Commercial United Kingdom

Compagnia Italiana di Navigazione SpA v Grimaldi Euromed SpA

Official source

Neutral Citation Number: [2026] EWHC 2737 (Comm)

Case No: CL-2025-000292, CL-2025-000293

IN THE HIGH COURT OF JUSTICE

BUSINESS AND PROPERTY DIVISION

COMMERCIAL COURT

Royal Courts of Justice, Rolls Building

Fetter Lane, London, EC4A 1NL

Date: 23rd October 2026

Before :

THE HONOURABLE MR JUSTICE SAINI

– – – – – – – – – – – – – – – – – – – – –

Between :

COMPAGNIA ITALIANA DI NAVIGAZIONE S.P.A. Claimant
– and –
GRIMALDI EUROMED S.P.A.
(formerly ATLANTICA DI NAVIGAZIONE S.P.A.)
Defendant

– – – – – – – – – – – – – – – – – – – – –

– – – – – – – – – – – – – – – – – – – – –

Steven Berry KC and Thomas Steward (instructed by HFW) for the Claimant

Christopher Smith KC (instructed by Keystone Law) for the Defendant

Hearing dates: 13th and 14th October 2026

– – – – – – – – – – – – – – – – – – – – –

Approved Judgment

This judgment was handed down remotely at 4pm on 23rd October, 2026 by circulation to the parties or their representatives by e-mail and by release to the National Archives.

………………………..

MR JUSTICE SAINI

Mr Justice Saini:

This judgment is in 9 main parts with an annexe as follows:

I. Overview: paras.[1]-[6].

II. An outline of the arguments: paras.[7]-[14].

III. Legal Framework: paras.[15]-[22].

IV. The Facts: paras.[23]-[47].

V. Irregularity 1: paras.[48]-[55].

VI. Irregularity 2: paras.[56]-[59].

VII. Irregularity 3: paras.[60]-[73].

VIII. Substantial injustice: paras.[74]-[79].

IX. Conclusion: paras.[80]-[82].

ANNEXE: reasoning of the Tribunal on the cylinder heads issue

I. Overview

1. The two applications before me are about alleged serious procedural irregularity in relation to pleadings in two related arbitrations. By Claim Forms dated 5 June 2025, the Claimants (“Charterers”, or “CIN”), challenge two awards (“the Awards”) made in favour of the Defendants (“Owners”, or "Grimaldi"). The challenge is made under section 68(2)(a) of the Arbitration Act 1996 (“the 1996 Act”) and I will refer to that subsection using the shorthand “section 68”, below. The Awards were made in two LMAA arbitrations (“the Arbitrations”), and the same tribunal (Simon Gault, Ben Goss and Clive Aston) was appointed in each (the “Tribunal”). The Arbitrations were dealt with concurrently, with the trials held between 10-21 June 2024, and 9-11 October 2024.

2. The Arbitrations concerned disputes arising out of two bareboat charterparties dated 15 September 2014, and on materially identical terms (amended BARECON 2001 form) (“the Charterparties”). The Charterparties were for the hire of two sister ro-ro cargo ships, the “EUROCARGO CATANIA” (“the Catania”), and “EUROCARGO SICILIA” (“the Sicilia”) (together, the “Vessels”). The Awards under challenge are the Third Award made in each reference, and I will refer to them as the “Sicilia Award” and the “Catania Award", respectively.

3. The Arbitrations concerned alleged failures by Charterers to maintain the Vessels in good repair, in an efficient working condition, in accordance with good commercial management practice, and/or to redeliver them in the same or as good structure, state and condition and class as at delivery. In each Arbitration, Owners advanced a number of individually numbered claims concerning the alleged deficient condition of the Vessels on redelivery by Charterers. Most of the claims were compromised by agreement, and the Awards dealt with a total of 29 claims in dispute. The two challenges before me concern one individual claim per Vessel: in relation to the Catania this was claim EC10, and in relation to the Sicilia it was claim ES157. These claims each concerned the main engines of the Vessels, and they both raised the same issues. For convenience I will refer below to the Award and documents in the Catania case, save where indicated otherwise.

4. In short, in respect of these claims, the Tribunal found against Charterers on grounds of defects of cavitation erosion pitting in the cylinder heads caused by failure to maintain and repair. The Tribunal awarded the Owners €279,170.00 in respect of EC 10, and €506,945.74 in respect of ES157.

5. I pause at this stage to set out a description of cylinder heads and cavitation pitting/erosion in the terms helpfully agreed in by the parties following the hearing:

“Each of the nine cylinders per engine has a cast iron cylinder head bolted to the top of the cylinder liner. The principal components of each cylinder head are a fuel valve (injector), two exhaust valves and two air inlet valves. The exhaust valve seats are water cooled (because of the high exhaust gas temperatures). Fresh cooling water is circulated in cooling water passages behind the exhaust valve seats. The cooling water passages are bounded by and in contact with, on the one side, the exhaust valve seats themselves and, on the other, the frame of the cylinder head. The interface between the metal of the seats and the cylinder head frame is designed to be watertight. Cavitation erosion is the mechanical degradation of materials caused by cavitation (i.e.. creation of bubbles) in liquids. The mechanical loading of a solid surface due to a cavitating liquid is caused by the asymmetrical collapse of cavities (i.e.. saturated vapour bubbles) either at or near the material surface. These asymmetrical collapses result in liquid microjets directed towards the solid surface. The mechanical loads are very localised and, in case of the concerted collapse of cavity clusters, can be extremely severe, resulting in deformation of the material surface. The repeated loading eventually leads to removal of material from the surface, that is, erosion, and eventually pitting. This erosion can cause chemical corrosion. On these vessels cavitation occurred. Cavitation can cause and caused erosion and pitting of the metal surfaces of cooling water passages, namely the valve seats, the frame of the cylinder head, and in the watertight interface between the two. This developed and allowed leakage of cooling water from the passages into the combustion spaces above the piston by two possible routes. First, via failure of and through the metal of the seats themselves and, when the exhaust valve opens, into the combustion space. Second, via the compromised and no longer watertight interface in the cooling water passage between the exhaust valve seats and the cylinder head frame”.

6. Steven Berry KC and Thomas Steward appeared for Charterers and Christopher Smith KC appeared for Owners. Counsel each also appeared before the Tribunal. In terms of evidence, Charterers rely on the witness statements of Richard Mabane and Brian Webb (both from Charterers’ Solicitors, HFW). Owners relied on two witness statements from Francesco Lauro of Studio Legale Lauro, their legal representatives in the Arbitrations. There did not appear to be any disputes of fact and the procedural history can be identified from the contemporaneous documents.

II. An outline of the arguments

7. The core argument of Mr Berry KC was what he described as a “pleading point” in an “admirable” rather than a “pejorative” sense. So, a point of substance and not mere technicality. He argued that the Owners’ pleaded claims did not include, or give any, or fair notice of, a case of defective cylinder heads. Although the cost of replacing cylinder heads had been included among the invoices attached to claims EC10 and ES157, Mr Berry KC submitted that EC10 and ES157, as pleaded, were for very different defects: so, EC10 was confined to oil leaks from the crankshaft seals (and possibly crankcase pressure), and ES157 was confined to exhaust gas temperatures approaching 400 degrees at 0 pitch during shifting at berth. Mr Berry KC said that those pleaded defects were dropped, and they had nothing to do with the cylinder heads, the invoices for which had been irrelevantly and inappropriately “lumped in” with an unrelated defect.

8. Mr Berry KC argued that, over Charterers’ objections, at trial the Tribunal wrongly permitted Owners to adduce expert evidence and to run a case of cylinder head defects, and of an unparticularised failure to maintain the cylinder heads using what came to be called a “workaround”. He also submitted that Owners did not allege “negligence” (or lack of “due care and attention”) at the 30,000-hour overhauls (or at all). But, the Tribunal fell into error in making the critical findings of fact of a lack of due care and attention at those overhauls. He said that these findings are “impossible and incoherent” because, as the Tribunal found elsewhere in the Awards as primary fact, the leaks and replacements and thus “the issue” only started after completion of the 30,000-hour overhauls. This injustice, argued Mr Berry KC, is the natural result of deciding a case on grounds not argued (which takes one back to his main pleading point).

