Civil United Kingdom

Shoba Patel & Anor v HDI Global Specialty SE

Official source

Neutral Citation Number: [2026] EWHC 2602 (KB)

Case No: QB-2020-000563

IN THE HIGH COURT OF JUSTICE

KING’S BENCH DIVISION

Royal Courts of Justice

Strand, London, WC2A 2LL

Date: 20 October 2026

Before :

Rory Dunlop KC

– – – – – – – – – – – – – – – – – – – – –

Between :

(1)
MRS SHOBA PATEL
(2)
MR ANIL NICKY PATEL
Claimants
– and –
HDI GLOBAL SPECIALTY SE Defendant

– – – – – – – – – – – – – – – – – – – – –

Robert Deacon (instructed by Branch Austin McCormick LLP) for the Claimant

Thomas Rothwell (instructed by Gordons LLP) for the Defendant

Hearing dates: 6-9 October 2026

– – – – – – – – – – – – – – – – – – – – –

Approved Judgment

This judgment was handed down remotely at 10.30am on 20 October 2026 by circulation to the parties or their representatives by e-mail and by release to the National Archives.

………………………..

Rory Dunlop KC, sitting as a Deputy High Court Judge

Introduction

1. The Claimants are a mother and son. They live at 355 Cippenham Lane, Slough, Berkshire (“the Property”). The Claimants bring this claim against the Defendant, an insurer, under a home insurance policy (“the Policy”). The Particulars of Claim are solely directed at the period between 15 October 2013 to 14 October 2014, when the Policy was in force (“the Policy Period”). Integra Insurance Solutions Ltd (“Integra”), the Defendant’s underwriting agent, were on risk for the year before the Policy Period but nothing turns on that as the pleaded claim is focused on the Policy Period.

2. The First Claimant is the named insured and the legal owner of the Property. The Second Claimant claims a beneficial interest in the Property.

3. The Claimants claim an indemnity from the Defendant in respect of two matters:

i) Storm damage, from a storm on or around 14 February 2014 (“the 2014 Storm”); and

ii) Subsidence damage.

4. The alleged damage is divided into broad sub-headings in paragraphs 7(a)-(e) and 9 (a)-(e) of the Particulars of Claim. In fact, the Claimants did not pursue claim under each of these sub-paragraphs. I will return to the detail of this below.

5. The Defendant alleges that the storm damage within the scope of the Policy was limited and the repairs causally connected to the 2014 Storm have either been done or paid for. The Defendant does not accept that there has been any damage to the Property from subsidence, certainly not during the Policy Period.

6. This claim has taken an extraordinarily long time to come to court. The alleged damage (from the 2014 Storm and then from subsidence) is said to have become apparent in early 2014. It is now over 12 years later. These delays are the result of the Claimants filing this claim just before the limitation period and then being slow in prosecuting the claim. I will have more to say about that below.

7. The proceedings have been case managed in an attempt to bring all the evidence before the court at once – evidence on liability and evidence on quantum. The parties have provided expert evidence from structural engineers and from quantity surveyors. The quantity surveyors have agreed costings on certain premises. The only experts who gave oral evidence were the structural engineering experts. I refer to them below as ‘the experts’.

8. The parties are agreed that, in this judgment, I will only address liability. If the parties cannot agree an order consequential on my judgment, I will consider written submissions from them on what order to make. Mr Rothwell, counsel for the Defendant, emphasised that the case was closed and there should be no more evidence. Mr Deacon, counsel for the Claimants, wished to reserve the right to apply to admit further evidence in light of my judgment. I indicated that I could not shut him out from making an application but I would need persuading that it would be appropriate to receive new evidence. The case management of these proceedings has been done on the basis that all evidence should have been before the court by now.

9. I have received considerable assistance from all parties in this trial. I am grateful to both counsel, to those who instructed them, and to the experts.

Factual Background

The Property

10. The First Claimant is the owner of both the Property, a semi-detached house in Slough, and the neighbouring property, 353 Cippenham Lane (“353”). The Property and 353 share a party wall (“the Party Wall”).

11. The Property was built around 1935. The experts agreed that the Property was built on very shallow foundations and would never be stable. The soil on which the Property was built has a plasticity index of less than 10%. The experts agree that that plasticity index means there is a low risk of subsidence – in other words, the soil is unlikely to shrink significantly even if, for example, there are tree roots nearby. The Property and 353 lie on a geological boundary and the soil underneath each is not the same.

12. The experts agree that the front gable to the Property and 353 is not restrained. It is not, for example, secure to the Party Wall. Mr Billingham, the Claimants’ expert, accepted in cross-examination that this was a construction error. The gable to the rear of the Property is restrained but the gable to the front is not. The result of this construction error is that the Property’s front gable wall is, in the words of Mr Billingham, ‘a very unrestrained floppy wall’. Put another way, there has always been a risk that the Property’s front gable wall might fall down.

13. From the outside it looks like there is one front gable, shared by the Property and 353. In fact, the two halves of that front gable are of different material. 353’s half of the front gable is made of brick. The Property’s half of the gable is made of timber and woodwall slabs.

14. The two rooms at the front of the Property are the lounge and the study. There is a rainwater drain just in front of the building in the middle between the lounge and the study. At the back of the Property is a kitchen and a patio. The Property also has a garage. There is a small garden at the front of the Property and a larger garden at the rear. At the front of the small garden is a low boundary wall which runs along a footpath for pedestrians (“the Boundary Wall”). The Property and 353 share that boundary wall but there is a fence separating the two.

15. The Property is located around 7 miles from Heathrow Airport. I was not shown any images of the distribution of houses around the Property. Mr Billingham accepted, in cross-examination, that the Property was not in the centre of Slough but he said that it was ‘one of many houses’. Mr Beale described the location in his report as ‘relatively open country and outskirts devoid of substantial obstructions which can cause wind fluctuations’. The word ‘relatively’ is doing a lot of work in that sentence. From all the evidence I have heard and seen (including evidence from the Second Claimant, photographs from various parties and a valuation report from the Bank of Scotland referred to below) I find that the Property is located on a suburban road in a residential area, surrounded by semi-detached houses. The Property may be in the outskirts of Slough but there are many other houses around it which could obstruct and deflect wind.

The 2003 subsidence claim

16. The Claimants have lived at the Property, with other family members, since September 2002. When the First Claimant first purchased the Property it was with the help of a mortgage from the Bank of Scotland. The Second Claimant says that there was a survey which noted no major issues. I have seen a Bank of Scotland valuation which records an inspection on 15 March 2002 on the Property. The notes record that the Property was in an acceptable condition but there was evidence of ‘penetrating dampness particularly to the conservatory’.

17. In or around 2003 the Claimants made a claim for subsidence to previous insurers in respect of the Property. The Second Claimant says that the damage from subsidence that he noted was cracking (internally and externally) and that the kitchen floor had sunk. The Second Claimant says he was told that the cause was clay shrinkage due to a Scots Pine tree in the rear garden and the tree was removed and the house repaired. He says that the cracking was repaired and there were no more visible signs of damage for over a decade until the appearance of cracks after a storm in 2014. The kitchen floor does not appear to have been repaired.

