in the piston mechanism so that if it does not rotate for some reason, water may nevertheless pass through the meter. If that was not the case the water supply would stop if the piston was completely jammed. The central pin on the piston locates into a toothed wheel on the underside of the measurement chamber which is connected to a magnet. As the piston turns it rotates the magnet.

22. The meter register is a sealed unit. No water flows in or out of it. Beneath the glass front to the meter register is the dial, with the numbers on wheels that record the volume of water that passes through the measurement chamber. Mechanically, the way recording of the volume of water passed is achieved is by a magnet in the meter register which abuts the magnet in the measurement chamber. When the magnet in the measurement chamber rotates, it rotates the corresponding magnet in the meter register. The meter register magnet is linked via a series of cogs to the wheels. Rotation of the magnet in the meter register rotates the wheels via those cogs and this shows the volume of water that has passed through the measurement chamber. The area between the two magnets, which are physically separate from each other but adjacent, is called the “magnetic clutch”.

23. The wheels recording the volume of water have three red wheels at the far right-hand side and then a number of black wheels to the left of the red wheels. The red wheels record the volume of water in litres (there being 1000 litres in a cubic meter). As the wheel to the far right turns after it passes 9 it will turn the wheel to its left and once that wheel has passed 9 it will then turn the next wheel to its left and so on. The mechanism of this is through a series of calibrated connections between the wheels.

24. As I have already stated, the Old Meter was not available for inspection. The Defendant asked the Claimant to provide an equivalent meter, but that was not done. On the day of the trial when Mr Godley attended to give evidence he brought a similar meter to the trial, which Mr Marshall only had a short opportunity to inspect. The Defendant complains about the Claimant’s conduct in this regard however, I have not found it necessary to make any conclusions on this conduct.

The documentary evidence of inspection of the Old Meter

25. On two occasions the Old Meter was inspected. The first occasion was around August 2022 when Khaitco Plumbing Ltd (Khaitco) attended. Recorded on the invoice dated 23 August 2022 was a plumber’s report which is as follows:

“The plumber arrived at 06: 30 PM and started investigating the cold and water systems (sic) and the pipes connections (sic) in the shop. No leaking was identified during the investigation. However, the water meter is not working at all as if its readings is on the 0’s (sic) and needs to be replaced ASAP.”

26. The second occasion was the Claimant’s field visit on 13 September 2022 and the field agent recorded the following:

“Meter is stuck/faulty. Constant ticking on meter and cog is rocking back and forth. Numbers are not cycling. All machines were off. No water being used during my visit. Possible leak on meter.”

Documentary evidence from Thames Water

27. Thames Water replied to an enquiry from the Claimant in an email dated 20 August 2025 from Alice Venman, market development analyst. The email verified four meter readings in 2015 and 2016 and then stated:

“Thames [Water] have never received a report of a leak at the address, nor have we repaired a leak. The consumption on [the New Meter] does not show continuous flow, which confirms there is no leak at this premise (sic), there is no further evidence to suggest or prove a leak, unless the customer has repaired it themselves.

As I confirmed previously, the flooding would have had no impact on the consumption going through the meter.

The notes from your field agent suggests that the meter had stopped registering, however this doesn’t line up with the reads in CMOS [Central Market Operating System], which shows consumption up until the exchange date.”

The Regulation 8 certification

28. By letter dated 3 June 2026 from the Claimant to the Defendant the meter readings for 30 May 2019, 17 May 2021 and 6 December 2021 were certified pursuant to Regulation 8 as being accurate. These are meter readings from the Old Meter and as can be seen from paragraph 16 and the Chart above they relate to an ADC of 4.2, 33.67 and 42.15 respectively.

Mr Beale’s evidence

29. Mr Beale gave evidence for the Claimant. He is a senior key account manager and has worked in the water industry for 36 years. However, he was not acting as an expert witness. He confirmed he was not personally involved in this case. His witness statement detailed the background to the Claimant providing water and wastewater services to businesses in England and Scotland, the Claimant’s terms and conditions, the basis of charging, the evidence of the meter readings in this case and the systems that the Claimant relies upon.

30. He explained that an account system called Velocity is used to manage customers’ accounts. It is a contemporaneous record of activity. The Claimant also has a system called CMOS. This is used throughout the water retail market to manage electronic transactions and data used in the billing process. The entry of a meter reading onto CMOS is a manual process and records the date and the meter reading. If there is a fault in the reading or entry of it on the system then there will be a fault in the invoice.

31. Mr Beale said that in his experience he had never known a meter to over record. He explained that in each case that he knew of where the possibility of over recording had been raised the testing had always shown that the meter was operating within the prescribed limits. He confirmed that he did not test meters himself.

32. When asked about the field agent’s report, Mr Beale said that the ticking showed that potentially water was going through the meter but not recording, although he accepted that the mechanism was defective. He stated that the first indication of a problem was on 23 August 2022 from the Khaitco plumber’s report. He did not find the report very helpful in what it described. In particular there was no meter reading. Mr Beale said that Khaitco had not been ordered to attend by the Claimant as they did not send out third party plumbers.

33. Mr Beale was asked about the significant rises in the ADC after November 2019 from the approximate baseline of 5 m³ and then the reduction in ADC after insertion of the New Meter. Mr Beale did not accept that this obviously represented a broken meter. He explained the water could be flowing straight into the sewer, for example. He also explained that the pipework after the meter was the Defendant’s responsibility. He said that the rocking of the wheels reported by the field agent indicated some consumption and a possible leak. He said it was a good indication that the water was going somewhere as the machines were off. It was put to him that the Claimant’s Reply admitted that there was no leak at the premises, that Thames Water had not identified a leak and that there was no continuous flow when the New Meter had been in place. Mr Beale confirmed that would dispel the leak theory provided that it had not been repaired. He explained that the Claimant bills what the meter records and that there was nothing to say that the meter was defective. The meter was replaced when it stopped working.

34. Mr Beale did not agree that the increase in meter readings was a mystery. He explained that the consumption of up 40 m3 was feasibly usage, given that it was known what the meter was recording. Alternatively, it could be wastage, for example a defective ball valve where water is overflowing: “all day and all night”. Wastage goes through the pipes in the normal way and down the drain. It was put to him that was not consistent with Thames Water recording “no continuous flow”. Mr Beale replied: “was something done on or after[2] 7 October [i.e. the date the meter was replaced]?”.

35. It was put to Mr Beale that he was wedded to the idea that it could not be a problem with the meter and that he was desperate to defend the meter. Mr Beale replied that the meter was only nine years old and it was not his experience that the meter would over record. Mr Beale explained that as the retailer they had paid without question the wholesaler’s charge based upon the meter readings. There had been no complaint about the meter accuracy. He said that the Defendant should be grateful that the meter readings were not higher as Thames Water could have applied an additional charge. He said that based on his 36 years of experience the consumption could easily have been 40 m³. He was asked whether it was normal to bill £127,000 for water consumption and he replied that it depended upon the usage and the business. However, he accepted that it was extremely high-water consumption but that it was based upon what the meter recorded.

36. Mr Beale questioned why the Defendant had not asked for the meter to be tested. He explained that the meter belonged to the wholesaler and the onus was on the Defendant to request the meter to be tested. If not, the Claimant would have to test every meter. Mr Beale explained that the Claimant would send out bills even if the consumption was increased. Mr Beale said that they would not ask Thames Water to retain the meter in this case, unless the Defendant requested it. He stated it was not for the Claimant to arrange for the meter to be tested but if the customer doubted the validity of meter readings then they tested it. Mr Beale was asked why the Claimant did not ask for the meter to be retained and he said that they had no reason to ask for its retention, it was up to the customer to request a test. Mr Beale explained that he was convinced that the meter had recorded water consumption and unless it was found to be defective, they billed. Mr Beale said he did not know if it was water usage or wastage but that the Defendant should have asked for the meter to be tested.

37. Mr Beale also gave evidence about the flooding episode (which was agreed not to be relevant) and the entries on Velocity. Mr Beale had not made any of the entries on Velocity and this was a way of introducing that material, which the Defendant was also asked about. I do not think it is necessary or proportionate for me to separately detail Mr Beale’s responses to the questions that were put to him. I have set out the relevant entries when considering the factual evidence of the Defendant.

Extract from statement of account

38. The statement of account included the billing history. The following extract shows the initial billing and balance owed. It can be seen that the sums billed initially were credited back to produce the line on 29 July 2022 with a balance due of £83,300.50.

Date Type Bill number Debit Credit Balance
29/07/2022 Bill 7644766 £83,300.50 £83,300.50
28/07/2022 Bill 7641471 £9,187.72 £0.00
28/07/2022 Bill 7641469 £25,849.64 £9,187.72
28/07/2022 Bill 7641468 £41,289.12 £35,037.36
28/07/2022 Bill 7641465 £6,795.15 £76,326.48
27/07/2022 Bill 7635888 £6,795.15 £83,121.63
26/07/2022 Bill 7630596 £25,305.40 £76,326.48
14/06/2022 Bill 7496608 £25,305.40 £101,631.88
13/06/2022 Bill 7486325 £41,289.12 £76,326.48
13/06/2022 Bill 7486324 £25,849.64 £35,037.36
13/06/2022 Bill 7486322 £9,187.72 £9,187.72

The Defendant’s evidence

39. The Defendant had prepared two witness statements. The first dated 27 June 2023 was prepared in support of an application to set aside judgment in default and the second dated 23 February 2026.

40. The Claimant sought to undermine the Defendant’s credibility in a number of ways including:

i) the Defendant dissolved the company, Camden Laundry Ltd on 9 July 2024, after these proceedings had been commenced. It was put to him that he did this in order to try and avoid liability for bills. The Defendant denied that was the reason and stated he did not know it would get this far and that he was willing to pay the correct amount of the bill.

ii) The Defendant was asked about other businesses that he ran including LQ Tailoring in Piccadilly. He was asked whether cleaning took place and he answered: “dry cleaning”. He denied using water at that premises for laundry. He denied knowing that this business’s website stated that that business had 15 vans in operation. He explained that he had one person working in Camden and 8 to 9 people in the city. He was asked why there was no witness statement from his employee, at Camden (the “Assistant”)[3].

iii) The Velocity records were put to the Defendant. In particular, it was put to him that when he took over the premises in November 2019 he had failed to inform the Claimant that he was now responsible for the bills for water consumption. He had not become known as the customer until he contacted the Claimant on 7January 2021. The Defendant explained that he thought that the previous owner would notify the change. I have dealt with this below.

iv) The Defendant had not provided any evidence in his witness statement of the systems in operation at the Premises. He had not provided any details of his accounts, the activity of the business, electricity bills, the information that was capable of being derived from the washing machines about cycles performed. The Defendant accepted these could have given an insight into the level of activity of the business and therefore water consumption.

v) The Defendant confirmed he only attended the premises about once every three to four weeks, unless there was a problem. If he was busy he did not attend the premises.

41. The Defendant stated that he took over the business at the premises on the 16 November 2019. He had been in the family laundry business since 2006 and had extensive experience of how a launderette works. He did not need any assistance from the previous owner. At the time the Assistant was new to the business but he had extensive experience with similar machines.