9. As helpfully refined during his oral submissions, the essential case advanced by Mr Berry KC was that in these circumstances, the Tribunal committed what he termed “three cumulative and ascendingly serious irregularities”, each of which caused substantial injustice in causing the Charterers wrongly to lose claims EC10 and ES157 (which were the most substantial financial claims in the Arbitrations).

10. Taking these points, as helpfully refined in Mr Berry KC’s oral submissions (and providing my own shorthand numbering of them) they are as follows:

(1) First, by permitting evidence and argument at all of unpleaded defects (or a new “cause of action” as he described it) in relation to cylinder heads on Day 3 of the final evidential hearing. No case of defects in the cylinder heads should ever have been allowed (“Irregularity 1”).

(2) Secondly, and closely related to Irregularity 1, by permitting the Owners to introduce during the evidence the “workaround” as a “fix” and a theory that the Charterers could and should have identified the defects at the 30,000-hour overhauls. (“Irregularity 2”).

(3) Thirdly, by deciding the case on an unpleaded and unargued negligence case of a “lack of due care and attention” by the Charterers at the 30,000-hour overhauls under the fundamental factual misconception that, by the time of the overhauls, the Charterers had had to replace leaking cylinder heads. (“Irregularity 3”).

11. Mr Berry KC said that the first two complaints were related and go together, but underlined that Irregularity 3 was a “standalone” point. Mr Berry KC submitted that Charterers have suffered substantial injustice as a result of these three serious irregularities: they were not given a fair opportunity to deal with any new case, let alone the case which succeeded in the Awards. He argued that if the new cases had not been permitted EC10 and ES157 would have been unviable and failed, because the pleaded defects were abandoned and in any event had nothing to do with the cylinder heads; and if Charterers had been warned of the basis on which they would be found negligent they could have easily refuted it and thus defeated the claims. Alternatively, if, which he disputed, the issue of serious prejudice calls for inquiry of what Charterers could have done if the ultimate case had been pleaded at the time of the Claim Submissions 3 years earlier, he relied on the evidence of Mr Mabane as to the ways in which Charterers were seriously prejudiced by the lateness. This, he argued, included depriving Charterers of the opportunity to investigate relevant factual evidence of the actual overhauls, marshal the documents, adduce expert evidence on what could or should have been investigated and done at the 30,000-hour overhauls. Mr Berry KC said that the result might well have been different if Charterers had had a proper opportunity to consider the case.

12. In response, Christopher Smith KC, for Owners, argued that the challenges are a transparent attempt to “relitigate” EC10 and ES157, to seek to persuade the Court that the Awards on these claims were wrong, and to invite the Court to substitute its judgment for that of the Tribunal. He underlined that it is not the function of section 68 of the 1996 Act to permit a losing party to have a second opportunity to argue its case; and that this is not one of those extreme cases in which it would be appropriate for the Court to interfere in the arbitral process.

13. In relation to the three specific procedural complaints, Mr Smith KC submitted in summary as follows. As to Irregularity 1, he said that the claim as originally put (as a decision to allow Owners to amend) is not correct as a matter of fact: what the Tribunal in fact did was to reject an application by Charterers to declare that certain points had not been sufficiently pleaded so as to give fair warning of the Owners’ case, to prohibit the Owners from advancing those points, and to exclude large parts of the Owners’ expert evidence. He said that the Tribunal applied the correct test in dealing with this application and was entitled to come to this decision as a matter of case management discretion. As to Irregularity 2, Mr Smith KC accepted that the “workaround” was first raised during the trial, but underlined that it was raised in a particular context where there was no unfairness. Mr. Luukas, Charterers’ expert, said that the leaks (which both experts agreed were caused by cavitation pitting) were a consequence of a design issue, so a latent defect. Mr. Rawlings, the Owners’ expert, referred to the “workaround” in response, pointing out that (even if there was a design issue) that did not justify the cylinder heads being left in a defective condition. There was no unfairness in the Tribunal allowing in evidence of the “workaround” and basing its award on it. As to Irregularity 3 (the claim that the Tribunal based its Awards on a finding of negligence), Mr Smith KC said that reading the Awards in reasonable and commercial way, and without “nit picking”, that claim is incorrect. He argued that when the relevant part of the Awards is read as a whole, it is clear that this highly experienced Tribunal’s conclusion was that there had been a failure to repair and maintain in accordance with good commercial management practice, which is how the claim had been pleaded by Owners from the outset.

14. Further, Mr Smith KC underlined that the parts of the Awards to which Charterers object are those where the Tribunal allowed the cost of replacing cylinder heads that were either actually leaking at the time of redelivery or so defective that they were condemned by class and had to be scrapped and replaced within a few months. He relied strongly on the point that Mr. Luukas had himself allowed the cost of two such cylinder heads in relation to EC10. He said that the Tribunal concluded that he was right to do so, and that on the evidence the other heads allowed by Mr. Rawlings would have been in materially the same condition on redelivery (and for the same reason – that is, cavitation pitting). He said that this was an evidential finding which the Court cannot unpick or investigate on a section 68 application.

III. Legal Framework

15. Insofar as material to this application, section 68 provides:

"68 Challenging the award: serious irregularity.

(1) A party to arbitral proceedings may (upon notice to the other parties and to the tribunal) apply to the court challenging an award in the proceedings on the ground of serious irregularity affecting the tribunal, the proceedings or the award

…

(2) Serious irregularity means an irregularity of one or more of the following kinds which the court considers has caused or will cause substantial injustice to the applicant-

(a) failure by the tribunal to comply with section 33 (general duty of the tribunal);

…"

16. Section 33 provides:

"33. General duty of the tribunal.

(1) The tribunal shall—

(a) act fairly and impartially as between the parties, giving each party a reasonable opportunity of putting his case and dealing with that of his opponent, and

(b) adopt procedures suitable to the circumstances of the particular case, avoiding unnecessary delay or expense, so as to provide a fair means for the resolution of the matters falling to be determined.

(2) The tribunal shall comply with that general duty in conducting the arbitral proceedings, in its decisions on matters of procedure and evidence and in the exercise of all other powers conferred on it."

17. Charterers' challenge is based on the duty of the Tribunal under section 33(1) to give "…each party a reasonable opportunity of putting his case and dealing with that of his opponent".

18. Save as regards the Court's approach to challenges of what might be called "case management" decisions by an arbitrator (see [51] below), it did not seem to me that there was any real dispute as to the legal principles. Section 68 imposes a deliberately high threshold and although Counsel referred in written submissions to a large number of cases, one does not really need to go beyond the comprehensive discussion in Mustill & Boyd: Commercial and Investor State Arbitration (3rd Edition) ("Mustill & Boyd") at [14.35]-[14.39]. Section 68 is concerned with due process and not the correctness of the decision.

19. I did not it find helpful to be referred to cases where a section 68 challenge has, or has not, been made out. Each case is different and I have to focus on the facts before me and apply what is a straightforward and deliberately exacting statutory test. I approach the applications on the basis that Charterers need to demonstrate that something so procedurally unfair (meaning so far removed from accepted common law due process standards) has occurred in relation to the cylinder heads issue that justice calls out for it to be corrected by the Court. Section 68 is a “long-stop” for “extreme cases”: Lesotho Highlands Development Authority v Impregilo SpA [2006] 1 AC 221, per Lord Steyn at [27]. See also, The Czech Republic v Diag Human SE and another [2024] EWHC 503 (Comm), per Foxton J at [160].

20. The Court must read the Awards in a reasonable and commercial manner, without nit picking and looking for inconsistencies and faults: Mustill & Boyd [14.39]. In practical terms this means reading the Awards “as a whole in a fair and reasonable way [and the Court] should not engage in minute textual analysis” or “endeavouring to pick holes, inconsistencies and faults”: The “Pace”[2010] 1 Lloyd’s Rep.183 at [16].