18. In a letter dated 14 January 2004 an inspector wrote on behalf of GAB Robins and said there was ‘slight subsidence damage to the foundations of the rear right-hand corner’ of the Property. He said the damage was ‘very minor’. He said he thought that the principal cause was the Scots Pine tree in the garden and he would like to see that removed.

19. GAB Robins wrote two letters dated 25 October 2004 to the First Claimant and Mr Ram (who, I infer, is or was the First Claimant’s husband). In the covering letter of 25 October 2004 GAB Robins referred to a phone call with Mr Ram. In that phone call Mr Ram expressed concern that the kitchen floor had moved. The inspector from GAB Robins said he had not noticed that on his inspection. He recorded that Mr Ram had said that the movement was relatively minor and in any event, the Claimants intended to construct a kitchen extension the following year. (The Second Claimant later said in his oral evidence that no such extension was done).

20. GAB Robins enclosed a further letter dated 25 October 2004 in which they said that they had concluded an investigation and concluded that the minor subsidence was caused by clay shrinkage by the nearby Scots Pine tree. They said they had done a CCTV survey of the drainage system and found no defects in it. The letter said that the Scots Pine tree had been removed in June 2003 (this looks like a typographical error; the date should probably read June 2004 – the Scots Pine had not yet been removed by the time of the January 2004 GAB Robins letter). The letter noted that the cracks had not moved ‘throughout the summer of 2004 which would confirm the minor subsidence which has taken place to your home is no longer active’. The letter confirmed that the subsidence had been corrected.

The 2012-2013 evidence

21. I have seen Google Street View photographs of the Property and 353, which bear the date September 2012. The address given on the photographs is slightly wrong (351 Cippenham Lane) and so the Second Claimant queries the reliability of the information printed on the photographs. It is the Defendant’s case that these photographs reveal a sag in the corner of the front gable of 353. I did not find that sag easy to see in the photographs but Mr Billingham accepted there was such a sag.

22. Another Google Street View photograph of September 2012 showed the Boundary Wall from the outside. The bricks of the Boundary Wall were of two different colours – those to the bottom left were darker and those to the top right were lighter. The divide between the two was step diagonal. I was later told that part of the Boundary Wall had been knocked over and replaced. The colouration is consistent with that. There was a tree close to the Boundary Wall in September 2012.

23. In July 2013 the Property was inspected by a surveyor called Mr Haq. He was not called as a witness. There is a very brief letter from him, dated 22September 2022, in which he said that he visited the Property in July 2013 and did not notice any structural defects or cracking in the render externally or in the living areas internally. I do not place any significant reliance on this letter – Mr Haq was not called as a witness and this letter was written a very long time after his visit to the Property and unsupported by contemporaneous notes.

The 2013 storms

24. On 20 October 2013 the Claimants made a claim for storm damage at the Property – in particular damage to a roof where an aerial fell and some roof tiles were dislodged. On 1 November 2013, in response to this claim, Integra sent Mr Robert Pitt, a loss adjuster, to investigate. Mr Pitt went to the Second Claimant’s bedroom to view the relevant roof – a single-storey kitchen roof. Mr Pitt also looked at a water stain in another room. Mr Pitt did not, during this attendance, inspect the front or rear gable. In an interim report dated 1 November 2013 Mr Pitt noted ‘no adverse underwriting features’ and commented on the details of the claims that the Claimants wished to make in relation to their kitchen.

25. On 24 December 2013 there were strong winds at the Property. The Second Claimant walked around the Property and 353 to investigate if there was any damage. He says he noticed slipped roof tiles and damage to the roof of the garage. He says a roofer was called. He inspected the two pitched rooves and the roofer discovered a loose/slipped roof tile and reinserted it.

The 2014 Storm

26. From 14-16 February 2014, there were very strong winds at the Property (“the February 2014 Storm”). Mr Beale later recorded the information he obtained from WeatherNet about the 2014 Storm. This showed that, at Heathrow Airport, there were average wind speeds of 36mph and gusts of 56mph. The Beaufort scale defines a storm as having a wind speed of 55 mph.

27. The Second Claimant says that, when he went outside on the morning of 16 February 2014, he could see evident storm damage, including scattered roof tiles at the front of the Property. The Second Claimant claims that, when he looked up, the apex of the Property looked different as some of it appeared to be missing.

The inspections before the claim

28. The Claimants used their British Gas Home Emergency Cover. On or around 20 February 2014 a roofer came. The roofer placed tarpaulin over the apex and said he could not do any more.

29. On 3 March 2014 Nationwide Surveying Solutions (“NSS”) attended the Property to inspect the damage. In a letter dated 3 March 2014, NSS said there were no signs of storm damage.

30. On 5 March 2014 a roofer attended from Home Assistance UK Roofing to remove the tarpaulin and replace missing tiles. He said that the gable and roof structure were dangerous and could collapse at any moment. He took a photograph which I discuss below (“the 5 March 2014 Photograph”). The 5 March 2014 Photograph is taken from above the apex of the roof and shows a gap at the top of the roof. The front post has become separated from the ridge board – in other words, the piece of wood at the top front of the house has become separated from the piece of wood that runs along the spine of the roof. There are gaps on either side too. Rusty nails are visible.

31. The Claimants called a company called Tangible to assist. Someone from Tangible came and they arranged for an engineer who said that the gable was damaged by the wind and scaffolding needed to be erected to make the gable safe. On 14 March 2014 Wayne Perry Scaffolding attended and confirmed that the Property was dangerous and scaffolding was required. The Claimants paid for the erection of scaffolding and have paid since then for the hire of scaffolding.

32. The Claimants did not accept NSS’s conclusions. They asked the Defendant to send someone else. They also reported to the Defendant some cracking they had noticed on the internal walls to the front of the house. They thought they may have been caused by the movement in the gable wall. The Defendant agreed to send Mr Pitt.

33. On 17 March 2014 Mr Pitt visited the Property. He was given access to the loft in 353. He formed the view that the damage to the gable wall was historic and not due to any recent storm but due to a failed cantilever beam within 353. Mr Pitt thought that the cracking in the Property was from another cause – possibly subsidence or structural failure. Mr Pitt arranged for Mr Burnham to inspect the cracking.

34. In a letter dated 21 March 2014, Mr Burnham said that the cracking he had observed at the Property was ‘not structurally serious’. It was generally under 1mm with a few that were ‘slightly wider than that’ but ‘only because they are old and the plasterwork has become detached’. He said that nearly all the external cracks were on the lines of previously repaired fractures and were old and not indicative of recent movement. Some of the internal cracks might be due to recent movement but the most likely cause was ‘simply expansion and contraction forces.’ He noted that other cracks were ‘also not at all consistent with being due to rotational failure and therefore ground related movement’.

35. In a letter dated 20 May 2014 Integra indicated that they were willing to pay the costs of stain blocking and repainting certain bedroom ceilings and walls under the policy.