42. The Defendant asserted that the business did not have the capacity to use up to 40 m³ of water daily. The Defendant explained that there were two tanks in the basement of the premises. Only the right-hand side tank was used. Each tank had a connection through a pump to the washing machines on the floor above. There was a drain at the bottom of each tank which was connected to the sewer system, in the event that a tank needed to be drained. The Defendant did not know whether there was a ballcock in each tank. The Defendant did not know if there was an overflow pipe, in the event that the tank became overfull, perhaps because the ballcock had stopped working. However, he accepted that technically it should have an outlet in case of overflow. The two tanks were separate, he said.

43. Each tank was filled two to three times per day, depending upon the amount of washing being undertaken. At this point, the Defendant used the word “tanks” in the plural but I am satisfied that this was a “slip of the tongue” given the context of his other answers. The Assistant will deal with this he said, as he sees necessary. The Defendant explained that if the tank became overfull that would be seen as soon as you walked into the room. The Defendant explained that the water was turned off at the end of the working day and on again in the morning. The Defendant said he inspected the tanks on a weekly basis, but this was contradicted by a later answer that he went every three to four weeks to the premises.

44. The Defendant was asked what he did when he received the large bill. He replied that the pipes were checked to look for leakage on a daily basis. When he received the bill of £83,300.50 (see paragraph 38 above) he was asked what he thought was wrong and whether he checked his systems. The Defendant replied that he thought it was the Claimant’s mistake. He also said that the pipes were checked and no problem could be seen.

45. The Defendant was asked about his initial contact with the Claimant, as recorded on Velocity on 7 January 2021. He was asked why he had not contacted the Claimant having taken over responsibility for the premises and he replied that he believed the previous owner had notified the changes and that he might have called to affirm them. It was put to him that the statement of account did not show any sums until 13 June 2022 and the 1st bill was dated 26 July 2022 and totalled £76,326.48. The Defendant replied that he believed that a bill had been received in March 2020 and that after Covid hit the business they had a very high bill of over £10,000 and that was the first or second bill. He believed he first objected to the bills in 2020. The Defendant said that he had had bills from Castle Water up to June 2022 but had not paid them as there was a dispute going on. He disputed that the first time the Claimant new “of his existence” was in January 2021. He denied receiving bills in the name of the business that previously occupied the premises.

46. In his 2nd witness statement, the Defendant did not refer to any contact with the Claimant prior to the middle of July 2022 when he recorded speaking to the Claimant’s call handler about the bill that he had received.

47. The statement of account shows that the Defendant made two payments to the Claimant. First on 18 March 2025 the sum of £750 and secondly on 28 February 2026 the sum of £8,000. The Defendant explained that the payment in March 2025 was because there was a dispute over the bill and the Claimant was asking for £11,000 per month and he did not consider that he was obliged to pay this bill. When asked whether he had not made a payment between 29 July 2022 and 18 March 2025 he replied: “could be”. When asked why he had not made payments before that date the Defendant said that he was willing to pay but no one from the Claimant would verify the undisputed amount.

48. The Defendant stated that he did not believe he had an obligation to check the meter in this case. He stated that he could have asked to have it checked but it was not “his asset”. He did not believe it was his obligation to request the meter to be tested. The Defendant had not taken any readings of the meters himself, he said because it was not giving the right reading. The Defendant denied that the Assistant had caused the problem or that he had replaced the ballcock. He explained any mechanical works were done under his supervision. He could not comment on why the New Meter recorded an ADC equivalent to 11 m³ after replacement.

49. In his second witness statement, the Defendant stated that he stopped trading due to Covid restrictions around 10 March 2020 and then from June 2020 operated the laundry for a few hours a day on a weekly basis. He resumed trading in or around July 2021 but the sales did not return to pre-Covid levels. He stated the gross income was between £100 and £200 per week and machines were not running as frequently as they had been. His evidence was that the invoice for £83,300.50 averaged at £2,450 a month which was not proportionate to the level of trade, particularly considering the closure due to Covid.

50. The Defendant also gave evidence that on 12 July 2021 there was a flooding incident at the premises. The basement was flooded with water to more than a metre high and it lasted several hours. The damage was rectified by the insurance company and the laundry was closed for a few days.

51. In his second witness statement, the Defendant stated he was encouraged to complete a Leak Allowance Form by the Claimant’s call handler. He denied having reported a leak at the premises but referred to the flood on 12 July 2021. He explained his consistent position was that the Old Meter was defective and not accurately recording actual water consumption. He referred to an email from the Claimant’s call handler of 28 July 2022 which referred to that flood and stated:

“so need LA application [leak allowance form] to see what is happening was it a leak or a flood?”

There is a similar entry on Velocity for that date (I have not reproduced it). The Defendant’s evidence was that the record was inaccurate as he had not reported a leak to the Claimant or Thames Water. What he had reported was the flood in July 2021. However, he completed the Leak Allowance Form, he said on the recommendation of the call handler and returned it on 29 July 2022. I will return to this below.

Mr Wahidullah Nabizada

52. Mr Wahidullah Nabizada is the Defendant’s older brother and he also runs a laundrette and dry-cleaning business. His evidence was that his average cost on a monthly basis between January 2020 and September 2022 was £269.70 for water that is also supplied by the Claimant. Mr Wahidullah Nabizada’s evidence on questioning was that he had 13 washing machines, two large, five medium and six small. He kept track of all the bills on monthly basis and how much people paid.

Mr Ahmad Nabizada

53. Mr Ahmad Nabizada is the Defendant’s cousin. He also runs a launderette business and the Claimant supplies the water. His evidence was that his monthly cost between January 2020 and September 2022 was £268.46. In cross-examination he accepted that he had not produced the bills to substantiate the average cost. He also accepted that his launderette used the same machines and dryers but it was not the same plumbing system as the Defendant’s business.

The direction to the parties for permission to rely upon expert evidence.

54. At a contested directions hearing I made a direction that each party could rely upon one expert, confined to the following issue:

“The function of the meter and recording of meter readings (from [the Old Meter]) in this case and the role the fault played in those readings.”

As will become apparent, the experts have looked at matters outside that issue. In particular with regard to the Defendant’s expert, Mr Marshall, Mr Boumphrey urges me to disregard his evidence where it goes beyond that issue. I will deal with this below but it is necessary for me to set this direction out now to understand some of Mr Boumphrey’s questioning of Mr Marshall and comparison with the report from Mr Godley.

Mr Godley – the Claimant’s expert

55. Mr Godley had prepared a report dated April 2026, he had provided answers to Part 35 questions and taken part in a joint meeting with the Defendant’s expert, Mr Marshall. Mr Godley works at the Water Research Centre Ltd (WRc). He has over 35 years of experience specialising in flow measurement and metering technology. He has been involved in a number of projects involving meters and their application in water and wastewater. His current responsibility at WRc focuses on flow technology and metering including running meter test programs and overseeing the meter testing services. He sits on various committees helping draft standards for flow measurement technologies, including water meters. Specifically, amongst his experience, he has carried out laboratory and field testing of water meters. He has carried out investigations into water meter failures and conducted studies on lifetime changes in accuracy of meters. He has drafted recommendations to Ofwat for inclusion in industry reporting requirements and the maintenance of meter accuracy, which have recently been published.

56. The summary of Mr Godley’s report is that the meter readings show that the total recorded consumption increases over time to the point when the meter was replaced. This indicated that the meter mechanism was continuing to turn. However, the period before the reading taken on 16 November 2019 showed an ADC that he would expect for a meter of this size. The ADC after 16 November 2019 to 22 July 2022 increased significantly to a value higher than he would expect for a meter of this size.

57. In his report Mr Godley compared information from similar meters to the Old Meter that had been tested at WRc. Those meters had not stopped working completely and he pointed out there was not an exact correlation because of differences in the meter connection size. That data showed that for a 25 mm rotary piston meter (the Old Meter had a 25 mm connection size) an average annual consumption would be 4.07 m³ per day, although there was a range to a maximum of over 30 m³ per day. The table that Mr Godley produced showed that the maximum was 30.31 m³ for a 25 mm connections size, although the maximum across the various connection sizes tested was 32.41 m³. Mr Godley concluded that as the Old Meter was in a launderette higher than average consumption would be expected. He stated that many of the premises with a meter of this size would be shops or office accommodation where water was mostly used for staff welfare and he had no reason to doubt the accuracy of the meter readings up to and including 30 May 2019. In answer to Part 35 questions, Mr Godley stated that he had never seen a meter of this type over record by such a large amount and therefore considered the increase was due to the amount of water passing through the meter. WRc does not hold information about typical water consumption by launderettes or the nature of the premises from which the meters were taken.

58. Mr Godley’s opinion of the readings of 16 November 2019, 17 May 2021 and 6 December 2021 was that they showed a significant increase in water consumption. Those for May and December being equivalent to 37.91 m³ ADC, 8 times the previous figure. Mr Godley also commented that that was significantly above consumption levels assessed from similar meters that WRc had tested (as above).

59. The consumption indicated by the final two readings from the Old Meter showed a significant decrease in the ADC, which was below the average for this size of meter, but within the range of values of WRc’s test records. The average of the ADCs indicated by the New Meter Mr Godley assessed at 9.58 m³ for first two readings in November and December 2022 and 3.92 m³ for the readings from January to December 2023. He had no reason to doubt the accuracy of the readings of the New Meter.

60. In his report Mr Godley set out circumstances when a meter may fail. He dealt with mechanical wear and stated that this tended to lead to under recording. However, he set out a table which analysed the sample of meters that were similar to the Old Meter, as previously discussed. He identified that in those meters with a 25 mm connections size two showed over recording with an average error exceeding 5% with the highest over recording error observed at 6%. In answer to a Part 35 question Mr Godley confirmed that within WRc’s entire database of 14,000 sets of meter results there were no instances of highly over recording piston meters. The meters in the dataset were at all stages of their operational life. Another question was whether Mr Godley had made specific enquiries within WRc as to whether cases of over recording by more than 6% had been identified. His reply was that none of his colleagues had reported finding rotary piston meters over recording by more than a few percent. In cross-examination when asked about whether all the meters in the dataset that he had relied upon were working he replied that they were working to some extent. He was asked where the data was for failed meters and said that he could provide it but did not think it was pertinent to the question that had been asked. He had not been asked to report from meters close to the end of life.

61. It was put to Mr Godley in cross-examination that his position was getting close to that of Mr Marshall and I recorded his reply as: “we have not conceded the meter over recorded”. I was surprised by this response as first, it seemed argumentative and secondly, he was supporting the Claimant’s case rather than giving his independent view to the court by stating that “we” had not made a concession.