21. The purpose of statements of case or pleadings in litigation of all forms is to identify the issues so that opposing parties can know the essentials of their opponent’s case, and have fair warning of issues and arguments so as to be able to prepare and respond. Being able to prepare and respond is the key and courts and tribunals often have to make an assessment as to whether a party can as a matter of fairness be permitted to pursue a point even though not clearly pleaded. Arbitrators, like Courts, prefer not to shut out genuine issues if they can avoid doing so fairly and without prejudice. Section 33 requires the Tribunal to give parties a “reasonable opportunity” of meeting the opponent’s case, consciously not a “full” opportunity: Mustill & Boyd at [14.43].

22. Finally, the requirement for Charterers to establish substantial injustice is additional to the requirement to establish serious irregularity. Charterers must do both: Reliance Industries Ltd. -v- The Union of India[2018] 1 Lloyd’s Rep. 562 at [14].

IV. The Facts

23. I base my summary in this section principally on the contemporaneous documents exhibited to the witness statements, and also on the uncontroversial parts of the Awards. The Vessels were delivered into Charterers’ service on 7 and 9October 2014. Between February and March 2016, Charterers carried out the 30,000 hour overhaul of both main engines of the Sicilia; and between January and August 2018, the Charterers carried out the 30,000 hour overhaul of both main engines of the Catania.

24. On 16 July 2020, both Vessels were redelivered after joint off hire inspections between 9-11 July 2020.

25. Between 16-17 July 2020, MAK (the manufacturer of the engines) inspected the main engines of the Vessels. In relation to the Catania, they advised that a “total overhaul” of the main engines “must be organized as soon as possible” to resolve various problems “which are due to a previous lack of care and maintenance”. Those problems included cooling water leaks inside the main engine “such that a complete overhaul of cylinder heads and liners was recommended”. In October and November 2020, the Vessels entered dry dock at Besiktas in Turkey, and the main engines of both Vessels were overhauled. 7 out of 18 cylinder heads on board the Catania were condemned by class and scrapped (and 11 refurbished). 8 cylinder heads on the Sicilia were scrapped.

26. On 23 April 2021, Owners served Claim Submissions claiming damages for breach of clauses 10 and 15 of the Charterparty. Owners’ claims were pleaded in rather bare terms. At paragraph 9 of each of the Claim Submissions, Owners asserted breaches of: (i) clause 10(a)(i) (failure to maintain); (ii) clause 10(b) (failure to repair); (iii) clause 10(f) (failure to return the equipment in the same good order and condition as when received); (iv) clause 10(f) (failure to replace items which had become so damaged or worn as to be unfit for use); and (v) clause 15 (failure to redeliver the Vessels in same or as good structure, state, condition and class as on delivery).

27. The Claim Submissions continued at paragraph 10 that “Full particulars of the deficiencies and wants of repair and maintenance present at the time of the redelivery … are set out in the schedule to these Submissions”. The amount claimed and the invoices claimed against each individual claim were set out in what was called “Schedule A” to the Claim Submissions, to which I was taken by Counsel. There is such a Schedule A in respect of each Vessel.

28. In paragraph 10 of the Claim Submissions, Owners also relied on two “Off-Hire Reports” which recorded the findings of the inspections attended by independent surveyors appointed by Owners and Charterers and their respective representatives. The Tribunal noted at [119] that no mention was made in these reports of cylinder head leakages.

29. In Schedule A to the Claim Submission, the EC10 defect was pleaded as follows:

“Lub-oil heavy splashing from the crankshaft seals at the flywheel side Port and Stbd. A plastic screen panel has been fitted in order to prevent the oil from coming in contact with the engine room walls and equipment. Crankcase pressure to be verified.”

30. In the corresponding Schedule A to the Claim Submission, ES157, it was pleaded:

“MM.EE tested in operation and only started at 0 pitch during shifting at berth. Temperatures were seen approaching 400 degrees. During engines starting the crew acted manually on some fuel pumps due to misfiring).Crankcase high pressure noted. At the time of delivery of the ship, MMEE check carried out with the assistance of the Maker and found as follows

Major damage was found on the ME Stb camshaft. This damage forced the decommissioning of the ME (see Jobs RINa of 16/07/21).Major problems were found due to missing or improperly performed maintenance requested by the Maker. this was the consequence of various failures and a need for extraordinary maintenance. Following is a list of services requested and supplies of material – notes regarding the engines which were also noted upon joint inspection and reported under claim items # 18-34- 43-44 …”

31. Schedules A (third and fourth columns) showed relevant job requests, and invoices or purchase orders for repairs, with the amounts claimed by Owners. The documents referred to included purchase orders and invoices related to cylinder heads. Mr Berry KC said that these documents were simply “lumped in” and there was no plea of any defect in the cylinder heads, or cavitation pitting, or failure to maintain, or negligence. That said, I pause here to note that the Tribunal expressly found that on the pleadings although the cylinder heads issue did not “technically fit” within a strict interpretation of EC10 and ES 157, these claims “certainly” fit within Owners’ claim for breaches of clause 10 and 15 of each Charterparty: Catania Award [120] and Sicilia Award [146].

32. On 27 August 2021, Charterers served Defence and Counterclaim submissions and counter schedules setting out their “Remarks”. On 11 September 2021, the Tribunal gave directions including in relation to disclosure. On 8 and 14 December 2021, Owners served Reply and Defence to Counterclaim submissions and reply schedules.

33. On 24February 2022, Owners requested disclosure of, among other things, the “last complete overhaul records” for both main engines of both Vessels. Charterers declined to provide this disclosure. On 15June 2022, Owners provided their disclosure. On 21September 2022, the Tribunal gave directions including that disclosure requests were to be made by 16 December 2022 and that Owners create ‘claim folders’ for each claim. On 3 October 2022, Charterers wrote to OMN (the company that had carried out the 30,000 hour overhaul for Charterers) asking them to provide “all overhaul service reports” for both main engines of both Vessels. OMN responded to say that “these documents were always left on board” and that they only retained invoices.

34. A further CMC took place on 23 December 2022 at which the Tribunal noted that Charterers had ignored Owners’ disclosure requests, and granted them until 27January 2023 to respond. Charterers provided some disclosure on 27 January 2023. That included cylinder head inspection records, work descriptions and reconditioning checklists for the Catania. Owners made further requests including for “all labor (manpower) and spare part purchase invoices relating to engine and diesel generator maintenance for the duration of the charterparties”. Charterers provided further disclosure in August 2023. That disclosure included the cylinder head inspection records, work descriptions and reconditioning checklists for the Sicilia.

35. On 24 May 2023, Owners provided access to the claim folders as they then stood. Subsequently, Charterers indicated that they would object to any further documents being added. On 27 May 2024, the Tribunal rejected Charterers’ application for an order that neither Owners nor Mr. Rawlings be permitted to rely on documents that were not in the claim folders. They expressed “bemusement” that Charterers had apparently misunderstood the intent and meaning of their earlier direction.

36. On 1March 2024 and 4April 2024, factual witness statements were exchanged. Charterers disclosed additional cylinder head maintenance documents for the Catania.

37. First round expert reports were exchanged on 20/21 May 2024. In his report Owners’ expert Mr Rawlings gave evidence for the first time of “premature” failure and overhauls or replacement of cylinder heads. The basis for this contention appears to have improper cooling water treatment. However, it is significant that Charterers’ own expert, Mr. Luukas, noted that 7 cylinder heads on board the Catania had been scrapped “typically due to cavitation pitting” (§3.1.33). He allowed (at §§3.1.40-3.1.41) the cost of replacing 2 cylinder heads which had been reported by MAK to be leaking, noting that the “cause of the leakages is likely to be cavitation pitting”. He made this concession although they were outside the claim description.