36. On 13 October 2014 the Claimants made a further claim for storm damage (which is not the subject of this claim).

37. The Claimants instructed their own expert, Mr Ross of Berkshire Structures Ltd., to provide an opinion on the gable wall and the cause of the cracking at the Property. Mr Ross prepared two reports dated 20 November 2014.

38. In one of these 20 November 2014 reports, Mr Ross recorded that the front gable wall of the Property ‘bows outwards half way up [its] height by 60-70mm’. He said the cause of this distortion was ‘wind load on the gable’, in particular ‘wind suction’. He said the damage was ‘severe meaning that the gable is in danger of collapse’. He attributed the cause to the 2014 Storm. There was an error in this report as to prevailing wind direction (although this error may not have been significant if the wind was being deflected in any event).

39. In the second of these November 2014 reports Mr Ross opined that ‘historic subsidence’ had affected the Property ‘over many years’ and the recent movement was ‘not severe’.

The Dyno-Rod investigation and the drains

40. On 8 August 2019 Thames Valley Region Ltd (trading as ‘Dyno-Rod’) investigated the sewers and drainage at the Property. They found medium and large joint displacement near the rainwater drain at the front of the Property, between the lounge and the study. In a letter dated 15 August 2019 Dyno-Rod said the displaced joints were not deemed serious but ‘may be leaking’ so they recommended replacing the pipework. It is not clear when this recommendation was put into effect – the joint report of the experts records that Mr Billingham was told that the drains were replaced ‘around 2 years ago’, i.e. around 2023.

The claim

41. On 11 February 2020 the Claimants issued this claim (using the wrong name for the Defendant). The Claimants later amended the claim to use the correct name. The claim form said the amount claimed was £150,000.

42. On 17 March 2020 Mr Billingham inspected the Property and 353.

43. The Particulars of Claim, dated 1 June 2020, sought an indemnity in respect of storm damage and subsidence damage at the Property. The Particulars said the precise amount of the indemnity would only be established once the remedial works were undertaken but it was anticipated they would be around £131,500 plus scaffolding costs of £18,500.

44. Paragraph 7 of the Particulars of Claim particularised the storm damage. It alleged that the damage from the storm took various forms including (a) displacement of the front and rear gables, (b) a disconnection of some of the rafters to the ridge board, (c) a dislodging of the ridge tiles and some of the plain tiles of the Property, (d) damage to ceilings consequent on the foregoing, (e) distortion of the upstairs bay windows.

45. Paragraph 9 of the Particulars of Claim particularised the subsidence damage. It alleged that the damage from subsidence took various forms including (a) damage to the drains, (b) damage to the front, rear and flank walls, (c) damage to the kitchen, lounge, office and the front and rear bedrooms, (d) damage to the garage, (e) cracking throughout the Property consequent on the foregoing. There was no explicit reference, in the Particulars of Claim, to any damage to the Boundary Wall.

46. On 1 September 2020 this claim was allocated to the multi-track. On 18 March 2021 this trial was listed for 25 October 2021 with a time estimate of 5 days. This trial was vacated because it appeared that these proceedings might be joined with other proceedings relating to 353. The 353 claim was ordered to be case managed and tried with these proceedings but was settled before trial.

47. There was a lengthy procedural history which, for present purposes, I do not need to record in detail. The Claimants changed solicitors on several occasions. There were long periods in which the Claimants failed to prosecute their claim. This led to costs sanctions being imposed.

The expert evidence

48. On 14 December 2022 the Claimants served a structural engineering expert report from Mr Billingham in relation to both the Property and 353. This report was dated 14 December 2022 and related to inspections on 17 March 2020 and 29 November 2022. He said that it was ‘obvious’ upon visiting the site that movement of the external gables at the Property and 353 had occurred both at the front and back. He said he found ‘significant evidence of subsidence’ at 353. As to the Property, he recorded certain damage ‘relevant to the alleged subsidence damage’ including cracks (internally and externally) and a slope in the lounge and kitchen. The lounge had a slope of 40mm from the rear right hand corner to the front left hand corner and a similar slope in the kitchen.

49. Mr Billingham expressed the opinion that the gable wall damage to the front of the Property was ‘consistent with wind suction’ and he believed this was the explanation for the displacement of the gable at the time of the storm. He noted that the presence of other properties can reverse wind direction and produce wind eddies. He noted the sag in the front gable on 353 but discounted that as the cause of movement of the front gable to the Property. If that had been the cause, he explained, there would have been a distortion towards the cantilever. There was not. Instead, the rotation was outward.

50. As for subsidence, Mr Billingham said that the slope of the kitchen and lounge and the cracking and the defective drainage were ‘confirmation’ that subsidence existed. He said that the defective drainage at the front had caused the slope of the lounge floor. He said that the downward movement of the kitchen floor had occurred ‘reportedly following a flood causing subsidence to the timber floor’ and ‘this floor was reconstructed following the flood in 2014’. (I note that there is no other evidence of such a flood – the Second Claimant makes no mention of it in his witness statements or his oral evidence).

51. Mr Billingham said it was probable that the small tree to the front of the Property had caused subsidence to the Boundary Wall. He said the damage to the garage was ‘most probably drainage related as the drain runs just before the garage’. He proposed remedial works, including that the front gable is ‘rebuilt and tied back with metal straps’.

52. For the next two years, very little progress was made in the claim. The Claimants served reports from Bhangals, quantity surveyors, for the costs of works proposed by someone other than Mr Billingham (i.e. Silver Structural Surveys Ltd).

53. On 5 September 2025 the Defendant served a structural engineering expert report from Jon Beale, dated 5 September 2025. In that report, Mr Beale stated that the wind speeds at the time of the 2014 Storm were ‘insufficient to cause a well-maintained gable wall to fail’. He then discussed possible causes for foundation movement. He discounted subsidence as the cause because (a) the soil under the Property has minimal risk of subsidence from water extraction, (b) at the time of investigation there were no active tree roots. As to the Dyno-Rod report he said that if there was a leak then, due to the nature of the soil, ‘the effect would be localised as the soil will be free draining’. He also noted that it was a ‘low volume drain’ which collects rain from ‘a small area of roofing’. He said the most likely cause of any foundational movement was ‘seasonal movement’ which has a particular impact as the foundations are so shallow. He also noted that the external wall cracking was ‘inconsequential’. He said that the most important characteristics of subsidence cracking had not been demonstrated – the cracks were not wide enough, did not taper and were not diagonal. He noted that the internal cracks were less than 1mm and inconsequential. He said that the ground floors were concrete. (As it turns out, this was incorrect – the floors were timber; he made this error because the Claimants’ own quantity surveyors, Bhangals, identified the floors as concrete). He found the study floor to be level but a slight incline in the lounge. He conducted a detailed analysis of the garage cracking claim and identified a cause for it – i.e. a failed ceiling tie within the roof immediately above the crack. He took a photograph of the Boundary Wall from 4 August 2025 which appeared to show that the tree had been removed. He explained that he did not inspect the Boundary Wall as damage to the Boundary Wall did not form part of the pleaded claim.