62. Mr Godley identified in his report clutch slippage, piston jamming, vibration and meter register failure as causes of under recording. He identified that air passing through the meter will lead to the piston rotating much faster and the meter over recording. If that was prolonged, it could cause the meter to wear rapidly and fail and would also cause the meter to be very noisy. Air bubbles would also lead to over recording. In considering meter register failure he stated that he cannot recall seeing a meter where rotation of a smaller digit would push on a higher value digit before it had fully rotated and stated that an examination of the arrangement of the gears, cogs and dials (which I have referred to as wheels) in the meter register would be necessary to verify whether this was possible or not. In answer to a Part 35 question about whether it was possible for rotation of a smaller digit to prematurely advance a higher value digit, Mr Godley answered that he had not observed such a phenomenon. In cross-examination on this point, Mr Godley said that he was not saying it could not happen. Another Part 35 question asked him whether over the Old Meter’s nine year operational life there was a significant potential for mechanical wear and debris within the meter register. Mr Godley’s answer was that it was likely there would be some mechanical wear. However, the register was a sealed unit and therefore debris from outside could not have entered it. In answer to another question, Mr Godley stated that WRc does not carry out internal examination of meters unless specifically requested. None of the sample he relied upon to prepare his report would have had internal examinations (i.e. the 1,142 meters). In cross-examination, Mr Godley explained that the meter register was a sealed unit and scaling or debris could not enter it. He was asked whether the teeth could snap off one of the cogs and prevent them from spinning and he replied that there was a gear between the cogs that turns the numbers so even if a tooth snapped off one cog it would not link it to the other (the premise behind the question being that if this did happen it could lead to apparent over counting).

63. Mr Godley was asked in cross-examination about over recording meters. He replied that he had not seen one over record and that WRc did not carry out speculative tests. He tested many meters and the mechanism tended to under record. Any over recording is only by a very small amount. Mr Godley said that he had not seen over recording and that is why he had not explained the mechanism for over recording. The physics, he explained, tended to lead to under recording and that it was highly unlikely that the Old Meter over recorded. If the piston was jammed then no flow would be recorded and that would not lead to the high ADCs seen in May and December 2021.

64. In cross-examination, Mr Godley was asked how over recording might happen. He explained that early on in the life of a piston meter over recording of approximately over 2% can happen. This was due to the forces on the piston and friction being affected by a layer of water lubricating the piston. The extent of any over recording would be also dependent on the flow rate. If readings were always taken at the peak of the error curve then there was over recording. My impression in relation to this answer was that Mr Godley was careful to stick to his evidence but had not really applied his mind to how over recording might happen.

65. In his report, Mr Godley considered how the fault conditions he had observed in similar meters applied to the Old Meter. He pointed out that the meter numbers continued to increase in the Old Meter indicating the mechanism continued to turn and rotate the wheels. He considered the Khaitco document was unclear. In particular, the wheels could not have been at “0” as they cannot be reset to 0 unless every single one of them had reached the number 9 so that they went back to 0, which he considered to be highly unlikely. His opinion was that it was more likely that the Old Meter did not record any increase while the plumber was present. No consumption being recorded indicated the meter may have stopped at that point. The field agent report of rocking and ticking indicated a partially jammed piston, where a small amount of water was seeping through at a rate insufficient to turn the piston. A higher flow would overcome the jamming and Mr Godley stated that this would explain the lower readings from September and October 2022. Mechanical wear would in his experience cause the meter to under record. In rare cases of over recording Mr Godley’s opinion was that it was typically by less than 6%, which would not be consistent with the eightfold increase between May 2021 and December 2021.

66. In cross-examination Mr Godley stated he was not able to comment upon Thames Water’s or the Claimant’s policy on when to test meters. He said he had no comments on whether the meter should have been retained, and my impression was that he was rather avoiding giving an answer to this question. It was pointed out to him that in the joint statement he had agreed that the Old Meter should have been retained and/or tested following exchange. He stated he had not changed his view as if it had been tested “we would not be here”. He said that we would then have known whether it was over recording or not.

67. Mr Godley agreed that prior to the reading in November 2019 the ADC was 5 m³ and that that was a useful indicator of typical consumption up to that point. Mr Godley agreed that the increase to 42 m³ showed a dramatic spike but there were a number of points where readings were not taken. Mr Godley accepted that the 37.9 m³ ADC he had calculated and referred to in his report was an outlier. He had never encountered this level of ADC before, the maximum being 30 to 32 m³. He agreed it was unusual. He also agreed that it was possible that there was a fault with the meter that he had not seen before but it was unlikely. However, again he said he had never seen an ADC as high as this and it was higher than in the database. It was put to Mr Godley that the fall in meter readings after the New Meter was installed made it obvious that the Old Meter was at fault. Mr Godley replied that the consumption dropped before the meter was replaced but there were not enough readings taken and he said he could not comment on whether a consistent consumption rate was likely. He did not agree that there was necessarily a correlation with replacement of the meter and the reduction in the meter readings. In re-examination Mr Godley stated that the readings from 13 September 2022 through to 15 November 2022[4] did not tell one anything about the consumption between those dates as the Old Meter was not working.

68. Mr Godley was asked about the Chart and said he could see the pattern of the meter readings on the Chart. He was asked to comment on the Chart after the peak reading before the replacement of the meter and he said he could not comment because he did not know what the consumption was. He saw that the readings decreased before the meter was replaced. Mr Godley said that if the Old Meter was available he would be very curious to examine it given what had happened.

69. In cross-examination Mr Godley was unable to answer where the water had gone and said that the only information that he had was in the document provided and on a site visit that he did with Mr Marshall. Mr Godley accepted that the measured flow rate into the tank at the premises was 4.6 m3 per hour and this is recorded in the joint statement. In the joint statement Mr Godley’s gave his opinion that such a flow rate was above the “Q3” value for the Old Meter, which was 4 m3 per hour. If this occurred frequently and over extended periods it would be likely to lead to damage to the meter. In the joint expert meeting, Mr Godley estimated the total capacity of the tanks at 4.5 m³ (Mr Marshall estimated the useful capacity of both tanks at approximately 3 m³). Mr Godley was asked in cross-examination whether he accepted the calculation conducted by Mr Marshall set out in the experts’ joint note (but not in the “agreed” column) that it would take 9 ½ hours each day to fill the tanks (based upon 44 m³ ADC and the flow rate measured and agreed by the experts). This question was asked twice and on the 2nd occasion Mr Godley answered that he understood the calculation.

70. Mr Godley was asked about the cross-examination of the Defendant concerning whether or not the ballcock in the tank was functioning. Mr Godley said that the theory had not come from him and he only knew about it on the morning of trial and it was new to him. He was then referred to the experts’ joint note at question 13 which was “whether the high readings were due to consumption” and his reply where he stated:

“This remains my view considering that, in over 20 years of testing and overseeing testing of meters, I have not seen a meter of this type over record to the extent indicated. Leakage would have required the pump to run continuously such that one or more of the appliances served (basins, toilet, washing machine and electric boiler) was kept continuously supplied to the point where an overflow occurred, and/or the ballcock in the tanks to fail such that the water supply was not shut off. This would likely have led to a visible flood of the area.”

71. Mr Godley was again asked whether the ballcock theory came from him. He replied: “not exactly in the way that was implied”. In his written response he was stating that if water rises to push up the ballcock then the diaphragm seal can fail and the water continues to flow. He could not say where the water would flow but it would go somewhere and he did not know whether there was an overflow pipe (as he could not see that when he inspected the premises with Mr Marshall) or if there was, whether that had the capacity to discharge 40 m³ of water. It would not be necessarily noticeable but he could not speculate. He did not agree that the water of that volume would be audible but he did agree that it would be a lot of water in the basement.

72. Mr Godley was asked about the email from Thames Water dated 20 August 2025 which referred to not showing continuous flow. Mr Godley’s reply was that the high meter readings were very unlikely to be a problem with the meter. He said that having thought about the reference to “no continuous flow” he thought it was highly unlikely. He did not understand how Thames Water could have reached that conclusion.

73. Mr Godley was asked in cross-examination about the implication of the water to the tanks being turned off for 12 hours a day (on the basis of the Defendant’s evidence the supply to the tanks was turned off at the end of the working day). Mr Godley’s response was that this was a lot of water for the flow rate. It would be above the maximum flow rate for the Old Meter and lead to it failing.

74. In re-examination Mr Godley was asked about the ADC from 15 November 2022 at 11.10 m³. He explained that it was the average daily consumption based on the 39 days after replacement of the meter. He agreed that it was approximately twice 5 m³. He agreed that the suggestion that consumption after the peak on 6 December 2021 was the fault of the Old Meter was not correct as on 15 November 2022 the consumption was 11.10 m³. Mr Godley explained that in his view the reading after the peak on 22 July 2022 showed that daily consumption was dropping month by month. He was asked whether this must have been a change in water consumption and he answered that the ADC had changed. Mr Godley was asked about the meter register and the proposed mechanism of a damaged cog moving on two wheels at the same time. Mr Godley said that this was quite unlikely. The meter registers were manufactured in tight conditions and nothing outside could get into the sealed unit. In addition, the meter register was mounted facing outwards and anything loose would fall to the bottom of the unit. Water would not get into the meter register unless the glass was damaged and any water entry to the rear was unlikely as the meter register was contained in a “shroud”. It would be unlikely for shards of glass to cause the meter to jump as they would cause it to jam and under record. He accepted that it was an analogous situation to a car’s odometer but the detail of the driving mechanism was different. In this case there was a magnetic clutch and he did not know how that mechanism worked in an odometer. He did not believe that a magnet would provide sufficient force to break a cog and he could not think of a mechanism that would cause this. Failures of the magnetic clutch led to under recording as the magnet slips and the piston does not turn to keep up. Mr Godley confirmed that water meters tended to be more accurate in the middle of their capacity range and that high flow would show under recording at the top end of the range.

75. Mr Godley explained that if the meter register wheels broke it would not stop the flow in the measurement chamber as the force and flow on the piston would be greater than the force of the magnetic clutch. He had seen displaced wheels in the meter register due to vibration but never seen broken wheels. In his report he stated that this resulted in the dials in the register failing to turn, and thus the meter was not recording any water passing through the meter.

Mr Marshall – the Defendant’s expert

76. Mr Marshall provided a report dated 17 April 2026, he answered the Claimant’s Part 35 questions and took part in an experts’ meeting with Mr Godley. Mr Marshall has been a chartered engineer since 1985, he is a fellow of the Institution of Mechanical Engineers and in his CV stated that he was accredited as an expert by Cardiff University in 2005. He identified having given three lectures as an expert witness, his present role as a director of a firm of consulting engineers and his previous roles in engineering. In cross-examination he was taken through each of these matters and I can summarise the answers by stating that Mr Marshall has no experience in water meters as an expert or in his current or past roles as an engineer. When asked why he had accepted instructions he said that he had looked at the nature of the problem and decided that it was so simple anyone with experience in mechanisms could deal with it. He accepted he was not an expert in water meters but he was an expert in mechanisms. He explained he had assisted in many legal matters where he was not an expert. He said nothing hinged on the minutiae of water meters in this case. Mr Marshall said that as far as he was aware he had not held himself out as having more experience than he in fact had. He agreed that the first time he had indicated his lack of direct experience in water meters was in paragraph 1 of his answers to the Part 35 questions. However, he stated he had not asserted such knowledge in his report. He did not assert it or not assert it, he said. He had no discomfort in saying as such. Nothing he had seen had made him feel a lack of experience or knowledge in what he discussed.