38. On 22May 2024, Charterers made a lengthy written application by email to redact parts of Mr. Rawlings’ reports (concerned with cooling water analysis – no longer an issue before me) and for an order that neither Owners nor Mr. Rawlings be permitted to refer to documents not in the claim folders. Mr Berry KC said they did this in fear of a “Trojan horse for a new case” about unpleaded cylinder heads.

39. On 23 and 24 May 2024, the experts met and agreed a Joint Memorandum. They agreed that “based upon the photographs the cylinder heads appeared to have suffered severe cavitation pittingbehind the exhaust valve seats”, and that “this phenomenon appears to be the cause of most of the premature failures of the cylinder head(s)”. They allowed the cost of replacing the 2 cylinder heads that had been observed to be leaking by MAK. Mr. Rawlings would have allowed the other 5 because they were in the same condition on redelivery, but this was not discoverable by routine inspections. Mr. Luukas attributed the cavitation to design and/or material defects. I understand that Charterers did not object to the Joint Memorandum or seek to have it redacted.

40. On 24 May 2024, Owners offered to redact those passages of Mr. Rawlings’ report which dealt with cooling water but “did not form any part of his reasoning” and had been included because he “thought that it was part of his duty to examine all of the evidence presented”.

The Charterers' formal application to prevent the cylinder heads case being run

41. On 25 May 2023, not being satisfied with this offer, Charterers sent a further lengthy email to the Tribunal in support of their redaction application of 23 May 2024. They argued that Mr Rawlings was advancing an entirely new and unpleaded case of a defect on redelivery in saying that the cylinder heads were corroded and pitted and had to be prematurely replaced. In short, in Mr Berry KC’s words, Charterers wished to “debar” Owners from running this case and they sought declarations from the Tribunal by way of an application (“the Application”) which would have that effect (I return to the Application in more detail below).

42. The Tribunal directed that a CMC be convened to hear the Application. That CMC in the event took place on Day 1 of the trial, 10 June 2024. In the meantime, reply expert reports were exchanged on 6/7 April 2024, Mr Luukas addressed the issue of cavitation pitting in essentially the same terms as in his first report. Mr Rawlings, in his reply report, concluded that “whilst [he did] not consider the defective cylinder heads to be related to the originally claimed defect…I still consider Owners claim for the defective and poorly maintained cylinder heads to be a valid claim and related to a defect that existed on redelivery and was in the report referred to in the owners’ original comments” (this was a reference to the MAK report which Owners had pleaded as the basis for their claim).

43. In advance of the CMC on 10 June 2024, Charterers lodged a 14 page skeleton settled by Mr Berry KC and Mr Steward in support of the Application. In that Skeleton Argument, Mr Berry KC and Mr Steward sought declarations from the Tribunal to the effect that a number of claims (including that relating to cylinder heads) had not been pleaded at all or clearly and so as to give "fair warning" and accordingly Owners should not be permitted to advance such claims in support of EC 10 and ES 157. The Skeleton Argument then addressed the pleadings in a similar manner to Mr Berry KC's submissions to me as part of an overall submission that it was not fair to permit Owners to run a case on cylinder heads. Mr Smith KC provided written submissions in response to the Application (as part of his overall written opening). At the hearing, Mr Smith KC took me in some detail through his oral submissions to the Tribunal by reference to the transcript.

44. The Tribunal rejected the Application. I set out their fuller reasons for this rejection at [49] below when I address Irregularity 1. But, in summary, the Tribunal concluded that Owners’ pleadings gave fair warning of the essentials of the case on cylinder heads the Charterers had to meet (it being common ground that this was the test), and that Charterers’ expert had in fact, addressed the case.

45. Mr Berry KC lodged an objection under section 73 of the 1996 Act (I will call this “the standing objection”). However, Charterers also sought permission to serve a further expert report to deal with the “cavitation corrosion case”. I note that they identified 4 issues on which Mr. Luukas would give an opinion, and Mr. Berry KC had said to the Tribunal that if Charterers were permitted to serve a further report “then the objection that I’ve been constrained to register and have registered, would look very different”. Owners consented to such a further report being served.

46. On 13 June 2024, the experts met again to consider the cylinder head claims and produced a further Joint Memorandum. On 14June 2023, Charterers served Mr. Luukas’ new report, and on 17 June 2024 Owners served Mr. Rawlings’ responsive report. On 19and 20June 2024 the experts were cross examined. As I describe when I address Irregularity 2 below, the “workaround” appeared during the evidence of the experts (see [57] below). The hearing was then adjourned. Mr Smith KC submitted to me that Charterers did not object to Mr. Luukas being cross examined about the “workaround” but I accept Mr Berry KC’s point that this was also subject to his standing objection.

47. On 30 September 2024, the parties exchanged written closing submissions which dealt with both ES157 and EC10, and oral closings were heard on 11 October 2024. The Awards were published on 28 May 2025. I will set out below the relevant parts of the Awards for the purposes of the challenge before me.

V. Irregularity 1: the cylinder heads case

48. As I have summarised above, Mr Berry KC’s first complaint is that the Tribunal wrongly allowed the Owners, on Day 3 of the trial, to advance a new and unpleaded case on “cylinder head leakage due to cavitation pitting”. In his skeleton argument he argued that the Tribunal, in effect, allowed Owners to “amend” on day 3 in response to an application by Owners. That appears to be an allegation that the Tribunal allowed a late amendment which it ought not to have allowed (or as Mr. Mabane puts it, the complaint concerns “the Tribunal’s decision to permit Owners to run a new case on cavitation pitting”). The reality is that there was no application to amend and the Tribunal was dealing with the exclusion Application (as described above at [41]-[45]) to shut out or debar Owners from running the cylinder heads case. But as I said during submissions, it matters not how the Application was framed in formal terms. I need to decide whether the way in which it was resolved by the Tribunal meets the test of serious irregularity under section 68.

49. The starting point has to be the Tribunal's own reasons. Rather than seeking to summarise why the Tribunal permitted Owners to run the cylinder heads point, I should set out its own explanation. In the Catania Award, the Tribunal explained:

"116. On 12 June 2024, following the 10 June CMC (which itself followed on from extensive written submissions made in correspondence), we wrote to the parties as follows:

Dear Sirs,

Further to Monday’s CMC, I write on behalf of the Tribunal in both references regarding the Charterers’ application for orders and declarations. Having conferred, we are satisfied that with the redactions ordered below, the Owners’ pleadings give fair warning (as the parties agree to be the test) of the essentials of the case the Charterers have to meet, and that the Charterers' expert has had the opportunity to address, and has addressed. We, therefore, decline to make the declarations and orders requested by the Charterers except to the extent that we order: 1.The passages of Mr Rawlings’ report relating to the cooling water analysis, which the Owners had previously offered to redact, shall be redacted; and 2.The passages relating to the OEM issue (highlighted in pink) shall be redacted. We understand this is uncontroversial since the OEM issue is no longer a live matter.”

117. Our decision was made on the basis that, provided there was no serious prejudice to the other party, the issues should be decided on their merits rather than the outcome being, perhaps, distorted by procedural or pleading points. We were mindful of the nature and scope of Grimaldi’s case generally and the fact that the expert evidence had only been exchanged very late in the proceedings and close to the hearing, the parties having allowed the procedural timetable to slip without seeking the Tribunal’s assistance until very close to the hearing. In those circumstances, we were reluctant to restrict the scope of Grimaldi’s case on the merits on procedural or pleading grounds knowing that the parties and their experts would have sufficient opportunity (albeit in a short space of time and far from ideal circumstances) to, and did, deal with the cylinder head issue that is the subject of this claim.

118. In the event, we do not consider CIN to have been prejudiced by us allowing Grimaldi to run their case on the cylinder head issue in any way that cannot be remedied in due course by an award of costs if deemed appropriate by us.

119. We draw no adverse conclusions from the fact that no mention is made in the Off Hire Report of cylinder head leakages since we understand from Mr Rawlings’ evidence that it is not a defect that could be discovered during the redelivery inspection without opening the crankcase doors to inspect the condition of the crankcase, which was not allowed. As the Owners advanced their claims based on the “defects” that were “noted and agreed” in the Off Hire Report, that may explain why there is no specific reference to leaking cylinder heads in the Off Hire Report (and, therefore, the EC10 claim description).