54. On 13 November 2025 the experts filed a structural engineering joint expert report. In that joint report they agreed that there was no explanation as to why there was not ‘commensurate cracking in the walls in relation to the sloping lounge floor’. They agreed there was no evidence of internal wall cracking from tree-root-induced subsidence or drainage issues. They agreed that the kitchen floor needed further exposure to understand why it might slope. Mr Beale suggested it might have been the result of an extension. They agreed that there was no evidence that the rear gable wall suffered from damage from the 2014 Storm and there was no need to scaffold it.

55. On 13 August 2026 the quantity surveying experts met and agreed a joint statement. It was evident, from this report, that the value of the indemnity might be higher than suggested in the Claim Form and Particulars of Claim.

56. On 25 August 2026 Branch Austin McCormick LLP (“BAM”) filed a notice of acting on behalf of the Claimants. On 26 August 2026 the Claimants filed an updated Schedule of Loss claiming in the region of £420,000.

The Policy

57. The Policy defines a claim as a ‘single loss or series of losses arising from one event for which insurance is provided by this Policy’. In Section 1, there is a section headed ‘Basis of Claim Settlement’ which makes provision for what is to happen if the sum insured is not enough to pay for the full cost of rebuilding the whole buildings.

58. The Policy sets out what is covered. For each event that is covered there are specific exclusions. One matter which is covered is ‘storm or flood’. The specific exclusions include exclusions for loss or damage ‘due to any gradually operating cause’. Another matter which is covered is ‘subsidence or heave of the site on which the buildings stand, or landslip’. The specific exclusions include loss or damage ‘resulting from normal settlement, shrinkage or expansion’. It was explained to me, at the start of the hearing, that this ‘exclusion’ may have been simply to avoid doubt as to the meaning of subsidence. Subsidence, I was told by Mr Billingham, was downward movement of a property due to an external cause, such as tree roots or flood. As a result ‘normal’ movement of a house would not count as subsidence. For example, a house with low foundations might move up and down in the seasons as the level of moisture in the soil changes (or if there was frost and then thaw). This seasonal movement would not count as subsidence.

59. There are general exclusions in the Policy, including ‘Existing Damage’ – i.e. ‘any loss or damage occurring before the commencement of the first Period of Insurance’.

60. There was also a general exclusion for ‘Loss or damage which happens gradually over a period of time’. This general exclusion was cited in the Defence. I asked Mr Rothwell how that clause would operate with subsidence damage, given that subsidence damage happens gradually over a period of time. He said that, if it were established that the Property were damaged by subsidence in the Policy Period, he would not ‘press the point’ about this general exclusion.

61. The Home Insurance Schedule said that the ‘Sum Insured’ for Buildings was £250,000.

Preliminary Issues

The trial fee

62. I received a skeleton argument from Mr Rothwell the day before the hearing. In that skeleton argument, he submitted (among other things) that the trial fee had not been paid and the claim fell to be treated as having been automatically struck out, under CPR 3.7A1(7). I investigated this with the listings office. They informed me that notice of the hearing had initially been sent to the wrong recipient because the notice of acting, from BAM, had not been processed. They told me that this was rectified on 30 September 2026 by an email to BAM and the requests in this email were complied with. They said that this was why the case had not been struck out.

63. On the first morning of the hearing, I communicated this to Mr Rothwell. He said that his solicitors had forwarded the original notice of hearing to the Claimants. However, he accepted that an email forwarded in this way would not constitute notice for the purposes of CPR 3.7A1(7)(a). However, he suggested that the court may have sent other chaser emails before 30 September 2026 and these may have been to the current solicitors. I asked the listings office to investigate this and they said they could not find any such emails on the file. As a result, I am not satisfied that CPR 3.7A1(7) applies.

64. In any event, as I indicated on the first day of the hearing, even if the case had fallen for automatic strike out, I would have granted relief from sanction. The trial fee was paid. The delay in paying that fee did not prejudice the Defendant. And the primary reason for any delay in paying the trial fee appears to be that the notice to pay that fee was sent by the court to the wrong recipient.

The application to amend

65. When the hearing began, Mr Deacon informed me that there was an application to amend. I adjourned the hearing for approximately 30 minutes to read that application, which I received by email shortly afterwards. There was a witness statement from BAM which did not explain, adequately or at all, why the application was being made so late. The application was to amend the Claim Form (to increase the amount claimed to around £420,000) and to amend the Particulars of Claim to include particulars of loss in line with the Claimants’ Schedule of Loss.

66. Mr Deacon argued that there was no prejudice in granting the applications because there was no surprise – the new claims were for sums that had been set out in the quantity surveyor reports. I asked him why the application had not been made earlier and he did not have a good explanation. He said that he had only been instructed very recently. He speculated that his clients may have been waiting for previous counsel to draft the application. He pointed me to CPR 16.2(5) and CPR 16.3(7). The latter makes clear that the statement of value in the claim form does not limit the court’s power to give judgment for an amount which it finds the claimant is entitled to.

67. Mr Rothwell provided me with a copy of Quah Su-Ling v Goldman Sachs International [2015] EWHC 759 (Comm). He said this was a very late amendment. I queried whether it was a late amendment within the meaning of paragraph 38(c) of Quah, i.e. one which would cause the trial date to be lost. He said it was. He said that if this amendment were granted he would want to amend the defence – i.e. to rely on the section of the Policy dealing with the cost of rebuilding and argue that there was a maximum recovery under the policy of £250,000 for any ‘rebuilding event’.

68. I said at the hearing that I would not grant the application to amend. I gave summary reasons and said I would explain my reasons in full in the judgment. The reasons were as follows.

69. First, the application was extremely late and without good reason. The application was only made at the hearing. There was no good explanation for that lateness. The Claimants’ current solicitors were instructed from August 2026. The fact that the claim form and Particulars of Claim did not correspond with the figures in their own quantity surveyors’ report must have been immediately apparent.

70. Secondly, amendment is not necessary in order for me to give the Claimants the relief which I think is just. Even without the amendment, I have a discretion to award damages of over £150,000 – see CPR 16.3(7). One factor I could take into account, when deciding whether to exercise that discretion, is the fact that the Defendant was on notice, from the quantity surveyor reports and the Claimants’ Schedule of Loss, of the true value of the indemnities sought.

71. I made clear, when refusing the amendment, that this should not be taken as an indication that I would not exercise my discretion to award a higher sum than that pleaded if I thought it just. It follows, as Mr Deacon accepted, that there was no great prejudice to the Claimants in refusing the application.

72. Thirdly, granting the application could have led to delay and wasted costs. Mr Rothwell said that, if I granted the application, the Defendant would want to amend their Defence and vacate the trial and seek wasted costs. Mr Rothwell said they would plead a defence that the Policy limited the Claimants to £250,000 recovery for building costs, even if there were two claims. I am sceptical about whether that is a viable defence but, as the matter was raised so late, I had no proper opportunity to consider it. I made clear that Mr Rothwell could raise that defence in submissions on remedy.