77. In Paragraph 8.5 of his report, Mr Marshall stated that it was standard practice for energy utilities to have independent inspection of their meters where there was a billing dispute. He was cross examined on “standard practice” and initially answered that he did not get to inspect the meter but on further questioning accepted that this statement was questionable and it may not be the case. He said: “I concede that point”. He was asked about whether he had looked at the Government website for independent testing for gas, electricity and water. He accepted he had not checked the website, although he had heard of it. He said in engineering practice you came across such things and it was common sense. He denied that he was making arguments to assist the defence. He said he did not know what the defence case was when he was instructed. When pointed to the letter of instruction (that he had exhibited to his report) he clarified that he had not known in a technical sense, only the bare bones of the dispute over the meter. Mr Marshall said that he had to consider what was the best fit to what happened in the context of the dispute.

78. In his report, Mr Marshall set out the background. He dealt with the scheme of charges for Thames Water customers in particular the disposal of effluent, although that is not apparently relevant to this dispute nor to the issue on which as an expert he was asked to report. There is a section dealing with “implied daily usage” from the meter readings, including the Chart. He included other representations of consumption by way of charts. Section 4 dealt with replacement of the Old Meter, the reports of Khaitco and the field agent as well as commenting on Mr Beale’s statement. Section 5 dealt with the flood in July 2021 and section 6 was his executive summary. In this he concluded that the flood was not relevant, the New Meter was accurate and that the “average normal daily demand of this laundry was approximately 5 m³ per day”. He stated he was not an expert in geological matters, but he had assisted with disputes involving large escapes of water. He carried out a calculation to conclude that the volume of water overall equated to 7.46 Olympic swimming pools or it would have filled the basement completely once every two days in the first half of 2022. He stated that the soil was relatively impervious and such a degree of flooding would surely have been reported by neighbours. He concluded that the most obvious and probably correct explanation was that the Old Meter recorded high volumes erroneously from the end of 2019 before 13 September 2022. He stated the meter was nine years old and it was probable that it experienced an intermittent failure mode before its final failure. He stated that he had been told by the Defendant that there had been no material change to the number or types of washing machines or any significant maintenance that would provide an alternative explanation for the measurements once the New Meter was installed. He referred to an appendix including a description of known failure for “such wheel counter mechanisms”.

79. Mr Marshall concluded with alternative explanations. First a step change in consumption of water which immediately reversed on installation of the New Meter. Secondly, a long-term leak representing approximately half a basement full of water each day, which had been dissipated without affecting adjacent properties. He stated both appeared to be “inconsistent” with the evidence. By which I take him to mean the explanation that he favours is that the Old Meter was defective and over recording.

80. In appendix B Mr Marshall analysed the mechanism of meters and referred to the specification of the Old Meter, although commenting that he had not seen it. He described in detail how the mechanism of the wheels worked in order to record the volume of water consumed. He stated that until fairly recently, motor vehicles had mechanical odometers which used extremely similar mechanical principles. The difference being that the drive came to the wheels (in the dial) using a mechanical cable. He stated:

“It was occasionally observed that adjacent wheels could effectively stick together, possibly when a piece of foreign matter or broken gear tooth lodged between adjacent wheels. This resulted in an erroneously high mileage being recorded. I cannot say that I have personally witnessed mileometer wheels locking together in this way, while it was a widely recognised phenomenon. I have rebuilt such classic speedometers containing such odometers.”

81. Mr Marshall stated that this would be a “possible explanation” of how a failing water meter might record higher volumes than the actual consumption. Adjacent wheels locking together would multiply consumption by 10-fold. He concluded that this was the most likely explanation of the apparent consumption having been increased from 5 m³ up to 44 m³ then having abruptly dropped to 0. In response to the Claimant’s Part 35 questions, Mr Marshall repeated his conclusion on the most likely explanation for the increase in meter readings being adjacent wheels locking together, but he confirmed that he was not aware of any published literature on this point.

82. Mr Marshall also gave an opinion in the Part 35 answers that if the piston is jammed it is: “…very unlikely that the volume of water required by commercial laundry could have been supplied past a jammed piston, by means of seepage alone.” It is not necessary for me to detail the remainder of the answers he gave to the Part 35 questions which supported his report.

83. In cross-examination, Mr Marshall was asked whether he had a definitive document explaining the pipework or tank configuration at the premises. Mr Marshall’s answer was that he had not been given any documentation but after writing his report he went to visit the premises. He made the arrangement with the Defendant directly. He spoke to the Assistant and the Defendant was present. He was told that the water and pumps were turned off outside business hours. The Defendant did not say much he said. He did not make a record of the discussions. He obtained information about how the launderette operated from the Assistant. Mr Marshall was asked about the fairness of this given that both sides should have access to information and be able to interrogate it fairly. Mr Marshall replied that this is why he had suggested a meeting with Mr Godley at the site. Mr Boumphrey in cross-examination said that the use of any information from the Assistant or Defendant was improper. Mr Marshall’s reply was that this was a legalistic question. He was asking how they operated the business, the Defendant had given oral evidence and he assumed that everything significant had been covered.

84. Mr Marshall said that his principal hypothesis was that the increased meter readings were due to a break down in the numbering in the meter register. However, he said other explanations may exist but that he was looking at the “best fit” of the evidence to the hypothesis. He explained that the issue with adjacent wheels jamming was fairly well known to him. In answering question 12 in the note of the joint meeting Mr Marshall had stated that: “I am familiar with very similar odometer counting mechanisms over recording, by factors of 10.…”

85. Mr Marshall was asked about his “familiarity” and explained that he owned eight classic odometers and that he had had over 20 “in his hands” over the past 58 years. He had not seen this phenomenon himself nor was there any published material. However, he had seen it on internet discussion groups. It was “technical stuff”. He said that he had been in touch with two repairers. One had said that he had seen this with the two wheels jammed together and he could repair it for £40. He had not named the mechanical engineers or identified them in his report.

86. Mr Marshall accepted that the meter register was normally a sealed unit. Although he was not an expert, he had taken two units apart recently to see how they worked. He had seen from the Internet details of teeth in the gears in mechanisms of a similar type, although not in water meters. He found very little on the Internet about defects in water meters.

87. Mr Marshall was asked whether he accepted that he had no experience of water meter testing or experience of water meters to put his theory into context. Mr Marshall said that his commentary was entirely on the mechanism. He did not accept that his evidence was outside the instructions that he had been given. His duty was to help the court to understand the technical issues and what hypothesis fits the known data.

88. Mr Marshall was asked about paragraph 6.8 of his report where he stated that he asked the Defendant’s solicitors whether there had been a material change in the number or types of washing machines. Mr Marshall said he had asked the solicitors when preparing his report. He did not recall whether he had asked any other questions. He was asked whether his report remained the same if he was told that what the Defendant solicitors had said was untrue or unreliable. His first answer was that he was just tying up a detail. His second answer to the same question was if he was told that 80% of machines are not working that might have changed his opinion. It was put to him that he had an obligation to put in his report if a particular matter was not true then there were consequences for his opinion. Mr Marshall’s response was that would make his report three times as long and was not very important. He denied he was trying to favour the Defendant.

89. Mr Marshall was asked about the Chart and in particular the ADC for 15 November 2022. He agreed that the ADC was 11 m³ but denied that it was inconsistent with the normal operation of the launderette at 5 m³. He explained that the data points when taken close together will be more jagged (i.e. they will be more variation). He said that the 11 m³ ADC could be explained by a short period of a 100% increase in business. However, he said that he did not think it was statistically significant and doubling was feasible. He denied that he had failed to address something that might assist the Claimant’s position.

Decisions and reasons

The effect of the Regulations

The parties’ submissions

90. The Claimant’s submissions are that the meter readings provided are sufficient and should be used to determine the Defendant’s water consumption. There was no request to test the meter and Regulation 8(1) and Regulation 8(2) are applicable. A certificate of the meter readings has been provided. The absence of a test of the meter means by virtue of Regulation 8(3) that the meter readings are to be taken as proof of the consumption.

91. The Claimant further argued that the meter failed completely on or about 13 September, but the best evidence was it was under recording between 6 December 2021 and 13 September 2022. By virtue of Regulation 9(1) and/or 8(4), the Claimant would be entitled to make an upward adjustment to the bill to represent that period of under recording. If the court determined that the failure of the Old Meter on or about 13 September 2022 amounted to a test where it was found to be exceeding the prescribed limits of error, then the recalculation allowed by Regulation 8(4) must be applied.

92. The Defendant’s submissions were that the certificate dated 3 June 2026 only provides that a reading was taken and recorded by an authorised person. It does not prove that the Old Meter registered accurately. It was said that it was taken after the Old Meter was destroyed and was litigation driven rather than contemporaneous. It was submitted that it was internally unreliable as it was headed with the reference number of the New Meter and referred to a period of 7 October 2022 to present, but purported to certify readings as recorded on the Old Meter. The reading was rebuttable within the statutory scheme.

93. The conditions for treating a tested meter as accurate include proof that (i) the meter tested was the meter in question, (ii) it had not been adjusted, tampered with or altered, and (iii) the test was made within such time and under such circumstances as to be a proper guide to the amount consumed. None was satisfied here. The Old Meter was never tested and was destroyed. Reliance was placed on Nidderdale Rural DC v Lloyd [1964] 1 WLUK 416 (which was not in the authorities bundle),

94. The Defendant also submits that the comprehensive code argument relying upon Clays is misconceived. Lord Justice Lewis and Lord Justice Peter Jackson were in agreement but Lord Justice Snowden dissented. The Defendant’s primary submission is that an untested meter distinction defeats the ratio of the majority. Lord Justice Lewis’s reasoning was expressly predicated on a properly certified reading from a meter that was found on testing to be registering correctly. As the Old Meter was never tested the factual premise of the majority was absent. Lord Justice Lewis at paragraph 48 referred to meters when tested shown to be within prescribed limits. Mr Marshall had examined comparable devices, unlike in Clays where the expert did not give evidence. There was the contemporaneous evidence from Khaitco and the field agent and the 5 m³ ADC “baseline” of water consumption. Reliance was placed on Lord Justice Snowden’s minority view that a certified reading and absence of testing does not exclude other evidence capable of showing the meter registered incorrectly. Finally, the comprehensive code cannot logically apply where the very mechanism the code provides for i.e. testing under Regulation 6 was not engaged. The statutory scheme presupposes that meter can be tested and it cannot operate in that way when the meter has been destroyed.

95. As to the Regulation 8(4) argument run by the Claimant that even if the meter over recorded the deemed period of malfunction should be limited to the last occasion but one reading, that could not be sustained. The Defendant submitted that Regulation 8(4) needed to be construed in light of Regulation 8(3). Where there had been no testing Regulation 8(4) was not engaged. It was also submitted that Regulation 8(4) existed to protect the consumer and the Claimant’s position was internally contradictory. If the Claimant wished to rely on the Regulation it must accept all of the Regulations, including the requirement for a test and it cannot “cherry pick”.

Decision and reasons on this issue

96. The Defendant in closing submissions did not contend that he had requested the Old Meter to be tested. That is a correct conclusion on the evidence and I find as a fact that no request for testing the meter was made by the Defendant. The Defendant criticised the certificate dated 3 June 2026 but did not develop the argument in a way to justify a finding that this was not a certificate under Regulation 8(2). Given its date, it was done for the purposes of litigation in order to engage the Regulations, but that in itself does not undermine the validity of the certificate.