120. In the event, significant agreement was reached between the experts regarding the cylinder head issue, including as to causation, and we are satisfied that while leaking cylinder heads may not technically fit within a strict interpretation of the claim description of sub-claim EC10, the cylinder head issue certainly fits within Grimaldi’s claim for breaches of clause 10 and 15 of the Charterparty generally, and we consider it to be fair and reasonable to determine the cylinder head issue under this head of claim”.

50. I reject the submission that there was any irregularity, let alone a “serious” irregularity disclosed in the Tribunal’s approach. I have set out the chronology of events (and the way in which the cylinder heads issue came to the fore) above. The refusal of the Application was plainly made after full argument on a point on which (it is common ground) the Tribunal applied the correct test as a matter of law. That test was: did Owners’ pleadings give Charterers fair warning of the essentials of the case that Charterers had to meet? The Tribunal reserved its decision, took time to consider it, and came to a decision which was in my judgment both procedurally and substantively fair.

51. Mr Smith KC argued that this was a form of "case management" decision and is therefore, only open to challenge if it was so wrong that no reasonable arbitrator could have reached it (in effect a submission that a form of greater deference is due on a section 68 application in respect of such procedural decisions because they involve a discretion). He submitted that when a tribunal has exercised a discretion (for example to exclude or admit certain evidence) that is only susceptible to challenge if it is “outside the bounds of what can be characterised as an exercise of discretion at all”: Mustill & Boyd at [14.58]. Mr Smith KC submitted that a challenge to a case management decision will only succeed if “the arbitrator arrived at a decision which no reasonable arbitrator could have arrived at” which would be “rare indeed”: Mustill & Boyd §14.65; Kalmneft -v- Glencore [2002] 1 Lloyd’s Rep. 128 at[85]; and Brake -v- Patley Wood Farm LLP [2014] EWHC 1439 (Ch) at [141]. See also, in this regard, the helpful discussion in Zuckerman on Civil Procedure (Fifth Edition) at [25.127]- [25.129] of the higher threshold applied by civil courts of appeal to challenges to case management decisions of lower courts.

52. There is force in these submissions. However, I prefer not to decide the applications before me on the basis of classification of the type of decision made. That can lead one into an unnecessary debate (at least unnecessary for this case) about what counts as a “case management” decision. The statutory issue for me is whether there was serious procedural irregularity and I will confine myself to that question. The Tribunal was faced with a dispute which commonly arises in litigation during trial and it was required to make an assessment as to whether to exclude evidence and argument on a point which perhaps had only emerged in clear terms at a later stage in the proceedings. The way in which it addressed that issue was plainly procedurally fair and regular. The cylinder head issue as a point was clearly “in play or in the arena … even if not precisely articulated”: Mustill & Boyd §14.50, particularly given that “Arbitration is rightly a less formal process and concentrates on substance rather than form” (Cadogan Maritime Inc. -v- Turner Shipping Inc. [2013] 1 Lloyd’s Rep. 630, per Hamblen J at [32]).

53. In my judgment, in circumstances where the Tribunal had dealt with three case management conferences, was aware of all of the procedural background, had read all of the expert evidence and all of the factual evidence, read extensive written submissions and heard lengthy oral submissions, it acted in a procedurally fair manner. The parties agreed what the test was and I consider the Tribunal correctly concluded that “Charterers’ expert has had the opportunity to address, and has addressed” the“cylinder head issue” (Award [116]). I note that Mr. Luukas had dealt with and considered the Owners’ claims to recover the cost of replacing cylinder heads that were in a defective condition on redelivery at §3.1.27 – 3.1.42 of his report. He had allowed the cost of two as I have described above. There was, therefore, in my judgment nothing surprising (still less wrong or obviously wrong) about the fact that the Tribunal allowed Owners to pursue their claims for the other five (for the Catania) and eight (for the Sicilia).

54. I would add that even outside the arena of arbitration (which is generally less formal than court litigation), this is not a decision on pleadings and evidence which I consider could be realistically challenged on appeal on procedural fairness grounds in ordinary civil litigation.

55. The challenge under Irregularity 1 fails.

VI. Irregularity 2: the "workaround"

56. As Mr Berry KC accepted, this complaint is closely related to Irregularity 1. The pleaded complaint is that the Tribunal’s decision “permitted (Owners) then to go even further away from (their) pleaded case during the course of the hearing by abandoning the original theory (of improper water cooling treatment) and introducing, during the trial, a new supposed “workaround” and a new theory that the Claimant could have identified and rectified the cavitation pitting at the schedule 30,000 hour overhaul”.

57. I reject this complaint. In my judgment, Owners did not introduce a new "theory" in support of the cylinder head claims. It is correct that the “workaround” was first raised during the trial, but that fact needs to be viewed in context. The cylinder heads were unarguably in a defective condition on redelivery, even if they were not yet leaking sufficiently for that to be observed without opening up. Indeed, Charterers expressly agreed that the state of the cylinder heads on redelivery would be a breach of clause 15 unless caused by fair wear and tear (Day 12/118:15-25). Mr Luukas’ argument was that the leaks (which both experts agreed were caused by cavitation pitting) were a consequence of a design issue (a latent defect). Mr. Rawlings referred to the “workaround” in response, pointing out that even if there was a design issue that did not justify the cylinder heads being left in a defective condition. It was not, as such, his "theory", but his response to Mr. Luukas’ point.

58. More importantly, Mr Luukas’ evidence (as recorded in the Award at [124] and [125]) was that “cavitation pitting was a well-known phenomenon, so much so that third party providers could readily be found advertising ways of dealing with it” which would “set the clock to zero”. He also agreed that the “workaround” was specifically envisaged by OMN’s own standard form of report. That is a reference to the OMN reports as disclosed by Charterers. I was referred to an example in pre-reading material.

59. I do not accept Mr Smith KC’s submission that Mr Berry KC is precluded from taking this point on the “workaround” because he made no specific objection when it arose. His standing objection applied to this also. But, in my judgment, Charterers’ second complaint does not come anywhere close to engaging section 68. In short, there was no irregularity in the Tribunal taking into account the "workaround" point which emerged from Mr Luukas’ evidence and was clearly in play.

VII. Irregularity 3: negligence

60. This is a freestanding complaint in the sense that it is independent of success on Irregularities 1 and 2. Mr Berry KC argued that the ratio of the Tribunal’s decision was materially the same in both cases and is to be found in [132] of the Catania Award, in respect of which he isolated the following parts to support his case:

a. “… an issue with cylinder heads was eminently discoverable and would have been discovered had the (valve) seats been taken out at the 30,000-hour overhaul”

b. “… by the time [Charterers] conducted the 30,000 hour overhaul it must have been apparent that there was an issue with the cylinder heads given the rate at which [Charterers] were having to replace them”.

c. “Therefore, tonot investigate the issue as part of the 30,000-hour overhaul we consider amounts to a lack of due care and attention, and a failure to maintain and repair”.

61. The ratio of the Awards was, therefore, argued Mr Berry KC, negligence by Charterers (in breach of the clause 10 contractual duty), by not investigating at the 30,000-hour overhaul the cause of an already existing problem of high rate of cylinder head replacements. Mr Berry KC said a “lack of due care and attention” is a synonym for negligence. He argued that negligence was however never pleaded or argued and was in fact eschewed; and because the Tribunal decided the case on an unpleaded basis it fell into a significant factual error in concluding that the problem with cylinder heads was manifest at the 30,000 overhaul. Mr Berry KC submitted that in fact the evidence (and other findings of the Tribunal) were to the effect that the cylinder heads failed after the 30,000 hour overhaul of engines. I will call this alleged error “the Factual Error”, by way of shorthand.