73. Overall, it was not clear to me that the proposed amendments made any material difference. Further, if and in so far as they did make a difference, that would be unfair to the Defendant because the application was made so late and because there was no good reason for that lateness.

74. I gave a succinct version of the reasons above when refusing the application to amend. Mr Rothwell pointed out that a higher court fee needed to be paid for the value of the claim being pursued. Mr Deacon said that the Claimants would pay the additional trial fee required (£2,500).

75. Later in the hearing, after I had given my ruling, Mr Rothwell said that it had occurred to him that refusing the application to amend could have an impact on one matter – the claim for alternative accommodation would be time-barred. Mr Deacon said that he did not accept this claim was time-barred. I indicated that I could hear further submissions on this, at the remedy stage, if appropriate.

The Hearing

The opening and the letter from Mr Billingham

76. Mr Deacon indicated, in opening, that Mr Billingham was saying that his report ‘needs to be adjusted and amended’. I understood, from these submissions, that Mr Billingham wished to withdraw his agreement from some of the matters he had agreed with Mr Beale.

77. Mr Rothwell objected to this and said the evidence was closed. He said this was an attempt to revive an application that had been refused. I asked him what an expert is supposed to do if they change their mind and he said ‘write a letter to the court’.

78. I was informed that Mr Billingham had written such a letter to the court but it was not in the bundles. This letter had been served on the Defendant in support of an application. I gave permission for this letter to be added to the bundles. The Defendant had already seen this letter so there was no significant prejudice to them. I did not think it would be just for me to decide the case without knowing what Mr Billingham had said about how and why he wanted to change his position from that set out in the written reports.

The oral evidence

79. The Second Claimant gave oral evidence and stood by the evidence in his witness statement. He said that they lived by a main road and it was hard to keep the windows clean, so just because an external crack was dirty did not mean it was old. He said that NSS were ‘cowboys’ as they had said there was no evidence of storm damage even though there were tiles on the floor. He said all the nails in the roof were rusted. He accepted that he had taken advice that scaffolding was required. He said that originally, after the 2014 Storm, there were cracks only at the front of the house but as time went on cracks appeared elsewhere.

80. The Second Claimant accepted he had not done any trial pit investigation and had not monitored cracks. He accepted that his statement was wrong to suggest ongoing monthly costs of £480 for the scaffolding – the monthly cost had gone down at one point as VAT was taken off. He admitted that he had not provided up to date invoices but explained that was because he did not realise he needed to continue providing invoices after the date for disclosure.

81. In answer to my questions, the Second Claimant confirmed that the Property had been continuously insured up to the Policy Period for subsidence but not thereafter. He said he called Dyno-Rod because the drains kept getting blocked. I asked him when the drains started getting blocked and he seemed unsure. He suggested it may have been from 2011, as he had to move his car and that was around the time he first got a job. I asked him if the cracks had got worse and he said ‘extremely’.

82. Mr Pitt said he did not notice any cracking during his first visit in 2013. He said that that did not mean the cracks were not there as he was not there to report on cracks. He would not normally note minor cracks in a report about something else. During his second visit he had merely thought the cracking was possible subsidence but referred it to Mr Burnham who was an expert.

83. Mr Burnham gave evidence. He said that he did not find any evidence of subsidence on his inspection – the cracks were historic or insignificant. He said further investigation was not warranted.

84. Mr Billingham gave evidence. I told Mr Deacon that he had my permission to ask questions of Mr Billingham about why he had changed his position. Mr Deacon’s examination in chief was not, however, tied to the joint expert report. Mr Billingham made several references to a recent visit and photographs he had taken and expressed his frustration at not being able to show photographs to me. I was told that copies of these photographs were available. Mr Deacon applied orally to admit these photographs, which were all taken by Mr Billingham in August 2025 (“the August 2025 Photographs”).

85. Mr Rothwell objected to the admission of the August 2025 Photographs. He said it was unfair to expect him to have to adjust his cross-examination again. He also said that this was an attempt to revive an application already refused.

86. Over the short adjournment, I was provided with the application Mr Rothwell had referred to. That earlier application was not in the bundles. It was not, in fact, the same application. It was not an application to admit the August 2025 Photographs. It was an application to require Mr Beale to attend a site visit for opening up of the floor. In support of that application, the August 2025 Photographs had been exhibited and served on the Defendant.

87. I ruled that the August 2025 Photographs should be admitted. I considered that they might assist me to explain why Mr Billingham was changing his position – I used the term ‘rowing back’. I told Mr Rothwell he could have as long as he needed to formulate further questions on the August 2025 Photographs. I noted that the Defendant had received them before.

88. After I had given my ruling, Mr Billingham corrected me that he was not ‘rowing back’ from anything he had said before. He said that the purpose of the August 2025 Photographs was not to explain errors by him, but to show errors by Mr Beale. Mr Deacon proceeded to ask Mr Billingham questions about the August 2025 Photographs, which were not connected to any change in Mr Billingham’s position. For example, Mr Billingham pointed to one of the August 2025 Photographs and said they showed tree roots. I grew concerned that what was, in substance, happening was that the Claimants were obtaining a new expert report orally, by examination in chief. That is not the fair or proper process for putting new expert evidence before the court. As it transpired, for the reasons given below, none of the August 2025 Photographs assisted the Claimants’ case. If it had been otherwise, I would have invited submissions from the Defendant about how to rectify any unfairness from the late reliance on new expert evidence.

89. In cross-examination, Mr Billingham explained that his conclusions on wind directions were based on the direction of debris. He said that the Property was one of many houses and when the wind blows it gets affected by surrounding houses. He said that the front gable wall was a ‘very unrestrained floppy wall’. He accepted that it was ‘common sense’ that it was an error not to restrain the front gable, as the rear gable had been and this might have been an error in construction. He agreed that a photo suggested the eaves of 353 had sagged even before the 2014 Storm. He was taken to the 5 March 2014 Photograph. He said that nails can rust even inside timber in an attic and you could see from the fungi that the moisture was high. He said that at the time he wrote the joint agreement there was no evidence of storm damage to the rear gable but he had now exposed a crack in the rear gable. He pointed to one of the August 2025 photographs which showed a hairline crack in a brick wall, which he told me was the rear gable.

90. I asked Mr Billingham if the roof could have been in the condition shown by the 5 March 2014 Photograph, with just a roof tile above it covering the gap. He said that was very unlikely as that tile would have come off before. I asked him to imagine what he would have done if he had attended before the 2014 Storm and seen an unrestrained front gable wall with no tilt – would he have advised restraining the front gable? He said he would have done.

91. As to subsidence, he accepted the soil was ‘geotechnically low risk’. He denied that the soil was ‘virtually non-shrinkable’. He pointed to a page of the geotechnical report which he had not referred to in his report and said, looking at the figures for water content and plastic limit on the day in question (in August 2020), the soil was desiccated. He said that the August 2025 Photograph which he alleged showed tree roots was taken by the ‘flank wall’ on the right hand side. He admitted he had not sent off the tree roots for analysis and did not know what tree they belonged to or whether they were alive or dead. He accepted the photograph showed moisture and the ground was not desiccated at the time.