97. The factual circumstances in this case are different to those in Clays, as the parties agree. The Old Meter was not tested. Lord Justice Lewis referred to the Regulation 8 as creating a comprehensive code and Lord Justice Lewis at paragraph 41, as set out above, stated:

“… If a properly certified reading is taken from a meter that is found on testing [my emphasis] to be registering correctly, the reading shows the volume of water supplied to the premises and is the basis upon which charges may be determined and recovered.”

98. I accept the Defendant’s submission that Lord Justice Lewis’s reasoning was predicated on a meter having been tested, based on the extract above. No argument appears to have been made on the basis of no testing of a meter. The decision focuses on a meter having been tested. Lord Justice Peter Jackson at paragraph 83 states the legislation has all the characteristics of a comprehensive scheme and in paragraphs 83 and 84 to the testing of the meter when discussing potential temporary faults. In considering the difficulties of calculating charges after such a fault at paragraph 85 Lord Justice Peter Jackson states:

“Parliament is most unlikely to have contemplated the existence of such a state of affairs after a meter has been tested [my emphasis] and found to be working within tolerances.”

99. As paragraph 41 and paragraph 85 show, the reasoning is based upon a certified meter reading being taken from a meter that was tested in accordance with the Regulations. The wording of Regulation 8(1) states that the readings: “shall be evidence of the volume of water supplied”, which is then followed with the phrase: “unless the meter is proved to register incorrectly.” It follows that if no test of the meter is undertaken then the consumption of water is not proved. The Regulations do not provide that the certificate under Regulation 8(2) is on its own conclusive proof of the consumption of water. The certificate under the Regulation 8(2) may be proof of the meter readings, but not the consumption of water. What the comprehensive code of Regulation 8 requires is that the meter is tested and if found to be within the prescribed limits of error then the certified readings are proved as reflecting the consumption of water.

100. I conclude that the comprehensive code of Regulation 8 for proving the consumption of water does not cover the situation where the meter has never been tested. I conclude that the certified readings of the Old Meter by the Claimant are not proof of the water consumption, as there has been no test under Regulation 6 of whether the Old Meter exceeded the prescribed limits of error.

101. It was not argued before me, but it seems Regulation 9(1)[5] envisages adjustment of charges without a meter being tested. It states this may occur where the meter “has or is deemed to have registered incorrectly”. By using the word “deemed” it must include the meaning that the meter has not been proved to be registering incorrectly under Regulation 8(3). If that was not the case the word “deemed” would be unnecessary. Lord Justice Lewis does not appear to consider the effect of Regulation 9(1) in his judgment. Lord Justice Peter Jackson at paragraph 83 states:

“…The only exception [that meters are the only way to measure water supply] is where a meter has been tested and found wanting, and in that case Reg. 9 (entitled "Adjustment of charges") applies. Here, and only because the meter cannot be relied upon, an account has to be taken, with a statutory cap on the charges that can be levied on a domestic consumer. There is no similar provision for adjustment of charges in Reg. 9 or elsewhere because of a transient, self-correcting meter. That is a far more speaking silence than the absence of a superfluous conclusive evidence clause.”

Lord Justice Peter Jackson does not refer to the mechanism in Regulation 8(4).

102. In his dissenting judgment Lord Justice Snowden refers to Regulation 9 as not being inconsistent with his interpretation of Regulation 8 and states:

“Regulation 9(1) provides for an account to be taken of the sums payable by the water undertaker or by the customer "for any period during which the meter has or is deemed to have registered incorrectly". Regulation 9(2) also provides for there to be a statutory cap on the balance payable by a domestic customer following such account where a meter is "proved to have registered less than the volume of water supplied" to the house. Whilst the wording of Regulations 9(1) and (2) would certainly apply where a meter had exceeded the prescribed limits of error on a subsequent test, they are both couched in neutral language, and could equally apply if the meter had passed a subsequent test, but had been proven by other evidence to have been "registering incorrectly" during the period in question.”

103. There is nothing in the judgment in Clays that prevents me from reaching the conclusion that my interpretation of Regulation 9 supports my interpretation of Regulation 8 in the circumstances of this case.

104. The Claimant invites me to find that the reading in September 2022 was the equivalent of a test under Regulation 6 and therefore Regulation 8(4) applies and they should be entitled to increase the charge in accordance with the mechanism in that subparagraph. I reject that argument as if there is a comprehensive code under the Regulation 8 the meter must be tested in accordance with the Regulation for the adjustment to apply. If the Claimant had wished to increase the charges under the Regulation 8 they should have tested the meter as they are entitled to under Regulation 6(1).

Clauses 13.4 and 13.5 of the Claimant’s terms and conditions

105. The Claimant argues that it is entitled to an uplift on the invoice for the periods when the Old Meter was under recording in any case under its terms and conditions and Regulation 9(1). The clauses in the terms and conditions are as follows:

“13.4 A meter reading taken by us or on our behalf is evidence of the water consumed except where the meter:

13.4.1 has stopped or slowed;

13.4.2 has been bypassed or otherwise removed by you; or

13.4.3 has been tested and found to exceed the limits of error prescribed by law;

and in these cases we will estimate the quantity of water supplied during the period when the meter had stopped, failed to register correctly, been bypassed or removed.

13.5 If you think that the meter in any Premises is not working correctly, you may ask us to arrange a test with the Wholesale Supplier. If such test shows that the meter is working incorrectly (that is operating outside the prescribed limited of error) then we will adjust your Charges in respect of any metered elements in accordance with the adjustments made by the relevant Wholesale Supplier. There will be a charge for testing a meter.”

Parties’ submissions

106. The Claimant submits that, if there was no statutory test of a meter (as I have found), charges should be adjusted under Regulation 9(1) and clause 13.4. The Defendant submits clause 13 is double-edged: clause 13.4.1 treats readings as evidence only unless the meter has “stopped or slowed”; clause 13.4.3 applies where testing shows the meter is outside limits; and clause 13.5 provides for testing and adjustment in line with the Wholesale Supplier. The Defendant submits Clause 13.4.1 is not dependent on a Regulation 6 test. Once the Old Meter failed on 13 September 2022, the reading was displaced and the Claimant had to make a reasonable estimate based on past or comparable consumption, it cannot treat the displaced reading as conclusive evidence. The proper starting point is about 5 m³/day, supported by the pre-2019 baseline and the New Meter, and by East Tower Apartments Ltd v No.1 West India Quay (Residential) Ltd [2016] UKUT 553 (LC) and Woodfall: Landlord and Tenant § 7:227 (neither of which are in the authorities bundle). Clause 13.5 also assists the Defendant. It requires adjustment in line with the wholesaler where a meter is found to be working incorrectly, but no such adjustment was made. The Claimant cannot rely on clause 13.4 and Regulation 9(1) to make an upward estimate while denying that the same contractual code permits displacement of the disputed reading without the statutory test.

Decision and reasons on this issue

107. The terms and conditions represent the bargain that the parties have struck, or perhaps more accurately the terms and conditions upon which the Claimant will supply the Defendant. The Regulations, whilst providing a comprehensive code, as discussed above, are only engaged under Regulation 8 when a certificate is produced under Regulation 8(2) and when the meter is tested under Regulation 6. This is the entry point that then engages the mechanisms to adjust bills under Regulation 8(4). It seems logical that if a meter has stopped, and is therefore not recording at all, the supplier will not issue a certificate under Regulation 8(2) as that will not be of any benefit to the supplier, as they will wish to be paid for the water that has been supplied but not recorded. In such a circumstance, the mechanism to uplift under Regulations 8(4) will not be available and therefore the supplier will rely upon Regulation 9(1) and clause 13.4.1 and estimate the amount of water supplied. Regulation 9(1) is not dependant on any testing of the meter, as discussed above it refers to the meter being deemed to have registered incorrectly. Where the supplier believes that the meter has slowed (which seems likely to be a matter of assessment) then again, the supplier may estimate the amount of water supplied. In both circumstances, if the customer disputes the stopping/slowing of the meter they can request that the meter is tested. Any errors determined will then be adjusted in accordance with Regulation 8(4).

108. The terms and conditions are consistent with the regime in the Regulations. Regulation 9(1) is engaged and I find that the Claimant is entitled to estimate any under charging for the provision of water to the Defendant on the basis of the terms and conditions. I have reached a conclusion on what the estimate should be below.

Findings of fact

The witnesses

109. Mr Beale’s evidence was somewhat limited as he had no personal involvement with this particular case. It was useful to understand how the Claimant operated its systems. I found Mr Beale to be wedded to the idea that the meter cannot have over recorded, as can be seen from his evidence above. His approach was: if the meter records it then the customer has consumed it. I found the lack of interest in understanding an eightfold increase in apparent water consumption to be surprising, as well as his evidence that the Claimant would not arrange to test a meter unless the customer asked for it. It is worth noting that the Claimant had paid the wholesaler, Thames Water, for the consumption based on the Disputed Readings. There is an incentive for the Claimant to recover from the Defendant therefore and that together with a belief that water meters do not over record may be an explanation for the Claimant’s approach.

110. The Defendant was not a wholly convincing witness in a number of respects. I have noted Mr Boumphrey’s cross examination as to credibility above. However, I bear in mind that a witness may for various reasons not tell the truth and may be reluctant to answer in some aspect of their evidence, but that does not mean that everything that has been said is untruthful or unreliable. However, I accept the copies of the entries on Velocity as the best evidence of the contemporaneous interaction with the Defendant and that they record dealings on the account.

111. I find that the entries on Velocity show that the first entry on the log for the account was 2 October 2020 at which point a moving out process was completed, presumably for the old tenant of the Premises. I do not have any information concerning the delay, but it is not relevant in any event. The Defendant I find did not contact the Claimant to tell them that he had taken responsibility for charges for water supply to the premises when he first moved in. I accept the first interaction with the Defendant was on 7 January 2021, as recorded on Velocity. In oral evidence, he was evasive when asked whether bills for water charges had been received at the premises before 2022. It is easy to consider why that might be the case, perhaps for cash flow reasons to defer any payments until the supplier chased him and not wishing to accept that he should have contacted the Claimant earlier.

112. In an entry on Velocity for 15 July 2022 a call is recorded with the Defendant, where he advised that he had not received invoices. The entry records that four invoices were “sent on call” and that the Defendant says the balance is wrong and that he will take a photograph of the Old Meter and send it to the Claimant. It seems the four invoices referred to are the entries on the statement of account (see paragraph 38 above): three for 13 June and one for 14 June 2022. However, no actual invoices for those dates were in the trial bundle and it seems therefore possible that they had not been sent out previously to the Defendant. In his evidence, the Defendant referred to invoices received during 2020. I find he is mistaken on this, he is probably confusing the four invoices that I refer to above, although there is no evidence that the Claimant sent these to the Defendant until the telephone call on 15 July 2022.

113. On 18 July 2022 Velocity records another call with the Defendant. In this call the Defendant referred to a higher bill than expected, and he must have been referring to the four invoices that were sent on the call on 15 July 2022. The Defendant is recorded as referring to a “burst pipe” in 2021 and the comment recorded is that: “[he] does not know if it was fully fixed.” Again, there is a reference to taking a picture of the current meter reading. An entry on Velocity dated 22 July confirmed that the meter reading had been supplied. The Defendant referred to a: “massive leak in Swiss Cottage” and to the flooding of the Premises. The Leak Allowance Form is provided. The notes records that the invoice dated 14 June 2022 is to be cancelled (bearing again in mind that I have not seen that invoice) and a new bill generated on the meter reading provided by the Defendant. There is a similar entry on 26 July 2022 referring to “a massive leak in the area”.