62. I accept at the level of principle that deciding a case against a party on a basis which has never been pleaded may amount to a procedural irregularity. But in identifying what the Tribunal did and did not decide, I do not find it helpful to use the language of ratio decidendi. That is a technical concept concerned with isolating that part of a higher court’s judgment which was crucial to its decision, and as part of an exercise of determining what binds a lower court and what can be regarded as obiter dicta under the doctrine of stare decisis. The better approach, in the arbitration context before me, in deciding what was decided and why, and whether it had been pleaded, is to focus on what the Tribunal said and to look at the Award as a whole, as opposed to isolated paragraphs.

63. Accordingly, I first need to set out in fuller terms the material and determinative parts of the Award and the route of reasoning. Rather than citing it at length here, I have reproduced that text from the Catania Award in an Annexe to this Judgment and will cross-refer to the Annexe by paragraph numbers, as appropriate below.

64. Mr Smith KC provided an explanation, by reference to some of the evidence including his cross-examination of Mr Luukas, and Mr Rawlings’ evidence about cylinder head failures, in justifying these findings. He argued that there was an evidential basis for the findings in the Annexe, and I note that the witness evidence on this application (from both sides) also goes into some detail on the evidence with the aim of attacking, or justifying the findings, including [132] which is said to contain the Factual Error (I return to this below).

65. It is not appropriate to enter into that form of evidential debate on a section 68 application. I am however satisfied that Mr Smith KC was correct in his main argument that the totality of the relevant section of the Award has evidential support, particularly in the evidence of the two experts. Whether the ultimate conclusions were right or wrong, they were based on evidence and an overall evaluation by the Tribunal.

66. In my judgment, when the entire section on the cylinder heads is considered, the Tribunal made a finding that there was a failure by Charterers to properly manage thecylinder head issue for which there was a knownworkaround. Reading the Award in a commercial way and without looking for problems,the Award was not based on unpleaded negligence, but on a finding that Charterers failed to deal with the latent defect consistently with good commercial management practice. Mr Smith KC was right to submit that this is precisely how the claim had been pleaded all along.

67. I would add that read in the context of the Award on EC10 as a whole, this conclusion is even clearer and is summarised at [142] (see Annexe) where the Tribunal said Owners were entitled to damages “…for CIN’s failure to maintain and repair the main engine cylinder heads …in accordance with good commercial management (including maintenance)practice…and/or to redeliver that equipment in the same good order and condition as on delivery fair wear and tear excepted”.

68. In so far as it is necessary to go further, I also agree with Mr Smith KC that the real basis of the Award is at [136] and following (see the Annexe) where the Tribunal concluded that Mr. Luukas (despite a late attempt to resile from the position) had been right to allow the cost of replacing two cylinder heads, and that on the evidence it was appropriate to allow for a further five cylinder heads. Charterers admitted and agreed that the cylinder heads were not, on redelivery, in the same condition as at delivery, and the Tribunal concluded that this was not due to fair wear and tear but due to a lack of maintenance and repair. It is wrong to view matters in any more complicated a manner.

The Factual Error

69. In the evidence of Mr Mabane for Charterers, a direct attack was made on the finding of fact by the Tribunal in the Award at [132] that failures of cylinder heads should have been addressed at the 30,000 hour overhaul. It was said that the conclusion was flawed because it overlooked the evidence that the pattern of premature failures of cylinder heads only occurred after the 30,000 hour overhaul. I accept that the rate of replacements after the overhaul cannot logically support a finding that the issue was “obvious” by the time of the overhaul. It was said the Tribunal’s finding of liability in [132] was accordingly “bizarre” on the facts. It was also variously described as “factually flawed” and “nonsense” in Charterers’ written submissions.

70. Mr Berry KC, however, underlined in his oral submissions that he was not seeking to attack a finding of fact. His point was that by deciding the matter on the basis of an unpleaded allegation the Tribunal was led to make this error. He said the factual error was the “substantial injustice” but the “serious irregularity” was making a finding on the basis that was not pleaded. So, as I understood his argument, the factual error was a symptom of the Tribunal having taken an erroneous procedural approach.

71. There does seem to me to be an oddity in the Tribunal’s conclusion in [132], and Mr Smith KC accepted it was difficult to see how they got there. However, it is not the function of the Court on a section 68 application to question factual findings. The real thrust of Charterers’ point is that the Tribunal’s decision on EC10 and ES157 is wrong based on the evidence it heard and it must have overlooked that evidence. Even if Charterers could persuade me that the Tribunal’s decision was wrong, that would not be within the scope of the section. That is for the reason given by Teare J in UMS Holdings Ltd. -v- Great Station Properties SA. [2017] EWHC 2398 (Comm) at [31]. In order to decide whether the Tribunal was or was not right the Court would have to undertake precisely the analysis undertaken by the Tribunal, to revisit and assess all the evidence and all of the submissions and duplicate the Tribunal’s reasoning. That is plainly outside the proper scope of a section 68 challenge, as described in Mustill & Boyd at [14.56].

72. Although, as I have said, Mr Berry KC persuasively submitted that he relied on the Factual Error not as a challenge to the Tribunal’s findings but only in support of his procedural complaint, I consider Charterers cannot get away from the fact that their core submission relies on a mistake in [132] of the Award. That clearly travels into what the cases show is forbidden territory for section 68 purposes.

73. The case on Irregularity 3 fails. Overall, in my judgment, Mr Smith KC was right to argue that the three limbs of the Charterers’ application are in substance a complaint that, on the evidence (including the supplemental and second supplemental expert reports) the Tribunal should have rejected the relevant parts of EC10 and ES157. Having considered all of the evidence the Tribunal preferred Mr. Rawlings’ evidence and allowed the disputed parts of EC10 and ES157.

VIII. Substantial Injustice

74. If Charterers can establish serious irregularity, they also need to show that the specific irregularity has caused substantial injustice. Given that they have not overcome the first hurdle, this second issue does not arise. The Charterers’ case on substantial injustice was rather unclear. At §4 of the Claim Form they make a blanket assertion that they were not given a fair opportunity to deal with the ‘new’ case. They then go on to say that they were deprived of the opportunity to investigate, obtain and call relevant factual evidence, marshal documents and adduce expert evidence. However, they make no attempt to say which of the three alleged irregularities caused which part (or parts) of the alleged injustice. In his oral submissions in reply, Mr Berry KC summarized Charterers’ case as being that there is likely to have been more documentation had they been searching at the date of the original pleading (2021) about overhauls that had just recently been finished. On the basis of the evidence before me, I consider that submission, and the evidence in support of it from Mr Mabane, to be essentially speculative. This is not a case where the claimed irregularities make it inherently likely that substantial injustice flowed from their occurrence. Had I been required to decide this issue, I would have decided it against Charterers. I will briefly explain why.

75. Mr. Berry KC lodged his objection to the refusal of the Application for declarations on Day 3. As I have noted above, he formally registered an objection but then immediately applied for permission to put in a further report from Mr. Luukas dealing with four specific issues “to deal with the cavitation corrosion … to the extent that we can”. Owners consented to this. Mr. Luukas’ report was served and Mr. Rawlings responded by way of a further report. They identified four issues that arose and sought and obtained permission to deal with them. I also accept Mr Smith KC's submission that although Charterers declined to put in evidence dealing with cavitation corrosion until it was clear whether it was in or not, they had clearly been investigating it in the meantime because they knew by Day 3 what four issues Mr. Luukas needed to deal with. I consider Charterers were, therefore, able to put in (further) expert evidence to deal with the issue. As I have noted above, Mr. Luukas had already dealt with the issue to some extent because he had allowed the cost of 2-cylinder heads against EC10 (and indeed had discussed the issue of cavitation damage – and the cause of it – at the expert’s meeting before the hearing began). It also appears that much of the expert evidence on this issue was agreed, as the Tribunal pointed out at Award [120]-[123]. In particular there was no dispute about the fact that cylinder heads were failing prematurely due to water leakage and that those that were scrapped were suffering from severe cavitation pitting (Joint Memorandum §2.4).