92. He admitted the patio was either poorly constructed or poorly maintained. He said the zig zag cracking on the Boundary Wall was disappearing towards a root and he did not need to do root testing. He accepted that the drain at the front of the property was a minor rainwater drain. He accepted there was no evidence of undue slope in the study. He said the foundations were ‘extremely’ shallow. He accepted that the expansion of the soil could cause cracking. He accepted that the cracking in the Property did not meet the usual definition of subsidence cracking, such as tapering and step diagonal cracks. He accepted the cracking was mostly hairline and he had not measured it.

93. He said that he had noticed the ceiling tie crack in the garage but had not recorded this in his report. He said that was because he thought it was irrelevant. It was put to him that it was a failure in his duties as an expert not to record this and he was acting more as advocate than expert. He vehemently denied this. He suggested the explanation for the garage crack may have been heave after the removal of the Scots Pine tree. He said you would normally expect heave within 5-10 years of a tree being removed.

94. Mr Beale gave evidence. He suggested that the 5 March 2014 Photograph showed an opening in the top of the roof, which had been there before the 2014 Storm but which was exposed by the removal of a roof tile.

95. In cross-examination, Mr Beale accepted movement of the lounge floor but not the kitchen floor. He said it had been difficult for him to measure the lounge floor as there had been so many people in there. He said he had not seen any root, or any vegetation that he could remember. He said the soil was virtually non-shrinkable. He said he had no idea how there could have been subsidence due to the Scots Pine tree but noted the damage was very minor, so minor it was covered by the excess. He clarified that he would not expect soil with a low plasticity index to be shrunk either by tree roots sucking out moisture or by flooding washing out fines.

96. He said that it was not clear to him that the gable had moved and he had not been able to measure the exterior. He was taken to the 5 March 2014 Photograph and said that if the nails had been freshly pulled out he would have expected to see different degrees of rust, between the part freshly exposed and the part exposed from the start (i.e. the head). He said that he and Mr Billingham had not been able to figure out what was going on with the lounge floor – it did not match the characteristics of subsidence as the floor tilt was not matched by wall cracking. He speculated it might be timber rot.

Principal Issues

97. Counsel helpfully agreed that the issues I need to determine in this judgment could be reduced to the following two questions:

i) Was damage caused to the front and/or rear gable wall by a storm in the Policy Period?

ii) Was damage caused by subsidence in the Policy Period?

98. The first of these questions assumes that the only storm damage was to the front and rear gable wall. In the Particulars of Claim it was said that the 2014 Storm caused other damage, such as disconnection of the rafters, dislodging of the roof tiles, damage to ceilings and distortion of the upstairs bay window. However, the roof tiles have been replaced and the ceiling damage paid for. In addition, even the Claimants’ own expert does not suggest that the rafters or upstairs bay window were damaged by the Storm. As a result, the liability issues reduce down to the two questions above.

Submissions

99. Mr Rothwell accepted that it was sensible to deal with liability first, as a kind of preliminary issue. However, he said that the evidence was ‘closed’.

100. Mr Rothwell referred me to Loveluck-Edwards v Ideal Developments Ltd et al. [2012] EWHC 716 (Ch) and Rhesa Shipping SA v Edmunds [1985] 1 WLR 948. I put it to Mr Rothwell that the relevant principle from these authorities can be explained as follows – if there are two identified possible causes for an event, A and B, and several other possible unidentified causes, it is not enough for the claimant to prove that A is more likely than B. It might be, for example, that there is a 10% chance of A, a 5% chance of B and an 85% chance of some other unknown cause. In such a case a claimant would not have proved, on the balance of probabilities, that the cause was A. Mr Rothwell accepted that was the relevant principle.

101. He said, applying those principles to this case, it is not enough to prove a claim for subsidence simply to show cracking. You have to prove the reason for the damage – why it was caused by subsidence or storm damage.

102. He took me through the expert reports and the evidence and argued that it was more likely that damage to the front gable and apex was historic. He relied on a photograph of a gap in the 353 front gable showing ‘detritus and cobwebs’. He argued that there would have been differential rusting in the 5 March 2014 Photograph if the nails had only recently been pulled out.

103. He said there was no evidence of subsidence in the Policy Period and movement above ground was not proof of subsidence. He said that Mr Billingham’s evidence was speculative. He said the height of the case on subsidence was the sloping floor in the lounge. He said if this was caused by subsidence one would expect both the lounge and the study to drop. He pointed out there was no cracking in the internal walls of lounge commensurate with the floor drop and so it was not a movement in the whole structure and could be floor rot. He noted that there had been a complaint about damage to the kitchen floor in the 2003 subsidence claim and the Second Claimant said that there had been no work since. He said that, with the exception of the garage and boundary wall, the cracking was not typical of subsidence cracking and was more likely due to seasonal movement resulting from shallow foundations.

104. As for the garage cracking he said the most likely explanation was the cracked tie. If it had been heave from the removal of the Scots Pine it would likely have happened much earlier. In any event, heave was not pleaded.

105. He said the step crack in the boundary wall could result from the fact that this wall was replaced previously, with a zig zag line between the old bricks and new bricks. The join could have been exposed by tree roots pushing up.

106. Mr Deacon took me through a number of detailed facts which he said were ‘common ground’. He then made submissions on the points of difference and relied on the evidence of Mr Billingham. He said that Mr Billingham had observed that the front gable was not plumb using a laser. He said the storm had created ‘incremental damage’. He said an insurer should pay for all the repairs. He gave an analogy to car insurance. If a car needs the front light replacing and the whole front is damaged in a crash, the insurer pays for all the replacement of the front. They do not deduct the cost of the light replacement which needed to be done anyway.

107. He referred me to Contract v Travelers [2018] EWHC 83 TCC, which was cited in his ‘skeleton opening’ – in particular to a passage which distinguishes positive evidence from direct evidence. On the facts of that case, the court found subsidence proved based on circumstantial evidence even though there was no direct evidence.

108. I asked him what his submission was on why only the lounge tilted, not the study. He submitted that the Dyno-Rod photographs showed that the leaking went left. I expressed surprise at this submission and asked him to explain it. He took me to the Dyno-Rod photographs but then turned around to take instructions and did not pursue the submission. He said there was no evidence of timber rot to explain the lounge tilt.

Discussion

(i) Was damage caused to the front and/or rear gable wall by a storm in the Policy Period?

109. In my judgment, it is more likely than not that the 2014 Storm caused damage to the front gable wall of the Property – i.e. causing it to tilt forwards. However, the Claimants have not proven, on the balance of probabilities, that the 2014 Storm caused any damage to the rear gable wall.