114. On the same day a further record stated that the Defendant had been emailed with the amount due and that invoices will follow. There is an invoice dated 26 July 2022 for the sum of £76,326.48 (see also paragraph 38 for the entries on the statement of account) and an apparent covering letter dated 29 July 2022 and so presumably the hard copy of the invoice was received shortly after that date.

115. On 28 July 2022 there is an entry on Velocity of a discussion with Thames Water which refers to “no work orders” for the post code. This will be a check to see if they have repaired a leak (which we now know from their email dated 20 August 2025 at paragraph 27 they had not). On the same date a further entry recorded a conversation with the Defendant. In this he refers to the date of 12 July 2021 as the flood and the Claimant’s call handler finds a report of the flood. The Defendant states he will send in the Leak Allowance Form.

116. The Leak Allowance Form is dated 27 July 2022 so must have been received on or shortly after that date. It gives the date of the leak as 12 July 2021 and that it was repaired by Thames Water. The location of the leak is described in terms of the effect of the water, rather than where the leak occurred.

117. There are entries on Velocity on 29 July 2022 stating that the Defendant had not provided any evidence to support a leak adjustment and a conclusion that it was likely to be a customer side leak. A leak allowance can be applied for but there is a comment that was unlikely to be awarded. A further amended invoice dated 29 July 2022 was generated for the sum of £83,300.50 and the covering letter is dated 31 July 2022 and so will have been received by the Defendant shortly thereafter. There is an entry dated 4 August 2022 of a discussion with the Defendant referring to his Leak Allowance Form and that what had put there “was an insurance issue”. It was recorded that the Defendant was to arrange a contractor to look for a leak.

118. On 23 August 2022 an entry records the conversation with the Defendant and that he refused access to the internal basement meter and refused all payments. There is an email dated 29 August 2022 from the Defendant to the Claimant. I do not have the chain of which this email forms a part. It states:

“I accept the charges if it does lot (sic) exceed more than the said amount. To replace or repair is not my responsibility, the meter has been damaged due due (sic) to the flood which occurred on 12th July last year, I am sure you have the full report of the said flood.”

119. On the same day an email from the Claimant to the Defendant states:

“I can confirm we can raise a request through your wholesaler to repair your meter but I must advise of potential charges… [The email goes on to detail the charge at £82.68 plus VAT and give a link to a website referring to matters that might be charged] can you confirm that you are happy to proceed? Once charges have been accepted, we can then raise a request for someone to come out and fix your meter as soon as possible.”

120. On 1 September 2022 there is a record of the Defendant providing the Khaitco report and a record of what that stated. On 13 September 2022 the field agent visits and provided the report. For the text of both reports see paragraphs 25 and 26 above.

121. The Claimant’s submissions are that it is clear from the Velocity reports that the Defendant had not asserted at any point that the Old Meter might be over recording. There is also no request by him that the meter is tested or retained for testing. My conclusions are that during July 2022, the Defendant received several large bills, the last one being for £83,300.50. It is not surprising that, as a layperson, he considered that the flood in July 2021 was a cause of this bill. Unless you had a detailed knowledge of plumbing and the placement of meters and what they do and do not record (even when they are functioning normally) it would be reasonable to consider that it was the cause of such a large bill. The Claimant’s own staff questioned this as a cause initially but then ruled this out because of their contact with Thames Water. The Leak Allowance Form was completed by the Defendant on the basis of the conversations that he had with the Claimant’s staff. It is abundantly clear that their position was that there was no leak and therefore the Old Meter must be accurate and the water had either been consumed or there was a leak on the customer side. Such a conclusion is understandable as I expect there are a number of customers who dispute bills and try to avoid paying them. Nevertheless, at no stage did the Claimant’s staff inform the Defendant that he could ask for the meter to be tested. The references in the email dated 29 August 2022 are to a “repair” of the meter. It is not surprising that the Defendant’s approach was that the responsibility for the repair of the meter or damage to the meter falls to the Claimant. He cannot be reasonably expected to know how the arrangements work between the retailer and wholesaler and that he had the option of having the meter tested. He has simply concluded, entirely reasonably in my judgement, that the meter was defective and the cause of the high readings because it was not working. He cannot be expected to know Mr Godley’s expert opinion, that the majority of meters that fail will under record. The Claimant’s criticism that neither Khaitco nor the field agent were concerned that the meter might be over recording is without merit. By the time both of those individuals came to inspect the meter it clearly stopped working properly and was not recording or was under recording. I also do not accept that the Defendant can be expected to recall the parts of the terms and conditions that set out he may have the meter tested. I completely reject these criticisms of the Defendant’s approach or his evidence on these points.

122. The fact that the Defendant maintained the flood as the cause and engaged Khaitco[6] indirectly supports what the Defendant maintained in his oral evidence that there was no visible water loss at the premises. He thought the flood was the cause of the high bill and he did not refer to any new flooding. Again, I accept the Defendant’s evidence that he did not personally see any water loss and no water loss was reported to him by the Assistant. He was also straightforward when giving his evidence that there had been no repairs at the premises that might have arrested any water loss and I accept his evidence on this point. This is supported by Mr Godley’s conclusion that the volume of water represented by the Old Meter readings “would likely have led to a visible flood of the area” (paragraph 70) and a lot of water in the basement (paragraph 71). In making this finding I bear in mind that the Defendant did not attend the Premises more that every three to four weeks. It also seems likely that as he raised the issue of the July 2021 flood that he would have raised any contemporaneous issue with flooding or visible water loss in July 2022. This especially, as I will come to, given the volume of water the meter was indicating at the time was being supplied and the length of time covered by the Disputed Readings. It is likely that the Defendant would have acted earlier and not allowed flooding to go on for over two years. There is no evidence that the Defendant knew in advance the size of the first invoice and therefore would have been trying to “cover it up”. As the Defendant said in evidence he thought it must be a mistake, again a reasonable conclusion.

123. The Defendant was also criticised for not having referred to certain matters within his witness statement, such as the systems for checking for leaks and the other details of the performance of his business that might corroborate a level of water usage. He was also criticised for not adducing evidence from the Assistant. I was invited to draw an adverse inference on the failure to adduce this evidence. The Claimant’s case is that the Old Meter was recording accurately and the burden is on the Claimant. I was not referred to any application having been made for specific disclosure of the Defendant’s documents or to obtain evidence from the Assistant. There was no specific pleading that might call for the evidence specifically and my impression was that the matters were raised for the first time in cross examination and to some extent Mr Boumphrey sought to shift the burden of proof. I am not satisfied that the Defendant might have been expected to adduce this evidence in such circumstances. The evidence might corroborate either parties’ case depending on what it revealed, but it would not be determinative on its own. In general, I do not consider these to be fair criticisms of the Defendant and whether he has provided enough evidence to support his assertion that the Old Meter was defective will be decided on the evidence that has been adduced.

124. I find as a fact that from March 2020 the premises were not operating and then operating at a reduced level until sometime in July 2021, because of Covid restrictions. The Defendant’s evidence is consistent with the well-known impact of Covid at the time. The Defendant was not cross-examined on this aspect of his evidence in any event. This also undermines the level of apparent consumption of water. However, I bear in mind that it does not exclude high consumption, but it undermines it. I also find as a fact that the water supply to the tank was switched off at the end of the working day. I find no reason not to accept that only one tank is used. These facts were not in the Defendant’s witness statement but is one of those matters that he could not reasonably have anticipated being questioned about. The way he gave evidence on these points was believable. It is entirely plausible that turning of the water supply at the end of the working day would occur. It does not in itself undermine one way or the other whether water was being lost. However, it does mean that if the Old Meter readings represent real water consumption then the flow rate would be increased (the same volume of water but in a shorter period) when the water was turned on and it would be more likely that the water would be visible with only one tank filling in a period of a working day.

125. The invoice dated 29 July 2022 covers a period of 1 December 2019 to 30 September 2022, which is a period of 34 months. That means the monthly amount is £2,450 (ignoring the pence). I accept the evidence of Mr Ahmad Nabizada that his monthly cost between January 2020 and September 2022 was £268.46. I also accept the evidence of Mr Wahidullah Nabizada that his average cost on a monthly basis between January 2020 and September 2022 was £269.70. I accept the evidence that these launderettes are broadly comparable to the Defendant’s launderette. The precise number of machines is unlikely to be material considering the significant disparity between the monthly costs, in other words if there were one or two machines more or less it is highly unlikely in my judgement that it would influence a monthly bill to make it approximately 10 times larger.

The experts

126. The Claimant says that the Defendant’s expert, Mr Marshall, is not a suitable witness. He does not have the relevant expertise, he advanced irrelevant material, he advocated for the Defendant, and he obtained evidence from the Defendant unilaterally. However, if the Court does rely on what Mr Marshall stated it should be limited to the issue defined in the directions. In any event, where there is a conflict between his evidence and Mr Godley’s evidence, then Mr Godley’s evidence should be preferred. The Defendant says that Mr Marshall has over 20 years’ experience in disputes concerning mechanical installations and that extends to mechanical counter mechanisms and the failure modes associated with such mechanisms. The central issue in the case is not how water meters are calibrated in a laboratory but whether the mechanism in the Old Meter malfunctioned. Mr Godley agreed that the operating principle of the meter register was the same as a classic odometer and these are quintessentially mechanical engineering matters. Mr Marshall was perfectly qualified to give an opinion on such a mechanism. Furthermore, the Claimant’s cross-examination did not engage with the reasoning by which Mr Marshall reached his conclusions and there was no substantive challenge to it. Any challenge goes to weight and not admissibility. The Defendant also submits that Mr Godley appeared committed to protecting the Claimant’s interest, namely that water meters of this kind were not capable of significant over recording of consumption.

127. The role of an expert is to provide the court with assistance where the court does not have the necessary expertise. That may be by way of opinion evidence and/or factual evidence. The factual evidence may be based on their knowledge and experience including the work of others. There are no special rules of admissibility of straightforward factual evidence, but there are on the other two types of evidence (paragraph 41 Kennedy). I accept, that somebody may be an expert in a particular area and be able to assist the court where the description of their expertise does not exactly fit the description of the problem being considered by the court (that might be considered a matter of substance rather than form).

128. In Kennedy (paragraph 43) the Supreme Court agreed with the judgment of King CJ in the South Australian case of R v Bonython on what was required for admissibility of opinion evidence. Two questions must be considered:

“The first is whether the subject matter of the opinion falls within the class of subjects upon which expert testimony is permissible. This first question may be divided into two parts: (a) whether the subject matter of the opinion is such that a person without instruction or experience in the area of knowledge or human experience would be able to form a sound judgment on the matter without the assistance of witnesses possessing special knowledge or experience in the area, and (b) whether the subject matter of the opinion forms part of a body of knowledge or experience which is sufficiently organized or recognized to be accepted as a reliable body of knowledge or experience, a special acquaintance with which by the witness would render his opinion of assistance to the court. The second question is whether the witness has acquired by study or experience sufficient knowledge of the subject to render his opinion of value in resolving the issues before the court.”