76. I turn to Mr Berry KC’s complaint that Charterers were deprived of the opportunity to “marshal” (presumably search for and disclose) further documents relating to cylinder head maintenance. I was not persuaded by this submission. The Tribunal had ordered Charterers to give disclosure of “main engine last complete overhaul records prior to redelivery”. That direction clearly encompassed the overhaul of the cylinder heads carried out as part of the 30,000 hour overhauls of the main engines on both Vessels. That required Charterers to search for documents relating to cylinder head maintenance. It is not open to Charterers to say that they did not do so. I accept Mr Smith KC’s submission that the reality is that they did so and indeed produced a substantial amount of documentation. Some of this material was produced as part of their disclosure and some was attached to Mr. Manna’s witness statements (Mr Manna was in charge of Technical Management and Technical Inspection of the Vessels for Charterers). In my judgment, on the material before me, there is no reason to believe that Charterers have, or ever had, any further documents relevant to cylinder head maintenance. If they did then they (or a list of them) could have been produced as part of the evidence in support of this application. I doubt that Charterers had any further disclosure to provide. This is consistent with the Tribunal’s conclusion that they did not have in place a proper system of proactive (or preventative) maintenance (Award [129]).

77. As to the complaint that Charterers were deprived of the opportunity to ask OMN for further documents, there are two answers to that point. The first is that OMN were Charterers’ sub-contractors. Charterers’ search obligation when they gave disclosure included the files of their sub-contractors. The second is that, on Charterers’ own evidence it is clear that they did in fact ask OMN, in October 2022, whether they had any further documents. OMN’s response was that they did not.

78. Charterers also complain that they had no opportunity to require Owners to give relevant disclosure. That is a rather unconvincing point because Charterers’ own witnesses confirmed (and Charterers now rely on the fact) that there was no issue with premature failures prior to the 30,000 hour overhauls. More to the point, the running hours for the cylinder heads overhauled at the 30,000 hour overhauls show that none had previously failed. Further, I note that Charterers did ask for additional disclosure. What they asked for was documents relating to what (if anything) Owners had received by way of credit for the scrapped cylinder heads.

79. In his oral submissions Mr Berry KC argued that Charterers did not have the opportunity to lead factual evidence on the issue of cylinder head maintenance. They in fact led evidence from Mr. Manna. He gave evidence about the overhauls of the main engines, exhibited the records of the cylinder head overhauls and documents relating to the replacement of cylinder heads after the overhauls showing that they were replaced due to “considerable water leakage”. Mr Smith KC was right to submit that Mr. Manna was the obvious witness to give evidence as to the overhauls of the cylinder heads and the work carried out after those overhauls in response to the ongoing problem with water leakage. If (and to the extent that) Charterers had not considered this issue with him when preparing his statement (notwithstanding the fact that he exhibited the relevant documents), they clearly had the chance to consider it with him before he gave his evidence. Finally, as to the complaint that Charterers did not have the opportunity to lead evidence from Captain Scognamillo, that is also not convincing. The evidence from Mr Manna leads to the conclusion that since Captain Scognamillo made no report, carried out no investigation and provided no feedback in 2016 or thereafter, he would not have been able to provide any useful evidence if proofed in early 2024 (when factual statements were exchanged). It is even less likely (and highly speculative) that anyone from OMN would, if asked in early 2024, have been able to assist with details of what had been done in 2016 and 2018 (over and above what was written in the documents which Charterers did disclose). Overall, I was not persuaded that Charterers have been deprived of any meaningful opportunity to improve their factual evidence on the issue of cavitation corrosion.

IX. Conclusion

80. In his first report, Mr. Luukas allowed the cost of replacing two cylinder heads that were in fact leaking at the moment of redelivery. The Tribunal observed that Mr. Luukas did not suggest that the other cylinder heads (which Owners were obliged to replace in October and November 2020) were in materially better condition on redelivery. Those cylinder heads were in that condition because of the same failure to repair and maintain and/or the state of those heads was (likewise) not caused by fair wear and tear. The Tribunal was, therefore, right to allow Owners to pursue their claims and entitled on the evidence to allow those claims.

81. Charterers cannot establish any of the pleaded irregularities or any of the pleaded injustice. If one drills down into the more far reaching complaints set out in their witness statements it becomes increasingly obvious that their real complaint is that the Tribunal misunderstood or misapplied the factual or expert evidence. This is in reality an attempt to appeal against the Tribunal’s conclusions on the evidence.

82. I dismiss the applications.

ANNEXE: THE REASONING OF THE TRIBUNAL ON THE CYLINDER HEADS CLAIM

Discussion and Findings

123. Many of the matters of construction referred to in the overarching issues part of this Award are relevant to this claim.

124. It is CIN’s expert, Mr Luukas’, evidence that:

124.1. The premature failure of cylinder heads from cavitation pitting would present with water leaks, consistently with what MAK/CGT had observed.

124.2. Such cavitation pitting was a well-known phenomenon, so much so that third- party providers could readily be found advertising ways of dealing with it. This consisted of removing the seat and (unless the cavitation pitting was too advanced, in which case the cylinder head would be scrapped) machining the pitted surface and, as necessary, re-fitting an oversized seat to make up the difference in diameter. This would ‘set the clock to zero’.

124.3. In fact, using an oversized valve seat in this way is a well-known part of the overhaul procedure, specifically envisaged in OMN’s standard form of report.

125.It is Mr Luukas’ opinion that as the cylinder head issue was due to an inherent flaw in their design, in particular, poorly designed cooling water passages and chambers for the exhaust valve seats, which induced the onset of cavitation pitting and erosion attack of the cast iron heads, there was no lack of maintenance by CIN who had to perform more maintenance than would normally be required (i.e., changing cylinder heads more regularly) because of the inherently flawed cylinder heads.

126.This corresponds with CIN’s contention that what was going on with the cylinder heads was ordinary and fair wear and tear. They say that if the cylinder heads on board the Vessel at the time of delivery to CIN (and that CIN kept replacing from the same original equipment manufacturer) only had a service life of 7,000-8,000 hours because of cavitation pitting, then the wear and tear created by normal usage that leads to the scrappage after 8,000 hours is fair wear and tear, because fair wear and tear is normal use as applied to this part.

127. Grimaldi refers to it as a fundamental mistake of CIN to say that on delivery the cylinder heads only had a service life of 7-8,000 hours. Grimaldi contends that at the time of delivery the cylinder heads were capable of remaining in service until at least 30,000 hours because there were no problems before the 30,000-hour overhaul, and that the reason the cylinder heads had a service life of only 7-8,000-hours by the time of redelivery was because CIN had failed to properly manage the cylinder head issue, for which there was a known workaround. We accept this.

128. Pursuant to clause 3(c) of the Charterparty, CIN was responsible for repairing any latent defects that manifested themselves later than six months after delivery. Therefore, as CIN did not notify Grimaldi of this defect within six months of delivery, it was CIN’s issue to deal with, and the evidence suggests they failed to do so in a manner that can objectively be said to have been consistent with good commercial management (including maintenance) practice.

129. We accept CIN’s submission that wear and tear of the cylinder heads can be traced along an exponential curve and that, at some point in time, each cylinder head would reach the “berserk” stage of the exponential curve where cavitation pitting would cause the condition of the cylinder head to deteriorate more quickly. What is lacking, however, is sufficient evidence of a system of maintenance to show that CIN had investigated and was proactively managing the cylinder head issue (preventative maintenance) as opposed to just reacting when cylinder heads showed signs of leaking (remedial maintenance).

130. What the evidence shows is that CIN conducted the 30,000-hour overhaul over a period of several months during 2018 while the Vessel remained in service, by which time, cylinder heads were failing prematurely and being replaced with increased regularity. CIN contends that this is a perfectly acceptable way of dealing with deteriorating cylinder heads, but we have not been persuaded that what CIN was doing (switching out leaking cylinder heads and replacing them with non-leaking cylinder heads) and the way they appear to have been doing it (some cylinder heads did not have serial numbers and others had been fitted with sleeves to try and prevent leakage) is consistent with the objective standard of good commercial management (including maintenance) practice. Given that it is common ground that two cylinder heads were leaking at the time of redelivery (the cost of which Mr Luukas allows), we doubt whether CIN’s approach to the cylinder heads can even be said to have met their minimum performance rule, since there is no evidence or suggestion from either party that any cylinder heads were leaking at the time of delivery.