110. The reasons why I find that the 2014 Storm caused damage to the front gable wall are as follows.

111. First, I find that the front gable wall of the Property is tilting forwards. That is the evidence of Mr Billingham who took measurements with a laser. It is broadly consistent with earlier inspections, e.g. the roofers and scaffolders who noted a danger of collapse and Mr Ross who recorded evidence that it ‘bowed’ out in the middle. Mr Beale cannot contradict Mr Billingham’s evidence on this issue as he did not measure whether there was a tilt on the outside of the front gable wall.

112. Secondly, the first time anyone noticed any tilt in the front gable wall was after the 2014 Storm. It is possible that there was a forward tilt, which no one had noticed, predating the 2014 Storm. However, that seems unlikely. It seems more likely that someone would have noticed the tilt before – either the Second Claimant or his family, or the roofer who came and inspected the property after high winds in December 2013.

113. Thirdly, all the evidence indicates that there was a storm on 14 February 2014.

114. Fourthly, I find that tiles were found in the front garden after this storm. This was the consistent evidence from the Second Claimant and there is nothing to contradict it. The fact that tiles were found in the front garden suggests a suction effect on the front of the building from the winds. I accept the evidence of Mr Billingham on this point. I accept his evidence that, in an area with many houses, there can be suction in one direction even if the prevailing wind was in another direction. Mr Beale did not dispute that possibility in his report. He alleged that the Property was in ‘relatively open country’ but, for the reasons given above, I prefer the Claimants’ evidence on this issue and find that the Property is surrounded by houses.

115. Fifthly, the experts agree that the front gable wall of the Property was unrestrained. Mr Billingham described it as ‘very unrestrained’ and ‘floppy’. It seems logical to me that a floppy wall could be made to tip forwards by suction, even if the wind speeds were at the low end of ‘storm’ on the Beaufort scale. Mr Beale said that the wind speeds were insufficient to cause a ‘well-maintained gable wall to fail’ but this was not a well-maintained gable wall. It was a ‘very unrestrained floppy wall’ that was liable to be sucked out by a storm wind.

116. The Defendant argued that any tilt in the front gable wall was more likely ‘historic’ – i.e. it predated the 2014 Storm. They relied on the 5 March 2014 Photograph. In this photograph, one can just about make out nails which appear to have been pulled out of the wood either in the front post or from the ridge board. These nails appear rusted. The Defendant argued that the rust shows that the nails must have pulled out from the wood long before the photograph was taken. Mr Billingham gave evidence that nails inside wood in an attic may be rusted even if they are not exposed to the air. Mr Beale did not dispute that but said that, if the nails had been exposed relatively recently, he would have expected different colouration between the parts of the nail that had long been exposed to the air (i.e. the head) and the parts that had not. However, Mr Beale admitted that he was not an expert in metal rust. In my judgment, the 5 March 2014 Photograph does not greatly assist me as to the age of the damage to the front gable and roof. The photograph is blurry and it is difficult to see the nails. I cannot, for example, identify a part of the nail said to be a head. If (as appears to be accepted) nails can be rusted even inside wood, blurry images of apparently rusty nails do not help me identify a date for the damage to the front gable.

117. The other photograph which the Defendant relied on is a photograph taken from the inside of the front gable of 353. It shows a gap, at the top, between the end of the party wall and 353 front gable. In other words, it suggests a tilt forwards in the gable wall of 353. The Defendant relies on this because there is, as Mr Rothwell put it, ‘stuff’ in the gap. Mr Beale said in his report that this ‘stuff’ was straw and cobwebs. That is not obvious to me from the image. The existence of this stuff is said to support the Defendant’s argument that any tilting of the front wall was historic. That does not follow. The photograph was taken many days after the Storm. That was more than enough time for ‘stuff’ to collect and for spiders to make cobwebs.

118. On the other hand, I do not find that the 2014 Storm caused any damage to the rear gable of the Property. No one has recorded any tilt in the rear gable. Unlike the front gable, it was and is properly restrained.

119. The experts agreed in the joint report that there was no evidence that the rear gable was damaged by the 2014 Storm. I thought that was conclusive on this issue. When he came to give evidence, Mr Billingham vehemently denied that he was ‘rowing back’ from anything in the joint statement. However, once the August 2025 Photographs were produced, it became apparent that he was seeking to withdraw from this aspect of the agreement. One of the August 2025 Photographs showed a hairline crack in the rear gable wall. He said this had only been exposed and become apparent in 2025. In summary, Mr Billingham’s position appeared to be that what he had said in the joint statement was correct at the time but was now shown to be incorrect. All of this was raised for the first time orally. In this oral evidence, Mr Billingham did not give any adequate explanation as to why I should find that the hairline crack in the rear gable wall, first observed in 2025, was caused by the 2014 Storm. As a result, the Claimants fall a very long way short of demonstrating, on the balance of probabilities, that the damage to the rear gable wall (namely a hairline crack) was caused by the 2014 Storm.

Subsidence

120. For the following reasons, the Claimants have not discharged the burden of proving that there is damage to the Property caused by subsidence during the Policy Period.

121. First, there is no evidence that, during the Policy Period, the soil under the Property was affected by any of the things which cause subsidence. There is no evidence that the soil, in the Policy Period, had shrunk due to tree root desiccation. Nor was there any evidence, in the Policy Period, of flooding causing the soil to shrink by washing away the fines. On the contrary, the geotechnical expert evidence indicated that the soil beneath the Property had a plasticity index of below 10%. That means it is a low risk of subsidence because it is very unlikely to shrink.

122. In cross-examination, Mr Billingham suggested that the soil under the Property may have been desiccated. He pointed to a page of the geotechnical report which he had not referred to in any of his written evidence. If the Claimants were going to rely on this page, there should have been written evidence from Mr Billingham as to its significance and a fair opportunity for the Defendant to respond. As this point was raised orally in the hearing, Mr Beale had no proper opportunity to respond. What Mr Beale was able to confirm, in response to my question, was that soil with a low plasticity index is unlikely to shrink even when desiccated. As a result, I did not think that the page of the geotechnical report which Mr Billingham relied on in his oral evidence assisted the Claimants. At most it showed that, in August 2020, the soil outside the Property (including in the location of the rainwater drain) was (just) desiccated. If the soil is unlikely to shrink significantly, even when desiccated, then it does not matter if the soil was (just) desiccated at one point in the summer six years after the Policy Period.

123. I do not consider the Claimants’ case on subsidence to be materially advanced by the August 2025 Photograph which allegedly shows small tree roots. It was not obvious to me, or to Mr Beale, that this photograph showed tree roots. No testing has been done in relation to these alleged tree roots to show what they are, or whether they are alive. Even if there were tree roots near the house in 2025, it does not follow that there were tree roots near the house in the Policy Period, over 10 years before. In any event, on the evidence of Mr Beale, tree roots would be unlikely to cause shrinkage in this particular kind of soil.