129. Expert factual evidence derived from a person’s skill is governed by four considerations. Paragraph 44 of Kennedy sets those out:

“(i) whether the proposed skilled evidence will assist the court in its task; (ii) whether the witness has the necessary knowledge and experience; (iii) whether the witness is impartial in his or her presentation and assessment of the evidence; and (iv) whether there is a reliable body of knowledge or experience to underpin the expert’s evidence.”

130. These features are summarised in the parties’ agreed position on expert evidence as identified above under the relevant heading.

131. The position is not as broadbrush as Mr Boumphrey or Mr Sandham have set out. It is necessary to consider the different aspects of the experts’ evidence to decide whether it is admissible, and if it is admissible what weight I am to apply to it. In addition, it is difficult to consider excluding all of Mr Marshall’s evidence when cross-examination of the witnesses was based upon in part his report (including cross-examination by Mr Boumphrey) and there has been a joint expert meeting. It will be necessary to consider how to deal with the expert evidence in light of the different aspects of their evidence.

132. Connected to these considerations is the extent to which the experts have strayed beyond the issue that I identified they should report upon. It is for the Court to control the extent of the expert evidence, but the parties in this case effectively agreed to extend the issues that the experts were to consider, not least by permitting a site visit and consideration of, amongst other matters the flow rate into the tank and the volume of the tank. I shall consider how to deal with this evidence on an issue-by-issue basis. However, fundamentally as the Claimant agreed to what took place it would not be fair to simply exclude all the evidence from the experts that strayed outside the identified issue, unless it is not admissible or does not otherwise assist me in reaching a decision.

133. My overall conclusion on Mr Godley’s evidence is that he was not at all times acting as an independent expert. As I have indicated above, I was troubled by his answer that “we” had not conceded that the meter was over recording. When asked to agree the calculation done by Mr Marshall for the time taken to fill the tanks he stated that he understood the calculation. It was straightforward mathematics from two figures and his answer was unnecessarily obtuse. I am concerned he did not want to agree it because it would not have supported the Defendant’s case. I was also concerned that he might have been retreating from what he said in the joint meeting that the Old Meter should have been retained to then say it was not a matter for him. On balance, what he was saying at its core was reasonable, but it was dealt with in such a manner that again it made me consider that he did not want to make concessions that might be unfavourable to the Claimant. Similarly, why not agree at least that the consumption at 5 m³ either side of the Disputed Readings raises the possibility that the meter was not recording properly. Mr Boumphrey focused on the reading of 15 November 2022 at 11.10 m³ and Mr Godley agreed that this was approximately twice 5 m³. However, as I have calculated if you include all the available readings on the New Meter it comes out at just under 5 m³ ADC. As an expert, where you have carried out calculations of averages why not at least think about whether that calculation ought to be done. Why exclude the first two readings on the New Meter, especially, as Mr Godley confirmed to my question, that the New Meter was of a type that would not over record when first used (in contrast, he explained, to a piston meter which may over record when first inserted). His answers to the question about the causes of over recording were limited. That may be because he has limited experience of over recording, as he acknowledged, or because he was being very careful in giving his evidence not to compromise the Claimant’s position. My conclusion overall of these matters and the entirety of Mr Godley’s evidence is that he was not being in all aspects of his evidence entirely straightforward and he was concerned about making points that were adverse to the Claimant’s case.

134. My overall conclusion on Mr Marshall’s evidence is that he did not appreciate the role of an expert, nor did he understand his obligation to the Court. For example, speaking to potential witnesses, visiting the premises and inspecting the plumbing and stating matters such as industry practice when he had no knowledge of such practices. His role is not to get the best fit of the evidence to a hypothesis as he stated. I was surprised that he was happy to state that he had acted as an expert in matters where he did not have the expertise.

135. I am satisfied that Mr Godley’s opinion concerning overall performance of water meters and the causes of failure of such meters are his expert opinion and the two questions identified in Kennedy are satisfied. Mr Marshall, on the other hand where he gives evidence on general performance does not satisfy the test. He has no experience or sufficient knowledge of the subject to render his opinion of value. The single unit of a water meter is composed of two elements, the meter register and the measurement chamber. The majority of Mr Godley’s evidence focused on failures in the measurement chamber. In relation to the meter register he stated that he had never seen a meter where rotation of a smaller digit pushed on a higher digit before it had fully rotated. He stated an examination of the arrangement of the gears, cogs and dials (wheels) would be necessary. He commented that WRc does not carry out internal examination of meters unless specifically requested. I am not satisfied that Mr Godley can be considered to be an expert in the mechanics of the meter register and its failure. He did not give any evidence about his expertise in examination of defects in the meter register personally and his comment that WRc does not carry out internal examination unless specifically requested indicates that it is not a subject of particular enquiry.

136. Mr Marshall stated that he is an expert in mechanisms, and as I have recorded above, he has dismantled two similar water meters and he has owned car odometers. However, that does not make him an expert in this area and I am not satisfied that he has acquired by study or experience sufficient knowledge of the subject to render his opinion of value to resolve the issues before the court. His proposed mechanism for failure of the water meter was validated by him by speaking to two other unidentified engineers. However, there is no evidence from those individuals, no evidence of their qualifications and no detail upon which it can safely be said that there is any expert basis for the conclusions. It is a possible mechanism, as Mr Godley has also considered it and it seems as a matter of common sense it is possible for either the meter register to fail or the measurement chamber to fail. However, the mechanism proposed by Mr Marshall is no more than a theory and his enquiries of two other people does not render his opinion admissible on this point.

137. The calculation of averages, the calculation of the flow rate into the tank and the volume of water capable of being held in the tank are matters of fact. They are also matters that do not require an expert opinion. Both the experts have gone beyond the identified issue, but nevertheless the information is relevant and admissible. An opinion on what the calculated averages mean in the context of a water meter is an expert opinion and for the same reasons as given above admissible from Mr Godley but not admissible from Mr Marshall. Mr Marshall’s and Mr Godley’s opinions on how much water a launderette would use were not based upon any evidence or expert opinion and not admissible. Similarly, Mr Marshall’s opinion on the nature of the soil around the premises and whether a volume of water could have been absorbed by it is not admissible. Mr Marshall has no expertise in this area.

Are the meter readings accurate?

138. The Claimant’s pleaded case is that the meter readings are accurate and the Defendant’s case is that the meter was faulty. I do not consider it necessary in order to answer the question as to whether the meter readings were accurate to understand or identify the precise mechanism by which the meter might have been caused to malfunction. I have stated the limitations of the experts’ evidence on the mechanism of failure above. Nevertheless, Mr Godley accepted that over recording was possible, that the meter register could fail (his reference to damage by vibration) and the measurement chamber could also fail. I note that in Clays the extract from the expert’s report included that the testing of the meters in that case had been done at WRc and that the expert had observed two digits of a meter roll over at the same time. It may have been a different type of meter. I was not taken to this by either party but it does raise in my mind Mr Godley’s answers to questions about observations of over recording and his impartiality. It was not put to him and I make no findings about it and it is not relevant as I can reach a conclusion without making any findings on the mechanics of any problem with the Old Meter.

139. There are a number of features that are in favour of the meter readings being accurate. The reports from Khaitco and the field agent are that the Old Meter was not recording and the two readings of 13 September and 7 October 2022 give a low (i.e. below 5m3) ADC. I accept Mr Godley’s opinion that the majority of water meter failures result in the under recording of water consumption. Therefore, it follows that it will be unusual for a meter to over record. Mr Godley’s evidence was that in the data available to him any over recording was 6% at most, and that is significantly less than observed in this case. The evidence from the WRc database is that there is no record from the entire dataset of a meter over according to the extent that this meter has been said to over record. Mr Godley stated that none of his colleagues had reported to him over according to the extent that this meter has been said to over record. The field agent observed the wheels of the Old Meter clicking and rocking. I find it is likely that there was water passing through the meter (as is possible as the piston has holes in it to allow this to occur) as Mr Godley stated. However, his opinion was also that the volume of the water in such a circumstance would be small. Mr Godley’s opinion that a possible explanation for the whole sequence of events is a large flow of water that then results in meter failure seems logical, but it is not the only explanation.

140. There are a number of features that support the Defendant’s case that the Old Meter was faulty and over recording. It is accepted by the Claimant that on or around the 13 September 2022 the Old Meter failed completely. The average consumption of water before the reading on 17 May 2021, even including the ADC from November 2019 is around 5 m³. The average consumption of water, once the New Meter was in place even including the reading of 11.10 m³ is slightly under 5 m³. This carries an implication that something happened in that intervening period and that the usual consumption of water gives an ADC of 5m3.

141. There are significant gaps between the readings of the Old Meter. In particular 548 days between 16 November 2019 and 17 May 2021, 203 days to the next reading of 6 December 2021 and 228 days up to the reading on the 22 July 2022. As can be seen from the readings when the New Meter was installed there is some month-to-month variability (the readings being approximately monthly). It is inherently unlikely that the readings on each day would be exactly the same as the ADCs calculated over such periods of time. In calculating an average there will be some readings that are higher than the average and some readings that are lower. As Mr Godley identified in his evidence the Disputed Readings would represent a large volume of water. Mr Beale accepted the readings represented “extremely high” water consumption. That it is not a matter of expert evidence but a matter of considering that something in the region of 40 m³ of water represents a volume that would fill a 5 m x 4 m x 2 m cuboid. I accept the agreed evidence of the flow rate into the tank and the volume of the tank. I accept Mr Marshall’s calculation, which was tacitly agreed by Mr Godley (and again this is not expert evidence it is a matter of calculation) that such volumes of water would take 9 ½ hours each day to fill the tanks based upon 44 m³ per day ADC. Volumes around this figure would have had to have been consumed daily for approximately two years from 16 November 2019 to 6 December 2021.

142. The question therefore arises: if the Old Meter readings truly reflect the water passing through the Old Meter where did this large volume of water go? There are only three ways that the meter readings, if genuine, could have increased. First, by consumption of the water in the washing machines or other uses within the launderette. Secondly, by leakage from the plumbing system by which I mean the water escapes through a defect in that system or thirdly, by wastage, by which I mean the water runs through the plumbing system and into the sewer.

143. Consumption of the water by ordinary usage is unlikely. At its peak the ADC was eight times the ADC before November 2019 and after the installation of the New Meter. This would represent a significant amount of increased business, in particular in including considering the impact of Covid on businesses. Mr Beale referred to this as “extremely high” water consumption. The Defendant’s evidence was against such an increase in business and it seems unlikely that such a significant increase in the volume of business would have occurred. The ADC of 11.10 m³ probably represents an increase in business and is reflective of variation in business volume, but that remains significantly less than the peak of around 40 m³. The ADC before the meter reading of 16 November 2019 was 5 m³ approximately. The average after installation of the New Meter is just under 5 m³ (including the reading of 11.10 on 15 November 2022). This implies that the ADC for this business is in the region of 5 m³, although there will be some days when consumption is greater than that and some days when consumption is lower (as by definition it is an average). I have accepted the evidence of Mr Wahidullah Nabizada and Mr Ahmad Nabizada that their monthly bills are in the region of £270 for their launderettes. This is approximately nine times less than the average monthly bill based on the readings from the Old Meter. Their monthly bills represent a volume of water consumption by equivalent launderettes and imply that the monthly bills derived from the readings of the Old Meter are nine times what one would expect (reflecting apparent consumption of water). These aspects of the evidence are against an increase in ordinary usage of the water and I find it is likely that there was no increase in such usage of the water.