131. It is Mr Rawlings’ evidence that only two cylinder heads would have been due for a 45,000-hour overhaul when the Vessel entered the dry-dock in October 2020, and that 13 of the 18 cylinder heads said to have been overhauled during CIN’s 2018 30,000- hour overhaul (which was not done in a drydock, but over a period of 8 months while the Vessel was in active service), failed prematurely (no.2 starboard was changed twice). Mr Rawlings also points out that the two cylinder heads that were found to be leaking on redelivery only had 4,029 and 7,777 running hours respectively since their last overhaul. Mr Rawlings refers to a third cylinder head that is said to have failed during the period between redelivery and the Besiktas dry-docking, which had only 2,236 running hours at the time of redelivery. He says that at most it would have clocked a further 1,000 to 1,500 running hours at the time of failure. Mr Rawlings considers it likely, therefore, that this cylinder head was also in a leaking condition at the time of redelivery, and it is his evidence that for three cylinder heads to have failed with so few running hours since their last 15,000-hour maintenance was carried out, indicates the poor state of the cylinder heads in general, as was found a few months after redelivery during the Besiktas dry-dock. We accept this evidence.

132. We accept Grimaldi’s submission that an issue with cylinder heads was eminently discoverable and would have been discovered had the (valve) seats been taken out at the 30,000-hour overhaul. The parties disagree about whether removing the seats is part of a normal 30,000-hour overhaul. The evidence shows that CIN conducted the 30,000-hour overhaul over a period of several months while the Vessel remained in active service. We are unsure to what extent that is relevant to their ability to take the seats out and we do not think it really matters because the point is that by the time CIN conducted the 30,000-hour overhaul, it must have been obvious there was an issue with the cylinder heads given the rate at which CIN were having to replace them. Therefore, to not investigate the issue as part of the 30,000-hour overhaul we consider amounts to a lack of due care and attention, and a failure to maintain and repair. It follows that we accept Grimaldi’s submission that it is immaterial whether removing the seats is a standard part of a 30,000-hour overhaul because, by the time of the 30,000-hour overhaul there was clearly an issue with the cylinder heads that needed investigating regardless of whether it was done as part of the 30,000-hour overhaul or not.

133. We reject CIN’s suggestion that dealing with the defect would have amounted to improvement of the Vessel and, therefore, betterment. In our view, it simply amounts to good commercial management (including maintenance) practice, which was the standard by which CIN was required to maintain and repair the Vessel.

134. The only question, in our view, is as to the quantum of damages, and it is in that respect that we consider the minimum performance rule to be most relevant.

135. It is an overriding theme of CIN’s submissions generally that a lot of the costs claimed by Grimaldi in this arbitration are costs associated with an overhaul that they were anyway going to have to do (the pre-planned overhaul argument). We have dealt with that argument already in our findings on the parties’ overarching submissions. We further note that Mr Rawlings disallowed a considerable portion of the sums initially claimed here as being not relevant to the claim, such that Grimaldi invite us to award €294,337.80 out of €1,294,668.17 that was initially claimed.

136. Mr Luukas allowed for two cylinder heads based on one version of what MAK/CGT reported at the time of redelivery. Despite resiling slightly from that position (and thereby aligning with CIN’s position that nothing should be allowed), we nevertheless consider his evidence, combined with (all versions of) the MAK/CGT evidence, sufficient to justify an award of damages for the cost of two cylinder heads.

137. Therefore, the only question remaining is whether it is reasonable for Grimaldi to recover the cost of more than two replacement cylinder heads. In our view it is.

138. It is common ground between the experts that as part of OMN’s overhaul during the Besiktas dry-dock, eleven cylinder heads were refurbished and seven were scrapped.

139. Mr Luukas accepts that the reason seven had to be scrapped was “typically due to cavitation pitting in way of the exhaust valve seating and cooling water spaces” and that they were “considered beyond repair”. He allows for the cost of two out of seven in the sum of €77,120 on the basis that the MAK/CGT report identified two that were leaking in July. He also allows €3,000 for attendance by OMN and €6,250 as the cost of rectifying the crankshaft seals causing the oil leak. He concludes that the remainder of the monetary claim is for Grimaldi’s account because it relates to the 15,000 and 30,000-hour overhauls which he says were pre-planned.

140. Mr Rawlings noted that while some of the cylinder heads may have been scrapped at the Besiktas dry-dock due to cavitation pitting, others appear to have been scrapped for other reasons. For example, one was scrapped because it was found without a serial number, three were found with inserts fitted to the exhaust valve seat pocket (not a recognised repair for the cavitation pitting issue) and one was found to have a hole in the intake valve seat and scrapped. It is Mr Rawlings’ evidence that the five cylinder heads that were scrapped by RINA during the Besiktas dry-dock would have been in the same poor condition at the time of redelivery but were not discoverable by routine inspections. We accept this evidence and we note that Mr Luukas does not suggest that the cylinder heads that he does not allow for were in materially better condition. It is his evidence that they were all suffering from the same underlying issue (cavitation pitting in way of the exhaust valve seating) as the two he does allow for. Therefore, we consider it reasonable for Grimaldi to recover the cost of the seven scrapped cylinder heads as opposed to just the two allowed by Mr Luukas.

141. We have not been sufficiently persuaded that Grimaldi would not have incurred some or all of the other costs claimed in the normal course of the overhaul they were carrying out. Therefore, we consider it reasonable, all things considered, to take Mr Luukas’ allowance of €38,560.00 for each cylinder head and multiply that by seven. That equates to €269,920.00. To that we have added the €3,000 Mr Luukas allowed for OMN’s attendance and €6,250.00 that he allowed as the cost of rectifying the crankshaft seals. That equates to €279,170.00, which is slightly less than the €294,337.80 which Grimaldi finally invited us to allow.

142. For the reasons given above, we find Grimaldi entitled to €279,170.00 in damages for CIN’s failure to maintain and repair the main engine cylinder heads and crankshaft seals in accordance with good commercial management (including maintenance) practice, in breach of clauses 10(a)(i) and 10(b) of the Charterparty, and/or to redeliver that equipment in the same good condition as on delivery fair wear and tear excepted, in breach of clause 15".

For advice on a matter of this kind in France, contact our business lawyer in Paris.


Open Justice Licence (The National Archives).

Neighbouring decisions

Preliminary case review

Send your documents. Receive an analysis.

Send us the documents in your case. Hassan KOHEN reviews them personally and sends you a first written analysis of your situation within 24 working hours.

  • Written analysis by the lawyer, €80 incl. VAT
  • Personal reply within 24 working hours
  • 100% confidential, legal professional privilege guaranteed
  • Up to 1 GB of documents in total, folders and sub-folders accepted
80 €incl. VAT

Preliminary review of your case. Review of your documents and a first written analysis by Hassan KOHEN within 24 working hours. Payment is made online after this form is submitted.

  • Up to 1 GB of documents in total, folders and sub-folders accepted
  • Secure payment, no card details stored
  • Terms and fee agreement

Click or drag your files here
All formats accepted (PDF, Word, images, etc.)

Sending...

Payment constitutes a request for immediate performance of your analysis. Your data is used solely to process your request.
Terms · Privacy policy.

IA juridique gratuite

Une question de droit ? Demandez à Judith.

Judith cherche dans les codes, la Constitution, la Convention européenne des droits de l’homme et les décisions des juges, puis vous montre les textes et les passages d’arrêts qui pourraient répondre à votre question, avec leur source officielle. Gratuite, sans compte, elle ne rédige rien à votre place. Découvrir Judith, l’IA juridique gratuite du cabinet.

Trois recherches par jour, sans compte. Votre question est enregistrée et relue par le cabinet pour améliorer l’outil : n’y mettez ni nom ni information sensible.