124. Secondly, there were not and are not in the Property the hallmark signs of subsidence, as defined by the Institution of Structural Engineers – i.e. diagonal cracking, wider at one end than the other, starting and widest at a ‘free edge’, travelling around openings and being matched on the outside and inside of the property. I leave aside, for the moment, the Boundary Wall and the garage. In the Property itself there is no diagonal step cracking. Nor is there any tapering or wide cracking. Instead, the only cracking in the Property is minor hairline cracking of a kind that does not suggest subsidence. This minor cracking could have many potential causes, other than subsidence, but the most likely appears to be the fact that the Property is not and never has been stable – it sits on ‘extremely’ low foundations and so is liable to move during normal seasonal changes in the soil.

125. I asked Mr Billingham if the high point of his evidence of subsidence was the tilt in the lounge floor and he agreed it was. The lounge floor tilts in the direction of a minor rainwater drain, which was outside the Property, in the middle between the lounge and the study. There was a letter from Dyno-Rod, that there ‘may be’ leaking in a junction of the pipe, around half a metre from this rainwater drain. Mr Billingham’s evidence was that this leaking would likely have washed away fines and led to a shrinkage and subsidence in the corner of the lounge nearest the drain.

126. There are several reasons why this does not prove the Claimants’ case on the balance of probabilities.

127. First, it is speculative. Dyno-Rod did not go so far as to say there was a leak, only that there may be one. In any event, given the low plasticity of the soil and the fact that this is a minor rainwater drain, it does not seem likely that a leak in this particular drain would lead to soil shrinkage or subsidence. Further, if there had been soil shrinkage at the point of the possible leak, it is difficult to understand why this shrinkage only affected the floor to the lounge, not the floor to the study which is equally close to the affected drain. In addition, the experts agreed there is no ‘commensurate’ cracking in the walls of the lounge to match the floor tilt. That is what one would expect if the whole structure was tipping down towards the drain. There are other possible explanations of the floor tilt in the lounge – e.g. timber rot. It is not possible for me to establish why the lounge floor tilts down but it has not been proven, on the balance of probabilities, that this tilt in the lounge floor was caused by subsidence.

128. Secondly, and in any event, even if and in so far as the tilt in the lounge floor is evidence of subsidence at all, it is not evidence of subsidence in the Policy Period. Dyno-Rod’s report records an investigation approximately 5 years after the end of the Policy Period. There is no evidence either that the drain was leaking in the Policy Period or that the floor tilted in the Policy Period. The first recording of a floor tilt in the lounge was many years after the Policy Period.

129. Mr Billingham did not rely nearly as much on the tilt in the kitchen floor. I received no clear explanation from him as to how this might be caused by subsidence. In his report, he suggested that there had been a flood in that region but that was not supported by the Second Claimant’s evidence. I note that the kitchen floor was alleged to be damaged in the 2003 subsidence claim but the insurer did not pay for it to be repaired. There was no evidence that it has been repaired since then. It appears that the unevenness in the kitchen floor may be very long-standing. Certainly, it has not been proven on the balance of probabilities to be caused by subsidence in the Policy Period.

130. There is evidence, however, of step-cracking in the Boundary Wall and the garage. However, that does not prove the Claimants’ case.

131. The Particulars of Claim do not, it seems to me, refer to damage to the Boundary Wall at all. Paragraph 9(b) pleads damage to the ‘front, rear and flank walls’ but I read that as referring to the walls of the Property itself, not the Boundary Wall at the other end of the front garden. Paragraph 9(b) pleads ‘cracking throughout the Property consequent on the foregoing’ but that does not appear to cover damage to the Boundary Wall which is not consequent to the other damage.

132. Further and in any event, I do not have any evidence that the Boundary Wall suffered damage in the Policy Period. I have photographs of the Boundary Wall, from 2012 and from 2025. In the 2012 photograph I can see no cracks in the Boundary Wall. The bricks do, however, bear different colourings. There is a zig-zag pattern, with lighter bricks on the top right corner and darker bricks on the other parts. In the August 2025 Photographs there is zig-zag cracking in the Boundary Wall. This could be caused by subsidence but it could also have other causes (e.g. tree root growth etc). It is not necessary for me to make a finding on whether the cracking in the Boundary Wall, visible in 2025, has been caused by subsidence because there is no evidence to indicate that this damage occurred during the Policy Period.

133. The garage is expressly referred to in paragraph 9(d) of the Particulars of Claim. The crack in the garage wall tapers. Mr Beale has an explanation for this crack which is, on the face of it plausible – i.e. that it was caused by a crack in a ceiling tie. Mr Billingham made no mention of the ceiling tie crack in his report (even though he says he noticed it). Mr Billingham put forward an alternative theory – i.e. that there was heave after the removal of the Scots Pine tree. Even if this theory were right, it would not prove what the Claimants need to prove for two reasons. First, it would be damage by heave, not subsidence. The Particulars of Claim do not allege heave. Secondly, Mr Billingham’s evidence was that heave usually occurs within 5-10 years of a tree being removed. The Scots Pine tree in the rear garden was removed approximately 10 years before the Policy Period. If there was going to be heave as a result of that removal, it would likely have happened and become visible before the Policy Period.

134. In short, neither expert’s evidence supports the Claimants’ case that the garage was damaged by subsidence in the Policy Period.

Conclusion

135. For the reasons given above, I find that the front gable of the Property was damaged by the 2014 Storm. To that extent, the claim succeeds. The Claimants have not proved that there was any damage to the rear gable as a result of the 2014 Storm. Nor have the Claimants proved any damage from subsidence during the Policy Period.

136. I will receive written submissions on what order should follow from this judgment. If there are matters of dispute, I will provide a short supplementary judgment together with my order.

For advice on a matter of this kind in France, contact our business lawyer in Paris.


Open Justice Licence (The National Archives).

Neighbouring decisions

Preliminary case review

Send your documents. Receive an analysis.

Send us the documents in your case. Hassan KOHEN reviews them personally and sends you a first written analysis of your situation within 24 working hours.

  • Written analysis by the lawyer, €80 incl. VAT
  • Personal reply within 24 working hours
  • 100% confidential, legal professional privilege guaranteed
  • Up to 1 GB of documents in total, folders and sub-folders accepted
80 €incl. VAT

Preliminary review of your case. Review of your documents and a first written analysis by Hassan KOHEN within 24 working hours. Payment is made online after this form is submitted.

  • Up to 1 GB of documents in total, folders and sub-folders accepted
  • Secure payment, no card details stored
  • Terms and fee agreement

Click or drag your files here
All formats accepted (PDF, Word, images, etc.)

Sending...

Payment constitutes a request for immediate performance of your analysis. Your data is used solely to process your request.
Terms · Privacy policy.

IA juridique gratuite

Une question de droit ? Demandez à Judith.

Judith cherche dans les codes, la Constitution, la Convention européenne des droits de l’homme et les décisions des juges, puis vous montre les textes et les passages d’arrêts qui pourraient répondre à votre question, avec leur source officielle. Gratuite, sans compte, elle ne rédige rien à votre place. Découvrir Judith, l’IA juridique gratuite du cabinet.

Trois recherches par jour, sans compte. Votre question est enregistrée et relue par le cabinet pour améliorer l’outil : n’y mettez ni nom ni information sensible.