144. Whilst I have broken down the other two methods by which the Old Meter readings may represent consumption of water into leakage and wastage, considering the evidence, it is my view that the word “leakage” is used generally and that in particular Khaitco, the field agent and Thames Water when referring to “no continuous flow” and no evidence of a leak were referring to both leakage and wastage. This is because if there was continuous flow through a meter it could be caused either by leakage or wastage the only way of distinguishing between the two is by investigating the source of the leak or where the water is flowing into the sewer in an uncontrolled manner. It is clear that there is no evidence of a leak in this case, in other words water escaping from the normal confines of the plumbing. There is objective evidence from Thames Water that there have been no repairs of leaks and nothing had been notified to them. Mr Godley doubted that Thames Water could conclude that there was no continuous flow, but that is a conclusion that they reached. I was not satisfied that I should reject that evidence. Mr Godley stated that the Old Meter was rocking and ticking and this meant that water was flowing through the meter. However, he was also of the opinion that it could not have been a significant volume of water. If it had been a significant volume of water then he said that any jamming of the piston would have been overcome. I consider that there must have been some flow through the meter when it was inspected on both occasions, but it was not enough flow to support the increased consumption apparently previously recorded. It was not enough for Thames Water to conclude that there was continuous flow of a sufficient degree to indicate a leak/wastage. Otherwise, they would have said so, they have no reason not to be honest in their answer.

145. I have accepted the Defendant’s evidence that there was no water apparent to him (apart from the flood in July 2021). Mr Godley’s evidence was that with an ADC of 40 m³ and the size of the tanks water would have been visible. There is no evidence available to me to support a conclusion that an outflow pipe would have been sufficient capacity to allow water to go into the sewer without it overflowing the tank. However, it seems inherently unlikely. According to Mr Godley’s evidence about the ballcock mechanism breaking because of the volume of water, it could only have done that if the outflow pipe was not of sufficient calibre to extract the water to prevent that from happening. It seems unlikely that water would not have been visible if it was flowing in at the rate necessary to result in the ADC for May and December 2021, especially when the water supply was turned off at the end of the working day bearing in mind that this would have increased the flow rate. These conclusions support my conclusion to accept the Defendant’s evidence that there was no evidence of a leak i.e. water in the premises where it should not be, either as a result of a breach in the plumbing system or water overflowing from the tank. I have already accepted the evidence that no repair was carried out by the Defendant or on the Defendant’s behalf and this conclusion is consistent with my analysis of water leak/wastage.

146. Other evidence that indicates the Old Meter was over recording is the level of the ADC itself. Mr Godley stated that it was higher than any ADC of comparable meters by approximately 8 m³. He also stated that the level of the ADCs after 16 November 2019 were higher than he would expect for the type of meter. He would have been interested to investigate the Old Meter if it had been available. This would be consistent with an error of the Old Meter, especially considering the length of time over which the readings were high. Mr Boumphrey made a great deal of the reading on 15 November 2022 at 11.10 m³. He referred to the Chart and stated that if you drew a line backwards from that reading it looked as if it would extrapolate to the reading of 22 July 2022. This, he submitted implied a reduction from a peak usage reflected in those readings. However, in my view it is not demonstrative of what Mr Boumphrey was seeking to establish. It is clear that by 13 September 2022 the meter was significantly under recording. What the reading of 22 July 2022 demonstrates is that at that point the ADC was 20.11 m³. Based on the maths, it is possible that the meter was already under recording to the same extent as on 13 September 2022, but sometime prior to 22 July 2022 it had been recording at the same level as on 6 December 2021. The ADC fell because the level of under recording reduced the average of the earlier over recording. The readings taken do not indicate when precisely the high recording started or reduced. They just allow a calculation of what the average was over the relevant period of time. As Mr Godley said in evidence a water meter may fail gradually, abruptly or in phases. It could have been a “cliff edge” drop but it is not possible to conclude whether the onset or the end of the high meter readings was gradual, sudden or in phases from the ADCs.

147. Looking at all of this evidence together leads to the conclusion that the Old Meter was not recording accurately and the Disputed Readings represent a period where the Old Meter was over recording the consumption of water. Ultimately around the 13 September 2022 the Old Meter fails and under records. Just because the majority of water meters fail with under recording does not mean it is likely that the Old Meter was working properly prior to 13 September 2022. The very high ADC, the consequent flow rate over a prolonged period of time that would have occurred in the absence evidence of increased usage and no leakage/wastage supports the conclusion that it is likely the Old Meter was over recording. Mr Godley’s evidence about never having seen a meter of this type with ADCs of this level also supports this conclusion and he accepted meters can over record, it is not impossible. The ADC before the Disputed Readings and the ADC after replacement of the Old Meter also support the conclusion that the Disputed Readings do not reflect actual consumption. The consumption of water throughout the period was probably an ADC of 5 m³. This is a level consistent with before and after the Disputed Readings and the level of consumption would probably have continued at that level if the Old Meter had been working properly.

148. If the Claimant’s interpretation of the Regulations was correct, any consumer who wished to challenge a meter reading would have to have the meter tested. If they did not have it tested then any certificate produced by the supplier would be conclusive evidence of consumption. That would mean there was no incentive on a supplier to ever test a meter where there was a possibility of over recording. That is consistent with the approach of the Claimant in this case and with Mr Beale’s evidence. It does not reflect well on the Claimant that in this case they did not even indicate to the Defendant that he might request to have the Old Meter tested. On the face of it, it is not in the supplier’s interest to inform the customer of their right to have the meter tested, especially where the supplier has paid the wholesaler. The fact that most faulty meters under record is not a reason to fail to test a meter where there is uncertainty over its function and a bill is disputed on the basis of the readings.

149. Strictly, I do not need to consider the four principles from Wisniewski and the exercise of a discretion to draw an adverse inference on the absence of the Old Meter. However, the evidence from the Old Meter was material evidence. As Mr Godley stated in evidence, there would have been no need for the trial if it had been available. In contrast to the criticisms of the Defendant’s failure to adduce certain evidence (see above), the Old Meter and the testing of it would have been highly material. I would have expected the Claimant to adduce it. There is plenty of evidence that there is a case to answer and there is no satisfactory answer for not having had the Old Meter tested. It is not an answer to claim the Old Meter was the property of Thames Water. The Claimant has the specialist knowledge and is aware of the business relationship with the wholesaler. The Claimant has to prove the consumption of water when the meter has not been tested and I would have expected them to have requested the test, particularly in this case where the apparent consumption is so high. In the circumstances that I have outlined in this paragraph and in the paragraph above I draw an adverse inference that supports the conclusion that I have already reached in any event, namely that the Old Meter was faulty and over recording.

Conclusion on liability

150. As Regulation 8 as interpreted in Clays does not apply, I find the evidence makes it likely that the meter was faulty and over recording the Disputed Readings. The Defendant is the successful party and the Disputed Readings in the circumstances probably do not represent the consumption of water. The Claimant is entitled to claim from the Defendant any under consumption of water represented by the ADC from 13 September 2022 and 7 October 2022. As such I conclude that the appropriate and likely ADC throughout the period in question (i.e. from 16 November 2019 to 7 October 2022) was 5 m³.

Quantum

151. The Defendant has paid the Claimant £8,750 and this must be credited against any sums owed to the Claimant by the Defendant based on a consumption of 5 m3 per day over the period from 16 November 2019 to 7 October 2022. I direct that the parties agree a consequential schedule applying the appropriate tariffs on the basis of the findings I have made in this Judgment.

Conclusion

152. The Claimant has failed to prove that the Disputed Readings of the Old Meter reflect the actual consumption of water at the Premises. I find it likely that the Old Meter was defective and over recording the actual consumption. That actual consumption during the relevant period would have been 5 m³ per day. The Defendant must pay the Claimant the relevant sum based on that likely level of consumption, but credit must be given for the payments that he has already made.

Summary

153. The Claimant is the retail supplier of water to the Defendant’s launderette business. The Claimant charged the Defendant on the basis of meter readings in the sum of £131,492.16 covering the period between 16 November 2019 and 7 October 2022. There were four meter readings during that period and the Defendant’s case was that the meter was defective and over recording before it finally became apparent it was not working and under recording on or around 13 September 2022. The relevant meter was not available for inspection and was not tested. I have concluded that Regulation 8 of the Water (Meters) Regulations 1988 is not applicable to the circumstances. I have concluded that the evidence makes it likely that the meter was over recording and accordingly dismissed the claim. However, the Defendant remains liable to the Claimant for the likely consumption of water during the relevant period at an average daily amount of 5 m³.

Notes

[2] This is my note of his evidence, but I take him to mean “on or before” the New Meter was installed i.e. had a repair been undertaken to correct a leak/wastage of water before Thames Water’s comment.

[3] This person’s name was mentioned in the course of the evidence, but his name was not clarified.

[4] This is the first reading from the New Meter.

[5] Regulation 9(2) is not relevant as it applies to a “house” and these are commercial premises.

[6] The Defendant’s evidence was that they were engaged by the Claimant. However, this was not pursed in closing and in any event I find that the Defendant engaged them. I accept what Mr Beale said on this and the invoice is addressed to one of the Defendant’s businesses.

At Kohen Avocats, our business lawyer in Paris can review your situation.


Open Justice Licence (The National Archives).

Neighbouring decisions

Preliminary case review

Send your documents. Receive an analysis.

Send us the documents in your case. Hassan KOHEN reviews them personally and sends you a first written analysis of your situation within 24 working hours.

  • Written analysis by the lawyer, €80 incl. VAT
  • Personal reply within 24 working hours
  • 100% confidential, legal professional privilege guaranteed
  • Up to 1 GB of documents in total, folders and sub-folders accepted
80 €incl. VAT

Preliminary review of your case. Review of your documents and a first written analysis by Hassan KOHEN within 24 working hours. Payment is made online after this form is submitted.

  • Up to 1 GB of documents in total, folders and sub-folders accepted
  • Secure payment, no card details stored
  • Terms and fee agreement

Click or drag your files here
All formats accepted (PDF, Word, images, etc.)

Sending...

Payment constitutes a request for immediate performance of your analysis. Your data is used solely to process your request.
Terms · Privacy policy.

IA juridique gratuite

Une question de droit ? Demandez à Judith.

Judith cherche dans les codes, la Constitution, la Convention européenne des droits de l’homme et les décisions des juges, puis vous montre les textes et les passages d’arrêts qui pourraient répondre à votre question, avec leur source officielle. Gratuite, sans compte, elle ne rédige rien à votre place. Découvrir Judith, l’IA juridique gratuite du cabinet.

Trois recherches par jour, sans compte. Votre question est enregistrée et relue par le cabinet pour améliorer l’outil : n’y mettez ni nom ni information sensible.